20017 - Stormwater Pump Station #6 State and local opportunity open City of Norfolk 20017 Posted: 2026-11-11T13:00:00.817Z Response deadline: 2026-12-18T21:00:00.000Z The work includes the demolition, replacement, and relocation of electrical control systems and equipment from the pump station control room to the existing generator building. Also included are miscellaneous electrical and SCADA control work and all associated site work, including maintenance of traffic. The Contractor will be required to keep the pump station in operation to the maximum extent practical during construction. A bypass pumping system capable of handling a minimum of 2,000 GPM will need to be designed, installed, and maintained by the Contractor for the period between the removal of existing electrical equipment and controls and the start-up and acceptance of the new electrical equipment and controls. The Contractor will be required to clean the wet well prior to final completion of the project. Cleaning shall be done using the inlets in the travel lane while personnel access will be from the center of Tidewater Drive. SCHEDULE OF UNIT PRICES For Stormwater Pump Station #6 The unit prices have been computed in accordance with Paragraph 7.3.3.2 of the General Conditions of the Contract for Construction (as amended). Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. The prices quoted shall include, without exception, all materials, labor, equipment, appliances, clean-up, applicable sales, use and other taxes, building permits or fees, and the Contractor's labor, overhead, profit, mobilization, and other mark-ups, and in full accordance with the Specifications. Include allowance for waste where appropriate. The unit prices shall be maintained throughout the contract period. Unit prices shall be used in determining additions or deductions from the TOTAL CONTRACT AWARD amount in the event of changes in the work. The contract shall be awarded on grand total basis, which is the total of lump sum and unit prices. Items left blank or marked $0 shall deem the bidder non-responsive. Alternates to specifications may be offered; however, the bidder shall provide descriptive literature on all alternate items. Failure to provide descriptive literature shall deem the bidder non-responsive. Bidder shall note if the alternate is an equal or of lesser qualifications and explain. Pump Station Upgrade and Site Work Maintenance of Traffic Bypass Pumping Thermo-trol Support (Per Quote) - Enter Unit Cost of $109,000.00 Project Details Important Bid Details Work to be Substantially Completed in: 230 calendar days Liquidated Damages: five hundred dollars ($500.00) per day Performance Bond: one hundred percent (100%) Payment Bond: one hundred percent (100%) Bid Bond: five percent (5%) Closing Date/Time: Friday, December 18, 2026 4:00 pm Physical Correspondence All physical correspondence will be sent to the address shown below and include the Project ID and Project Title. Ken Peacock , Design & Construction Contracting Specialist Project - 20017 : 20017 - Stormwater Pump Station #6 City of Norfolk, Public Works 810 Union St, 7th Floor Norfolk VA, 23510 Plan Holders List / Project Followers Upon request, contact Ken Peacock at kenneth.peacock@norfolk.gov . Please also check the Followers Tab on this e-Procurement Portal. Other Methods to Receive Bidding Documents Bidding Documents are available from the Department of Public Works at no cost by download at https://procurement.opengov.com/portal/norfolk/projects/290161 or from the City of Norfolk’s website, http://www.norfolk.gov/bids.aspx . A Bid Bond, certified check, or cashier’s check made payable to the Treasurer, City of Norfolk, for five percent (5%) of total bid must accompany each bid. Offerors shall upload a copy of the bid guarantee with the Offeror’s acknowledgement to mail the original sealed document to the Owner, within two (2) business days. State Contractor registration class and number is required by electronic bidding via the Vendor Questionnaire. The City reserves the right to cancel the bid opening or to reject any or all bids in whole or part, when it is in the best interest of the City. The right to waive informalities and to determine responsiveness of any bid and responsibility of all bidders is reserved to the City. Withdrawal of bids will be in accordance with Section 33.1-42.1 of the Norfolk City Code and Section 11-54 of The Code of Virginia, 1950 (as amended). Introduction Summary Background Contact Information Timeline Vendor Questionnaire Unit Price Bid Bid Award shall be based on the lowest responsive and responsible Total Bid regardless of whether the City elects to award any or all of the Add Alternates. Attachments Source: OpenGov https://procurement.opengov.com/portal/norfolk/projects/290161 Canonical URL: https://govcontractfinder.com/contracts/20017-stormwater-pump-station-6-opengov-757-project-290161