2026 Road Resurfacing Program State and local opportunity open Wayne Township 677 Posted: 2026-11-24T14:00:00.979Z Response deadline: 2026-12-08T16:00:00.000Z It is the intent of these Supplementary Specifications from the Township of Wayne, Passaic County, to outline the requirements for the resurfacing of various streets and locations throughout the Township. The work shall include milling existing pavement, repairing existing base as required, constructing new Hot Mix Asphalt Surface Course, constructing handicap ramps as specified, and related items. Technical Specifications SECTION 100 - GENERAL PROVISIONS It is the intent of these Supplementary Specifications from the Township of Wayne, Passaic County, to outline the requirements for the resurfacing of various streets and locations throughout the Township. The work shall include milling existing pavement, repairing existing base as required, constructing new Hot Mix Asphalt Surface Course, constructing handicap ramps as specified, and related items. The work shall also include resurfacing, gravel parking areas, and sidewalk construction on various Board of Education locations throughout the Township. The headings of the Sections, Subsections, and Subparts contained herein conform to the New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction 2007 (Standard Specifications) and all addenda and amendments thereto. Unless specifically revised or deleted hereinafter, the Standard Specifications shall govern in its entirety. All references to Sections, Subsections or Subparts with respect to Revisions or Deletions refer explicitly to the New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction 2007. Whenever in the New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction 2007 any reference is made to the State, Commissioner, Department or the like, it will be construed to mean the Township of Wayne. The list of streets, Township locations and Distribution of Quantities are in APPENDIX C - LISTS. SECTION 101 - GENERAL INFORMATION 101.03 TERMS THE FOLLOWING TERMS IN THIS SUBSECTION ARE REVISED: Department. The Department of Public Works, Division of Engineering of the Township of Wayne, Passaic County, New Jersey. ME. The Township Engineer of the Township of Wayne, County of Passaic, New Jersey, or his duly authorized representative or agents, authorized to act within the scope of particular duties assigned or authority given. MUTCD. Manual on Uniform Traffic Control Devices for Streets and Highways. RE. The Township Engineer of the Township of Wayne, County of Passaic, New Jersey, or his duly authorized representative or agents, authorized to act within the scope of particular duties assigned or authority given. Specifications. The compilation of provisions and requirements for the performance of prescribed work contained in the Standard Specifications and the Supplementary Specifications. State. The Township of Wayne, County of Passaic, New Jersey. The following replaces the third provision: 3. Days on which weather and working conditions permit the Contractor to make effective use of not less than fifty percent (50%) of the usual daily man-hours during regular working hours. The following terms are added to this Subsection: Designated Project Manager (DPM). For questions about this project and payment requests, contact Jonathan Pera – Township Engineer, 475 Valley Road, Wayne, NJ 07470. (973)-694-1800 x3333. Drawings. Drawings shall mean all sketches, plans, surveys, or reproductions of same pertaining to the construction of the structures and appurtenances. Laboratory. The testing laboratory or laboratories designated by and acceptable to the Engineer. Police. A designated officer of the Wayne Township Police Department Traffic Bureau. Supplementary Specifications. This document for You, for the full and complete performance of the contract and for the payment of all debts and obligations pertaining to the work. Township. The Township of Wayne, Passaic County, New Jersey. Written Notice. Written notice shall mean notice which has been duly served when delivered to or at the last known business address of the person, firm or corporation for whom intended or when enclosed in a prepaid postage wrapper or envelope addressed to such person, firm, or corporation at the last known business address and deposited in a United States mailbox. All notices sent by mail shall be certified, and the time or receipt shall be used for the determination of any waiting period for action to be taken as called for in the contract document. You (Your). Prior to issuance of a Contract, “You” and “Your” shall refer to any and all prospective bidders. After award of the Contract, “You” shall refer to the Contractor, the successful bidder. Any unreferenced requirements provided in these Supplementary Specifications specifically refer to “You” as defined herein. SECTION 102 - BIDDING REQUIREMENTS AND CONDITIONS 102.01 QUALIFICATION TO BID THIS SUBSECTION IS DELETED. 102.02 BIDDER REGISTRATION AND DOWNLOADING OF THE PROPOSAL DOCUMENTS THIS SUBSECTION IS DELETED. 102.04 EXAMINATION OF CONTRACT AND PROJECT LIMITS THIS SUBSECTION IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: Carefully examine the streets of the project prior to submitting bids. No plea of ignorance of conditions will release You from fulfilling the requirements of the Supplementary Specifications in every detail, nor be accepted as a basis for claims for extra compensation. Bidders must examine and consider the streets and their surroundings. They must satisfy themselves as to the nature of the existing railways, roads, or other means of communication, the access and egress from the streets and work, the available accommodation as regards land for temporary purposes (within or without the site), buildings that may be required for temporary purposes, and must make their own inquiries as to work yard sites and such other additional areas as they may require for temporary occupation all for executing, completing and maintaining the project in connection with the Contract Documents. Persons bidding must make local and independent examination and inquiries as to the physical conditions prevailing at the streets and obtain their own information on all matters and things that may in any way influence them in making a bid and fixing the unit prices and extended totals in the Bid; they must also satisfy themselves as to the risks, obligation and responsibilities to be undertaken in the Contract to be entered into by them should their bid be accepted. At the time of the opening of Bids, each bidder will be presumed to have inspected the site of the proposed work and to have read and be thoroughly familiar with the Plans, Supplementary Specifications and Contract Documents, including all addenda. The failure or omission of any bidder to receive or examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his Bid. You are hereby notified that it will be Your responsibility to obtain information which you may require as to subsurface conditions and the location of underground utilities. You will carry out the work specified in full accordance with the Supplementary Specifications and instructions of the Township, or its duly authorized representative. The Township reserves the right to alter such lines and grades as the RE may deem necessary. SECTION 103 - AWARD AND EXECUTION OF CONTRACT THIS SECTION IS DELETED. SECTION 104 - SCOPE OF WORK 104.01 INTENT The following is added: The Distribution of Quantities is in APPENDIX C - LISTS 104.02 VALUE ENGINEERING THIS SUBSECTION IS DELETED. 104.03.03 TYPES OF CHANGES THIS SUBPART IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: 1. Quantity Increases and Decreases. You are advised that NO CHANGE IN UNIT PRICE WILL BE MADE FOR ANY ITEM IN THE BID REGARDLESS OF THE EXTENT OF INCREASE OR DECREASE IN THE FINAL CONTRACT QUANTITY. This provision pertains to ALL items. 2. New Work. When directed by the RE, You shall submit a detailed cost proposal for performance of New Work. New Work shall be considered only for items not specifically included in the Bid Form. No New Work shall be performed until a Unit Cost has been mutually agreed on in writing. The value of such extra work shall be determined in writing in one of the following ways: A. By estimate and acceptance in a lump sum. B. By cost and percentage or by cost and a fixed fee It is understood that the Township reserves the right to have any New Work done by any person, persons, or corporation other than You if an agreement upon the prices to be paid for such New Work cannot be promptly reached between the Township and You. You also agree to make no claim for damages or for any privileges or rights other than that provided in the Contract by reason of such work by others. 3. Changes in the Character of Work. You are advised that NO CHANGE IN UNIT PRICE OR CONTRACT AMOUNT WILL BE MADE FOR ANY CHANGES IN CHARACTER OR WORK unless such change results in A New Work item as defined in Number 2 of this Subsection 104.03.04 CONTRACTUAL NOTICE THIS SUBPART IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: It is Your responsibility to provide written notice to the RE within five (5) working days when circumstances are believed to constitute a change to the Contract. If You claim that any instruments, be they drawings or otherwise, involve extra cost under this Contract, give written notification to the RE within forty-eight (48) hours after the receipt of such instructions. In any event, before proceeding to execute the work, meet with the RE to afford the opportunity to modify the design or construction procedure, to establish the validity and the value of the claim. IF YOU SHALL CLAIM COMPENSATION FOR ANY ALLEGED DAMAGES SUSTAINED BY REASON OF ACTS OF THE TOWNSHIP, OR ITS AGENTS, IMMEDIATELY NOTIFY THE RE SO THAT A PROPER APPRAISAL CAN BE MADE. WITHIN FIVE (5) DAYS THEREAFTER, SUBMIT TO THE RE A WRITTEN STATEMENT AS TO THE NATURE OF THE DAMAGE AND AN ITEMIZED STATEMENT OF THE AMOUNT CLAIMED FOR SUCH DAMAGE. NO SUCH CLAIMS SHALL BE ENTITLED TO PAYMENT UNLESS AS HEREINABOVE SPECIFIED. IF YOU DO NOT PROVIDE THE NECESSARY NOTIFICATION AFTER RECEIPT OF INSTRUCTION WITHIN THE TIME SPECIFIED, OR IF YOU DO NOT PROVIDE THE NECESSARY WRITTEN STATEMENT CONCERNING DAMAGES WITHIN THE TIME SPECIFIED, THEN YOU SHALL AND HEREBY DO AGREE TO WAIVE THE CLAIM FOR SUCH ADDITIONAL COMPENSATION OR EXTENSION OF TIME OR BOTH. HOWEVER, IF YOU HAVE COMPLIED WITH ALL THE FOREGOING PROVISIONS, THESE CIRCUMSTANCES IN NO WAY SHALL BE CONSTRUED AS PROVING THE VALIDITY OF THE CLAIM. THE CLAIM WILL BE PASSED ON BY THE RE, AND IF HE FINDS IT TO BE JUSTIFIABLE UNDER THE PROVISIONS OF THE CONTRACT, THE WORK OR MATERIALS IN QUESTION WILL BE PAID FOR UNDER AN APPROPRIATE CONTRACT CHANGE. ATTENTION IS DIRECTED TO THE PROVISIONS OF 104.03.03 REGARDING LIMITATION OF THE INCREASE AND REDUCTION OF QUANTITIES OF CONTRACT ITEMS. In accordance with the provisions of N.J.S.A. 40A:11-50, the parties agree that disputes arising under this contract shall be settled by mediation in accordance with the Public Sector Mediation Rules of the American Arbitration Association. Notice of demand for mediation shall be filed in writing with the other party to this Agreement and with the American Arbitration Association. During the mediation proceedings, You shall proceed diligently with the performance of the contract and the Township shall continue to make payments in accordance with the contract. In the event the dispute is not resolved by mediation then either party may submit to dispute to a Court of competent jurisdiction for adjudication. In no event shall a demand for mediation be made after the date when the institution of legal or equitable proceedings based on such a Claim would be barred by the applicable Statute of limitations as determined by the Laws of the State of New Jersey. 104.03.05 UNRECOVERABLE COSTS THIS SUBPART IS DELETED. 104.03.06 UNACCEPTABLE COST CALCULATION METHODS THIS SUBPART IS DELETED. 104.03.07 TRACKING COSTS THIS SUBPART IS DELETED. 104.03.08 FORCE ACCOUNT THIS SUBPART IS DELETED. 104.03.09 DELAY DAMAGES THIS SUBPART IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: There will be NO additional compensation for any delays to the Contract or extension of Contract Time. THE FOLLOWING SUBSECTION IS ADDED: 104.04 SCHEDULE OF SUBMISSIONS Bid and Construction documents shall be submitted in accordance with the tentative schedule which can be found under attachments. SECTION 105 - CONTROL OF WORK 105.01.01 RE THIS SUBPART IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: The RE will furnish Supplementary Specifications for the project as specified in 105.04, furnish information on all alignment control points, furnish bench marks if shown on the Plans, and make all necessary measurements for certification of quantities for payment on monthly and final estimates in accordance with 109.05. The RE will give instructions necessary to attain due and full effect of the provisions of the Supplementary Specifications. Should any differences of opinion arise as to the meaning or intent of the Supplementary Specifications, his decision shall be final and conclusive. All materials and work shall be subject to his inspection and approval or acceptance of materials furnished or work performed does not commit the RE to acceptance thereof if said materials or work do not conform to the requirements of the Plans and Supplementary Specifications. The above constitutes the controls to be furnished by the RE. You shall furnish all other work required for the layout and construction of the project. 105.01.02 INSPECTION THIS SUBPART IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: Inspection Services for Saturdays, Sundays, Holidays and Off-Hours. The wages and overhead of inspectors employed by the Owner will be paid by the Owner except the cost of such services required any time on Saturdays, Sundays, off-hours, or legal holidays for Wayne Township employees shall be borne by You. The amount to be paid for by You for inspection work required on Saturdays for Wayne Township employees shall be at the rate of sixty five dollars ($65.00) per hour per man. The amount to be paid for by You for inspection work required on Sundays for Wayne Township employees shall be at the rate of ninety seven dollars ($97.00) per hour per man. The amount to be paid for by You for inspection work required on legal holidays for Wayne Township employees shall be at a rate of one hundred thirty dollars ($130.00) per hour per man. The amount to be paid by You for inspection work required on weekdays, outside of the hours 8:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m. for Wayne Township employees shall be at a rate of sixty five dollars ($65.00) per hour per man. This rate shall also apply to all weekday inspection services performed in accordance with 108.20. Prior written approval shall be required of the Township RE to work Saturday, Sunday, Wayne Township holidays, and off-hours. The official holidays that are observed by the Township are as follows: New Year's Day Martin Luther King's Birthday Observed President’s Day Observed Good Friday Memorial Day Observed Independence Day Labor Day Columbus Day Observed Election Day Thanksgiving Day Day after Thanksgiving Christmas Day All costs for inspection to be paid by You will be deducted from monies due or to become due You on any given monthly payment. The inclusion of pay rates for inspectors in the above paragraph does not indicate or Guarantee that the Township will grant permission to work outside the weekday 8:00 a.m. to 4:00 p.m. hours. Other Inspection Fees. You shall pay the inspection fees required by the County, State, all railroads and other authorities having jurisdiction. The Township shall have the right to inspect all materials and work performed during any phase of construction; and You shall provide all reasonable facilities for the safe and convenient means of such inspection. No work shall be closed or covered until it has been duly inspected and approved. Should unapproved work be covered, You shall, if requested by the RE, uncover all such work for inspection. The cost of uncovering the work and replacement shall be borne by You. Re-inspection of questioned work may be ordered by the RE and if so ordered the work must be uncovered by You. If such work is found to be in accordance with the Contract Documents, the Township shall pay for the cost of re-inspection and replacement. If such work is found not to be in accordance with the Contract Documents, You shall pay the cost of reinspection, repair and replacement unless you can show the defect in the work was caused by a third party; and in that event, the Township shall pay such cost. Any compensation due You in this instance shall be determined by agreement and included in a contract change to be issued on completion of the project. 105.02.01 LABOR AND EQUIPMENT THE FOLLOWING IS ADDED TO THIS SUBPART: The working force, equipment and working site You provide for the project shall at all times be adequate and sufficient to insure the completion of the project within the time stipulated therefore. When, in the opinion of the RE, the working force, the equipment or the working site, or any or all of them, are inadequate or insufficient to insure completion within said time, the RE may order You to correct the deficiency and You shall comply with such order. Successful bidder is advised that no more than two (2) items of work required under this contract can be performed at any given time and/or the successful bidder (contractor) cannot work on more than two streets at any given time. You and Your Subcontractor(s) shall not engage, on a full or part time or other basis during the period of the Contract any of the professional or technical personnel of the Township, or of any state, county or Township, who are or have been at any time during the period of the Contract or for thirty (30) days prior to the award of the Contract, in the employ of such public agencies, except regularly retired employees, without the written consent of the public employer of such personnel. To the extent that labor employed by You, both skilled and unskilled, is available in the County or Township in which the work is located, You shall employ such labor from lists containing the names of persons resident in the County or Township. You shall also furnish to the Township the telephone numbers of Your superinte SECTION 106 - CONTROL OF MATERIALS 106.01 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS THE FOLLOWING IS ADDED TO THIS SUBSECTION: When weight slips are required for payment, these slips must be legible weigh tickets which have affixed the signature and seal of a certified weighmaster, and the name of the street for which the material was supplied must be affixed. If any of these conditions are violated, the weigh ticket will not be accepted. It is Your responsibility to verify that the weigh slips have all the required information. If a ticket is not accepted, it will not be considered for payment. NO TICKETS WILL BE ACCEPTED ON THE NEXT DAY AFTER DELIVERY 106.03 FOREIGN MATERIALS THIS SUBSECTION IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: Only manufactured and farm products of the United States, wherever available, shall be used pursuant to N.J.S.A. 40A:11-18. 106.04 MATERIALS QUESTIONNAIRE THE FIRST PARAGRAPH OF THIS SUBSECTION IS DELETED AND THE FOLLOWING IS INSERTED IN ITS PLACE: Provide the list of materials at the Preconstruction Meeting as required in 154. THE FOLLOWING SUBSECTION IS ADDED: 106.10 STOCKPILING MATERIAL You shall not stockpile any material (i.e. stabilized base, pipes, clean stone, Q.P. stone, etc.) on any public street or right-of-way. All material shall be directly unloaded into the excavate Source: OpenGov https://procurement.opengov.com/portal/waynetownship/projects/289462 Canonical URL: https://govcontractfinder.com/contracts/2026-road-resurfacing-program-opengov-973-project-289462