2027 Construction Code Emergency Call-Outs State and local opportunity open Wayne Township CCCO-2027 Posted: 2026-11-02T15:00:00.627Z Response deadline: 2026-12-18T17:00:00.000Z The intent of this document is to outline the requirements for supplying Construction Code Emergency Call-Out Services to the Township of Wayne, Passaic County, NJ, as needed for Code Enforcement. Emergency Call-Out Services shall include boarding up of windows and doors, boarding of wall openings, building temporary walls, winterizing domestic water and systems and tarping. Project Details CONTRACTOR'S OBLIGATION 1. The contractor shall list on the appropriate form herein any and all vehicles and equipment they shall provide in order to efficiently perform the work, and said contractor shall be solely responsible for the safe, proper and lawful use and maintenance of the contracted equipment. Further, the contractor shall secure all licenses; registrations and insurance certificates required of him by law and this proposal for the execution of this work and shall comply with all Federal, State and local laws, ordinances or other regulations relating to the performance of this contract. 2. Call-out is defined as the contractor being contacted by the Construction Code Official, Director of Public Works, or Business Administrator or designee and arriving at the work scene prepared to begin working immediately. GENERAL REQUIREMENTS AND PROCEDURES 1. Contractor must have the equipment and manpower available and on-hand in order to perform the work in a timely fashion, as stated herein. 2. After the contract is signed and executed, the Township shall place the contractor on rotation. The Construction Code Official, Director of Public Works, or Business Administrator or designee on an as-needed basis, shall contact contractors by telephone. 3. When contacted by a Township official, the contractor shall respond to a the call or voicemail (if voicemail is necessary) within ninety (90) minutes. 4. Should the Township fail to reach the contractor on the first attempt, a second call shall be placed within a reasonable length of time. If no response again, the contractor shall be considered to be in default of his contract, and the Township shall contact the next contractor in rotation. 5. Should the contractor refuse to respond to the Township's call-out due to other commitments a total of three (3) times, he shall be automatically considered in default of his contract and shall not be entitled to be called out again. 6. The Township shall inform the contractor what and where the job is, and when it needs to be finished. 7. Call-Out work is of an emergent nature, and unless advised by the Township in writing prior to performing work, call-out work shall be performed at a flat rate, listed herein. EQUIPMENT All equipment must be in first class operating condition. OPERATING EXPENSES All operating expenses of the vehicle and driver such as, but not limited to, liability insurance, workmen's compensation, social security, meals, repairs, etc. shall be borne by the contractor. SUB CONTRACTING Sub contracting SHALL NOT BE ALLOWED under this proposal. Each contractor shall enter on the Contractor's Information Sheet only equipment owned; insured and registered by said contractor. CONTRACT After the award of a contract, each individual contractor shall be required to sign a written agreement. SAID AGREEMENT MUST BE RETURNED TO THE LEGAL DEPARTMENT WITHIN TEN (10) BUSINESS DAYS AFTER RECEIVING THE AGREEMENT. An insurance certificate, with coverage of at least the amount specified below, shall be submitted as part of the signed contract. INSURANCE REQUIREMENTS 1. All vehicles used in the performance of this contract must be covered by liability and property damage insurance as mandated by the State of New Jersey Compulsory Motor Vehicle Insurance Law 39:6B-1. Every owner or registered owner of a motor vehicle registered or principally garaged in this State shall maintain motor vehicle liability insurance coverage, under provisions approved by the Commissioner of Insurance, insuring against loss resulting from liability imposed by law for bodily injury, death and property damage sustained by any person arising out of the ownership, maintenance, operation or use of a motor vehicle wherein such coverage shall be at least in: o An amount or limit of $15,000.00, exclusive of interest and costs, on account of injury to, or death of, one person, in any one accident; and o An amount or limit, subject to such limit for any one person so injured or killed, of $30,000.00, exclusive of interest and costs, on account of injury to or death of, more than one person, in any one accident; and o An amount or limit of $5,000.00, exclusive of interest and costs, for damage to property in any one accident. HOLD HARMLESS 1. The contractor shall indemnify and hold harmless the Township of Wayne for liability from any and all obligations, liabilities, judgments, claims and demands, for personal injuries, including wrongful death as well as all claims for damages to property which may arise out of this agreement and the work performed hereunder, provided same results from the negligent actions or omissions of the contractor. 2. The contractor further agrees to save and hold harmless the Township and to defend at its own cost and expense any such claims, or lawsuits instituted by third parties against the Township, provided same results from the negligent actions or omissions of the contractor. INVOICE 1. Invoices shall specify, in detail, the services performed during the prescribed period, the amount claimed and correlation between the services claimed and the Schedule of Prices. 2. Payment shall be made only for actual work performed (start to finish). No waiting or stand-by time shall be considered for payment. EACH NEW CALL OUT MUST BE BILLED SEPARATELY. 3. Before and after pictures should be submitted with the invoice. ADDITIONAL WORK 1. For any additional services, the contractor will submit a quote to the Township prior to beginning work 2. The Township will review and approve any additional work PAYMENT Payment shall be made only for actual work performed (start to finish). No waiting or stand-by time shall be considered for payment. EACH NEW CALL-OUT MUST BE BILLED SEPARATELY. (A payment voucher shall be filled out by the contractor) 2027 CONSTRUCTION CODE EMERGENCY CALL-OUT PRICE LIST The vendor agrees to furnish services as specified herein according to the below Schedule of Prices and shall comply with all the requirements herein. Service Detail Price Day Call-out (7:30am-4:30pm) $158.00 Night Call-out (4:30pm-7:30am) $210.00 Board-up single windows (less than 15 sq. ft.) $79.00 per opening Board-up double windows (15 sq. ft. to 30 sq. ft) $126.00 per opening Board-up triple windows or larger (more than 30 sq. ft) $4.75 per sq. ft. Board-up basement type windows (less than 6 sq. ft.) $34.00 per opening Board-up single entry doors $79.00 each Board-up garage and larger doors $4.75 per sq. ft. Board-up wall openings $7.00 per sq. ft. Build temporary walls $3.75 per sq. ft. Winterize domestic water system $368.00 Winterize heating system $210.00 Tarping (less than 15 sq. ft.) $79.00 Tarping (15 sq. ft. to 30 sq. ft) $126.00 Tarping (more than 30 sq. ft) $4.75 per sq. ft. Introduction Summary Background Contact Information Timeline Vendor Submissions Source: OpenGov https://procurement.opengov.com/portal/waynetownship/projects/318941 Canonical URL: https://govcontractfinder.com/contracts/2027-construction-code-emergency-call-outs-opengov-973-project-318941