2027 Pavement Preservation Package State and local opportunity open Greenville County IFB #27037 Posted: 2026-11-27T13:00:00.733Z Response deadline: 2026-12-18T20:00:00.000Z Greenville County Engineering and Maintenance is looking for qualified bidders to perform asphalt surface treatments on various rural roads in Greenville County. The surface treatments include Asphalt Single Treatment (chip seal), Fog Seal, and Rejuvenating Scrub Seal. Specifications for the project include SCDOT and NCDOT Standard Specifications. Some full depth patching will also be required on a portion of the road list. See project strip maps for more details. This is a re-solicitation of a pavement preservation project that was advertised in 2025. Quantities may have changed from previous advertisement due to changing field conditions. Electronic Pricing Form for 2027 Pavement Preservation Package Mobilization Traffic Control Full Depth Asphalt Pvmt. Patch- 4" Uniform Full Depth Asphalt Pvmt. Patch- 6" Uniform Rejuvenating Scrub Seal Asphalt Surface Treatment (Single Treatment) Fog Seal 4" WH.SLD.LINE-PVT. EDGE F.D. PAINT 4" YEL.SLD.LINE-CENTER F.D. PAINT 24" WH. SOLID LINES F.D. PAINT Scope of Work Scope A. Scope This work shall consist of furnishing all labor, material, and equipment necessary to perform all operations for the application of fog seal and rejuvenating scrub seal surface treatments to asphaltic concrete surface courses. The work includes surface preparation, application of fog seal, and application of rejuvenating scrub seal with fog seal as specified for each roadway section. All work shall be in accordance with the specifications (including attached NCDOT specifications, NCDOT authorized), the applicable drawings, and subject to the terms and conditions of this contract. B. Material Specifications: Asphalt Single Treatment: Asphalt Single Treatment materials and installation shall adhere to the SCDOT Standard Specifications for Asphalt Single Treatment. Fog Seal: Fog seal materials shall conform to the requirements specified in the attached NCDOT Fog Seal Specification. The fog seal shall be applied at temperatures of 130°F to 160°F, complying with weather and seasonal temperature limits as specified, with the exception that fog seal shall be applied at 60°F and rising to ensure proper bond to the underlying surface. Each bidder must submit with their bid a certified statement from the fog seal manufacturer showing that the material conforms to the required physical and chemical requirements per the NCDOT specification. Rejuvenating Scrub Seal: Rejuvenating scrub seal materials shall conform to the requirements specified in the attached NCDOT Scrub Seal Specification. The scrub seal system shall include the rejuvenating emulsion and aggregate as specified. Rejuvenating Scrub seal will be measured and paid for by the square yard of the complete application. Emulsion will be included in the square yard pay item for Rejuvenating Scrub Seal. Each bidder must submit with their bid a certified statement from the scrub seal manufacturer showing that the materials conform to the required physical and chemical requirements per the NCDOT specification. Project Specifications This project shall be constructed in accordance with The South Carolina Department of Transportation Standard Specifications for Highway Construction, 2025 Edition, current Supplemental Specifications, and these special provisions. The project owner is Greenville County. Any references to SCDOT or the Department in the Standard Specifications shall be interpreted as referring to Greenville County. References to the Resident Construction Engineer (RCE) shall be interpreted as referring to the County Engineer or their representative Project Schedule A full project schedule shall be submitted to Greenville County, no less than 7 days before the pre-construction conference. The schedule shall include road names or geographic areas and anticipated dates when work will occur in those areas. The schedule should also include all pertinent major activities and durations, including which crews will be preforming each activity, if working with more than one crew. Once the work has commenced, the contractor shall submit to Greenville County and other key stakeholders, as deemed necessary by the county, via email a 4-week look ahead schedule at least every two weeks until the work is complete. Each 4-week look ahead schedule shall be updated with current planned activities and contain all the information referenced above. Failure to provide the overall schedule and/or 4-week look ahead schedules within the required timeframe may result in payments being withheld until issue is corrected. Agency Project Manager Greenville County will manage the construction of this project. The Project Manager (PM) will be the primary contact for Greenville County in all matters pertaining to this project. Contractor's Designated Project Manager The contractor shall appoint a single Project Manager for this contract who will be the primary contractor representative for the duration of the project. The Project Manager shall be available at all times during the project in the event of an emergency that requires immediate action. The Project Manager shall have experience and technical knowledge about each work item in the project and be able to make decisions in the field on behalf of the contractor. The Project Manager’s contact information shall be shared with all Greenville County personnel on the project as well as any relevant consultants hired by Greenville County. Construction Delays The contractor shall communicate all construction delays immediately in writing to the County Engineer or their representative. The County Engineer may grant extensions on the contract for delays caused by circumstance outside the contractors control such as weather or unforeseen conditions. All extensions shall be in writing. Traffic Control Traffic control shall be fully provided by the contractor and shall adhere to the SCDOT standard specifications, SCDOT Standard Drawings, the latest edition of the MUTCD, and the following additional requirements: Unless otherwise approved by the County Engineer or their representative, roads shall remain open to local traffic at all times during construction of this project. The contractor must make every effort to reduce delays to local traffic with the exception of requests that will reduce quality of install materials, increase the project cost, compromise safety, or cause significant delays to the project. The County Engineer or their representative has the final say in what is considered a reasonable timeframe. It is the contractor’s responsibility to communicate with and instruct local traffic when it is safe to pass. Residents and businesses must be granted access to their property via existing driveway aprons at all times except when the apron is actively being worked on or has not built up strength yet to support traffic. All road closures must be approved by the County Engineer or their representative. Should the contractor deem it necessary to close a road to all traffic during a construction operation, they must submit a detour plan at least 2 weeks before the road closure is planned to take place. The County Engineer or their representative must approve the closure and detour plan in writing. Failure to set up and operate an approved traffic control operation is grounds for suspension of work operations until the issue is corrected to the satisfaction of the County Engineer or their representative. The contractor is responsible for notifying the media, the school district, and emergency services of any road or lane closures. The contractor shall only use traffic control devices on the SCDOT approved products list unless given permission to do otherwise. The county may grant the use of other traffic control devices on a case by case basis. Requests to use non-approved products must be made in writing at least two weeks prior to any planned use of that product. When the project requires the use of permanent construction signs, the signs must be removed within 2 weeks of installation of the final paving or surface treatment. The two-week timeline shall apply separately for each road on the contract. Temporary constructions signs must be removed the same day of substantial completion of paving or surface treatment. Public Notification The contractor is responsible for notifying residents and businesses within the project boundaries of the upcoming work. A notification shall be made in the form of either "A-frame" signs at both ends of the project or doorhangers placed on the front door of each residence or business. The notification material shall include special instructions and timing information as required by the County Engineer or their designated representative. If the contractor uses "A-frame" signs, the signs should be clearly legible from a vehicle. All notification materials shall be approved by the County Engineer before commencement of work. Protection of Existing Facilities It is the contractor’s responsibility to protect all existing utilities and stormwater infrastructure during each phase of this projects. During surface treatment projects, the contractor must protect all valve and manhole covers from damage or covering of any material. Valves and manholes must be accessible and easily locatable by the utility companies at all times during this project. Care should be taken to not overspray material on concrete, brick, or other features that are to remain in place after the completion of this project. It is the contractor’s responsibility to supply all materials needed to protect said facilities. The county engineer or their representative may require specific items to be covered and protected for the duration of the project. Costs associate with protection of existing facilities shall be included in the contractor’s unit bid prices for the applicable work item. Staging Areas The contractor is responsible for obtaining all necessary staging areas for materials and equipment related to the project. Should the County Engineer or their representative permit the contractor to use County Maintenance Facilities as staging areas, the contractor shall return the affected areas to their original condition or better, upon completion of the work. The contractor shall not store any materials within the road right-of-way unless given specific permission to do so. The county shall not be liable for any damages or claims related to staging areas the contractor obtains on private property. Operating Hours The contractor shall not perform any work on the project after sundown or before the sunrise. There must be adequate lighting on the project at all times when work is occurring. The contractor shall not perform any major operations before 9:00am or between 4:00pm and 6:30pm which may cause delays to commuter. Exceptions may be made in areas that do not receive heavy traffic and are not near a school. What is considered as not receiving heavy traffic or near a school is at the discretion of the County Engineer or their representative. Greenville County reserves the right to prohibit work during certain high traffic volume holiday periods. These restrictions, if any, will be communicated to the contracture during the pre-construction conference. Cleaning The contractor is expected to keep the site in a clean and tidy manner. Cleaning is expected to take place daily during an operation. Cleaning may include mud that is tracked into the roadway from the construction site or other debris build up as required by the County inspector. Claims All claim related to the project shall be resolved by the contractor through the contractors claims department. Greenville County shall not be liable for claims or complaints against work or actions performed by the contractor on this project. The contractor shall inform the county of all claims and complaints made related to the project. Bituminous Fog Seal Specifications See attached specifications Bituminous Scrub Seal Specifications See attached specifications Project Location(s) See attached Strip Maps Public Notice Greenville County is soliciting sealed bids in response to 2027 Pavement Preservation Package , subject to the conditions and all provisions set forth herein and attached. Sealed bids will be received through the County’s online procurement Portal located at https://procurement.opengov.com/portal/greenvillecounty until Friday, December 18, 2026 , 3:00 pm , then publicly opened. The service must be furnished as described and specified herein and submitted to Greenville County. All inquiries regarding this bid shall be submitted no later than Thursday, December 10, 2026 , 2:00 pm via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this IFB to receive an email notification when answers are posted. It is the responsibility of the Offeror to check the website for answers to inquiries. Introduction Summary Background Contact Information Timeline Instructions to Offerors Pre-Bid Meeting A Pre-Bid meeting is not scheduled for this project. Pricing Pricing must be based upon payment in thirty (30) days. Unit pricing will govern over extended pricing, unless stated otherwise. Pricing shall include packing. Unless indicated by County, pricing must be firm. Lump sum pricing must be all inclusive. If a bid sheet is attached to this IFB, and there are other charges not listed on the bid sheet, those charges must be listed in a lump sum. A break down list of pricing can be uploaded with the response. The County reserves the right to ask for any breakdowns of the pricing. Vendors shall enter pricing in the Pricing proposal section. Submission Procedures and Requirements All submissions must be received by Friday, December 18, 2026 at 3:00 pm . Submissions will not be accepted after the deadline. There will be no exceptions. Responders submitting proposals shall be responsible for all cost of preparing such bids. Information requested and not received at time of submission may disqualify the bid. Responders to this solicitation shall closely examine the specific requirements noted herein and the attached Terms and Conditions. Facsimile transmittals, emails, hard copies or offers communicated by telephone will not be accepted or considered. License and Permits – The Contractor shall obtain all applicable licenses and permits, and promptly pay all taxes required by the State of South Carolina, and/or Greenville County Submission Checklist Company background and information. Experience with similar scope and size of project. References with contact information for recent clients. Current licenses and certifications required for this type of work. Sample Certificate of insurance meeting the requirements. Completed the electronic pricing proposal . Bid Bond Requirements: Submit ONE of the following prior to bid opening: Original hard copy delivered to Procurement Services, OR Cashiers Check - 5% of bid, OR Surety 2000 electronic version submitted through the OpenGov system. Deviations from these requirements may result in bid rejection. Statement of Qualifications Vendor shall include the following with their response: A. Company Information - Basic company details, years in business, location B. Relevant Experience - Similar projects completed C. References - Contact information for recent clients D. Licensing/Certifications - Required trade licenses, certifications E. Bid Bond Requirements: Submit ONE of the following prior to bid opening: Original hard copy delivered to Procurement Services, OR Cashiers Check - 5% of bid, OR Surety 2000 electronic version submitted through the OpenGov system. Deviations from these requirements may result in bid rejection. Inquiries and Addenda Offerors shall submit all inquiries regarding this bid via the County’s online procurement portal, located at https:// procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement portal. Offerors may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. The County will not be responsible for or bound by any oral instructions made by any employee(s) of the County in regard to this IFB. Addenda Notification: This IFB represents the most definite statement Greenville County will make concerning information upon which proposals are to be based. Offerors are required to register for an account via the County’s online procurement portal hosted by OpenGov. Once you have completed the registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is sole responsibility of each proposer to periodically check the site for any addenda at https:// procurement.opengov.com/portal/greenvillecounty . No addenda will be issued later than five (5) working days prior to the date for receipt for proposals except an addendum which, if necessary, postpones the date for receipt of proposals or cancels this IFB. Vendors shall acknowledge receipt of all addenda General Information Proprietary Information – The County of Greenville is a public body and governed by the South Carolina Freedom of Information Act. Documents submitted to the County relating to this Solicitation are subject to requirements of the Freedom of Information Act and may be deemed public records. Errors and Omissions – The Responder will not be allowed to take advantage of any errors or omissions in the Invitation for Bids. Where errors or omissions appear in the IFB, the Responder shall promptly notify the County of Greenville in writing of such error or omission it discovers. Any significant error, omission and/or inconsistency in the specifications are to be reported as soon as possible but no later than five (5) days before such time the response is to be submitted. Withdrawal of Proposal – An official representative of a Responder may withdraw a Responder’s response at any time prior to the bid submission deadline. Acceptable proof establishing that he/she is the representative of the Responder must be provided. Non-Endorsement – If the County awards a contract, the successful Responder shall not issue any news release or other statement relating to the award or servicing of the agreement which state or imply the County of Greenville’s endorsement of the successful Responder’s services. Insurance Insurance Requirements The contractor is responsible for and must have all required insurance listed below and shall not commence work under the associated contract until it has obtained all insurance required, and the County has approved such insurance in writing, nor shall the Contractor allow any subcontractor to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained. All insurance policies shall be maintained for the life of the contract. THE COUNTY SHALL BE NAMED AS “ADDITIONAL INSURED” FOR ITS INTEREST on all policies of insurance except Worker’s Compensation, Automobile Liability, and Professional Errors and Omissions, as regards ongoing operations, products and completed operations, and this shall be noted on the face of the Certificate of Insurance. As a part of the certificate of insurance requirement the contractor shall also include acknowledgement and acceptance of the wavier of subrogation provision granted to Greenville County. This acknowledgement and acceptance should be included in the same section of the Certificate of Source: OpenGov https://procurement.opengov.com/portal/greenvillecounty/projects/327558 Canonical URL: https://govcontractfinder.com/contracts/2027-pavement-preservation-package-opengov-864-project-327558