2027PS001 - Campus-Wide Fire Alarm System Replacement State and local opportunity open Ontario International Airport 2026-IFB-086 Posted: 2026-09-25T22:27:28.037Z Response deadline: 2026-12-07T22:00:00.000Z The Ontario International Airport is seeking a bidder to design, construct, permit, install, retrofit and replacement of the existing campus fire alarm systems at the Ontario International Airport located at 2900 E. Airport drive, Ontario California. Scope of Work This is the detailed description of the Scope of Work, including objectives, tasks, deliverables, and any specific requirements relevant to this project. Successful vendor will be responsible for the following: General Description The Ontario International Airport Authority (OIAA) is soliciting bids from qualified contractors for the campus-wide replacement of existing fire alarm systems serving 29 facilities at Ontario International Airport (ONT) and the establishment of centralized fire alarm monitoring within the Airport Control Center (ACC). The project will provide fully addressable, code-compliant, non-proprietary fire alarm systems connected through the existing campus fiber optic network. The centralized system will receive fire alarm, supervisory, and trouble notifications from connected facilities. Work includes furnishing the labor, materials, equipment, and services necessary for system replacement, integration, testing, and commissioning in accordance with the Contract Documents. The completed systems shall accommodate future campus expansion, and fire alarm protection shall be maintained throughout construction. Project Overview and General Requirements The OIAA is proceeding with a campus-wide fire alarm replacement and will establish centralized fire alarm monitoring for 29 facilities. The centralized monitoring system will be located within the Airport Control Center (ACC). All fire alarm control panels (FACPs) shall communicate with the ACC FACP through the existing campus fiber optic network infrastructure. Fire alarm network communications utilizing the existing campus fiber optic network infrastructure shall be coordinated with OIAA Information Technology personnel and comply with OIAA network and cybersecurity requirements. The ACC shall receive all fire alarm, supervisory, and trouble notifications from connected facilities. Fire alarm signals must continue to be transmitted to a third-party 24-hour UL-listed monitoring service in accordance with applicable California Building Code requirements. Direct notification to the Fire Department is not required provided that approved third-party monitoring is maintained. The replacement system shall be designed as a non-proprietary system and shall provide the capability for future expansion. The design shall accommodate future connections to Terminal 3, future parking structures, central utility plants, and other future airport developments. Junction boxes and other infrastructure necessary to facilitate future expansion shall be provided throughout the campus where appropriate. Continuous fire alarm protection must be maintained throughout construction. Where fire alarm systems must be temporarily impaired, provide temporary protection measures, fire watch personnel, and impairment procedures in accordance with NFPA standards and OIAA operational requirements. The Contractor must provide a new centralized fire alarm monitoring system located within the Airport Control Center (ACC) that is fully compliant with CBC, CFC, OIAA, and insurer requirements. The centralized monitoring system must: Monitor all campus fire alarm systems described in the previous section Include all network hardware, software, servers, gateways, and interfaces necessary for a complete operational system Provide reporting and event history capabilities Maintain operation during communication failures in accordance with NFPA 72 requirements For each facility the Contractor must perform: Integrated system testing Acceptance testing Fiber network testing Final commissioning Testing shall be performed in accordance with NFPA 72 and applicable California codes. The proposed replacement will provide new, fully addressable, and code-compliant systems designed for long-term supportability. The upgraded systems must also be compatible with the fire alarm system to be installed at the ACC, enabling seamless integration for centralized monitoring and coordinated campus-wide life safety operations. Contractor provides licensed Fire Alarm Designer/Engineer. Design must be prepared, signed and stamped as required. Contractor is responsible for permit-ready and construction documents. The OIAA review does not relieve Contractor of design responsibility. The Contractor is responsible for corrections/revisions required by AHJ. All costs associated with Permit fees, Plan-check fees, Re-submittals, Fire Marshal inspections Testing, Corrections, Final approval Certificate/approval documentation is part of the contractor scope. The Airport reserves the right to proceed with all, or a portion of the work based on the availability of funding. The Airport may elect to phase, reduce, defer, or otherwise modify the scope of work as necessary to remain within available funding. The Contractor shall coordinate with the Airport regarding any such changes and shall provide pricing for individual bid items or work components as requested. Specs or Service Requirements Please see: Attachment_A_Technical Specifications Attachment OIAA - General Conditions - 2027PS001 Campus Wide Fire Alarm Replacement Attachment OIAA - Special Provisions - 2027PS001 Campus Wide Fire Alarm Replacement Attachment_D-Cost_Proposal OIAA Ontario Airport Fire Alarm Acceptance Criteria Contractor meeting all the requirements of the contract documents, including contract, plans, specifications, Minimum Qualifications. Minimum Contractor License qualifications: Class A General Engineering Contractor Class B General Building Contractor C-10 Electrical Contractor C-16 Fire Protection Contractor At the time of bid, the Contractor must possess a valid contractor license with one of the above classifications. The Contractor's failure to possess the specified license shall render the Bid as non-responsive and shall act to bar award of the contract to any Bidder not possessing said license at the time of bid, unless exempted by federal or state law. Contractors must demonstrate successful experience performing airport, campus-wide, or similarly complex fire alarm replacement projects. The contractor must employ personnel with current NICET Level-III Fire Alarm Systems certification or hire who will be directly responsible for system design oversight, installation supervision, testing, and commissioning. Work Plan Construction documents which include specifications and plans outlining and describing the work can be found in the Attachments section of this IFB. Anticipate Contract Term Proposers should anticipate entering into an agreement with the OIAA for a term of 2 years in the third quarter of the 2026-2027 Fiscal year. Introduction Summary Background Contact Information Timeline Agency Background The Ontario International Airport Authority (OIAA) is a joint-powers authority (JPA) formed between the City of Ontario and San Bernardino County as a public agency in Southern California. The OIAA Commission consists of five appointed members. The OIAA is the owner and operator of Ontario International Airport (ONT). ONT is a medium hub airport serving more than 6.4 million passengers per year and is a major air cargo facility in Southern California, with more than 750,000 tons being carried to and from the airport each year. Pre-Bid Meeting - Virtual A non-mandatory Pre-bid Meeting will be held virtually via Microsoft Teams Webinar on the date and time listed in the “Timeline” section of this solicitation. The meeting will be conducted in Pacific Time (PT). The OIAA strongly recommends that at least one (1) member of each proposing firm attend, as pertinent information regarding the solicitation and anticipated services may be discussed.Registration is required to attend the Pre-bid Meeting. Firms must register using the link below. Upon registration, participants will receive the meeting access link and additional details. Microsoft Teams Webinar Link: https://events.gcc.teams.microsoft.com/event/ca7f6fc5-4dbf-48a6-9a63-8ac0e89085f0@726bed49-7011-47d7-8024-49cdc0e9cae8 Job Walk A Job Walk will be held on the date and time listed in the "Timeline" of this solicitation. Attendees shall meet at the following location: 1923 E Avion St., Ontario CA, 91761 The group will depart promptly at 11:00 a.m. Please arrive by 10:45 a.m. to allow time for check-in. The Job Walk may include visits to the following facilities, but is not limited to: Terminal 2 Terminal 4 CONRAC FIS The OIAA highly recommends that at least one (1) member of your team attend this Job Walk as pertinent information regarding the project will be shared. Registration The deadline to register for the Job Walk is September 30, 2026, at 5:00 p.m. Pacific Time. Each attendee must register individually through the Eventbrite link below. Multiple representatives from the same firm may attend, provided each person registers. A confirmation email with details will be sent to each registrant. Regisration link: Job Walk - 2027PS001 - Campus-Wide Fire Alarm System Replacement Security Requirements Attendees may be subject to security screening. Backpacks are discouraged and may be searched if brought to the Job Walk. Attendees who do not comply with security screening requirements may not be permitted to participate. Only registered attendees will be allowed to participate in the site visit. All attendees must have a valid government-issued photo ID in their possession at all times during the Job Walk (e.g., DL, U.S Passport, etc.). Attachments Bid Instructions All interested vendors are required to submit all bids/proposals and questions electronically through OpenGov by the deadline listed above. Use " 2026-IFB-086 - 2027PS001 - Campus-Wide Fire Alarm System Replacement " as the subject line for all submissions. Hard copies will not be accepted. All submissions must be in the following format: Portable Document File (PDF) While there is no formal file size limit, larger files may result in longer upload times. We recommend keeping files sizes to 15MB where possible. OIAA may choose to print your submission, paper size should not exceed 8.5-inch by 11-inch. The main body fonts must be a minimum of 12 points, figure captions and callouts may use smaller fonts. A one-page cover must state the " 2026-IFB-086 - 2027PS001 - Campus-Wide Fire Alarm System Replacement " and include the prime firm name, contact person name, direct telephone or mobile phone number, and email address Page count should not exceed thirty (30) pages. (Excluding the Administrative Requirement documents) (Failure to include this information on the cover may result in disqualification). Submission Instructions Bid Form and Schedule of Work and Prices The bid must state the amounts for which the bidder proposes to supply all material and perform all work required by the Contract Documents. The Unit Price shall be provided in words, and Total Price shall be written in figures. The Project Total shall be written in words and figures. All blank spaces in the bid must be properly filled in, and the phraseology must not be changed. Modifications are not permitted. Any space left blank, any unauthorized addition, change, condition, limitation or provision attached to the bid may render it non-responsive and may cause its rejection by the OIAA. Alterations by erasure or interlineations must be explained or noted on the bid over the signature of the bidder. No telegraphic modification of a bid will be considered. Bidders must acknowledge receipt of all addenda in the space provided. The bid shall meet all of the requirements set forth herein. List of Subcontractors In accordance with the California Subcontractor Listing Law, a list of all subcontractors is required to be submitted with the bid on the form titled List of Subcontractors provided by OIAA. The list of subcontractors who are assigned a portion of the work in an amount in excess of one-half of one percent of the prime’s bid shall comply with the requirements of California Public Contract Code (PCC) § 4100 – 4113 (the Subletting and Subcontracting Fair Practices Act). Minimum Qualifications (Prime Bidder’s Experience) Minimum Qualifications and Licensing Requirements: 1. Campus-Wide Fire Alarm Replacement Experience The Prime Bidder/Proposer shall have successfully completed a minimum of three (3) campus-wide fire alarm replacement projects within the past ten (10) years. Each project shall have included the replacement, modification, or upgrade of fire alarm systems across multiple buildings or facilities and shall have been completed within the past ten (10) years. The Prime Bidder/Proposer shall submit documentation demonstrating compliance with these minimum experience requirements with its Bid/Proposal. The documentation shall identify, at a minimum, the project name and location, owner, contract amount, scope of work, completion date, and the Prime Bidder/Proposer's role in the project. 2. Joint Venture Qualifications If the Bidder/Proposer is a Joint Venture, the Joint Venture entity shall demonstrate compliance with the Minimum Qualifications stated herein and shall submit the required project experience documentation. Alternatively, a Joint Venture may satisfy the experience requirement if each individual Joint Venture member submits its qualifying project experience, and at least one (1) Joint Venture member independently meets all applicable Minimum Qualifications. Experience obtained solely as a subcontractor shall not be used to satisfy the Prime Bidder/Proposer experience requirement unless specifically approved by the Airport in the solicitation documents. 3. Contractor Licensing The Prime Bidder/Proposer shall hold and maintain valid and active California contractor licenses in the classifications applicable to the Work, including: Class A – General Engineering Contractor Class B – General Building Contractor C-10 – Electrical Contractor C-16 – Fire Protection Contractor The Prime Bidder/Proposer shall self-perform a minimum of thirty-five percent (35%) of the total Project Work. All subcontractors shall possess the appropriate and valid California contractor license classification(s) required for the work they perform. Failure to satisfy the Minimum Qualifications or to possess the required California contractor license(s) shall result in the Bid/Proposal being deemed non-responsive and subject to rejection, in accordance with applicable California law, including California Business and Professions Code Section 7028.15(e). Format Signing of Bid By signing the bid, the bidder is stating: 1) the facts represented in the bid are true and correct, 2) the bidder provided accurate contact information including telephone number(s) and e-mail address, and 3) the signer has authority to sign on behalf of the contracting entity. Only One Bid Accepted The OIAA will accept only one bid for this NIB from any one bidder. This includes bids submitted under different names by one firm, corporation, partnership, or joint venture. Evidence of collusion among bidders shall be grounds for exclusion of any bidder who is a participant in any such collusion. Joint Ventures or Partnerships If the bidder is a partnership or joint venture, the bidder must submit, with its bid, a copy of the partnership or joint venture agreement. That agreement must describe the scope and amount of work each participant will perform and contain a provision that each participant will be jointly and severally liable to OIAA for completing all of the work and to third parties for all duties, obligations and liabilities which arise out of the joint venture’s performance of the work. Each member of the joint venture or partnership must respond to all elements of the Administrative Requirements separately, and a copy of each joint venture or partnership agreement must be included with the Administrative Requirements Forms. Cost of Bids OIAA is not responsible for any costs incurred by bidders while preparing or submitting bids. All bidders who respond to solicitations do so solely at their own expense. Withdrawal of Bids At any time prior to the Bid Opening Deadline, a bidder may withdraw, revise, modify, or change their bid. The bid will be returned un-opened. A bidder may not withdraw its bid submittals for one hundred and eighty (180) days from the date bids are due, or until after a contract for the work described in these bid documents is fully executed by OIAA, whichever date is earlier. Administrative Requirements Bidders/Proposers must complete and submit the following signed documents with their proposal/bid. The following items are required to be submitted with all proposals/bids: Small Business Certifications (or “N/A” if not applicable) Small Business & Subcontractor Letter of Intent (LOI) List of Subconsultants (Bidder's List Collection Form) Affidavit of Non-Collusion -This form must be notarized prior to submission. Failure to provide a notarized version may result in disqualification. Conflict of Interest Disclosure Form Confidentiality and Non-Disclosure Form Supplier Information Form W-9 Form Prime Bidder Experience Form NOTE: Failure to submit the required forms or failure to include the acknowledgments as instructed in the forms may render the bid/proposal non-responsive and may result in its rejection. Bid Evaluation and Awarding Information Requested and Not Furnished The information requested and the manner of submission is essential to permit prompt evaluation of all bids. Accordingly, OIAA reserves the right to declare as non-responsive and reject any bids in which information is requested and is not furnished or when a direct or complete answer is not provided. Right to Verify Information OIAA reserves the right to verify all submitted information, including contacting the referenced clients. All information stated in the bid shall be factual, truthful and shall not be misrepresented in any manner. Any information stated in the bid found to be a misrepresentation of past experiences shall be considered as grounds for disqualification of the bid. Evaluation of Bids and Bid Errors The bidder is liable for all errors or omissions committed by bidder in preparing the bid and for any consequences due to the errors or omissions. Bidders will not be allowed to alter, correct, or amend bid documents after the due date and time of submission. Mathematical Corrections on Bids In the case that the amount listed in the Total Price is not the correct sum of the Unit Price multiplied by the Quantity, the Unit Price amount shall govern and the Total Price will be corrected. An exception to this is if, in the view of the OIAA, the Total Price is clearly and obviously correct, the Unit Price is clearly and obviously incorrect, and the intent of the bidder is clear and obvious, then the Unit Price will be corrected and the Total Price unaltered. In either case, the Project Total amount will be adjusted accordingly. If the Project Total amount listed is not the correct sum of the Total Price, the Total Price shall govern, and the Project Total will be corrected accordingly. In the case that the amount listed in the Unit Price of a Bid Alternate identified as “Must Match Base Bid Unit Price” does not match the Unit Price of the Base Bid, the Base Bid Unit Price amount shall govern, and the Total Price will be corrected along with the Project Total amount accordingly. Incorrect Bid Information If OIAA determines that a bidder has provided incorrect information for consideration in the evaluation process, which the bidder knew or should have known was materially incorrect, that bidder may be deemed non-responsive and the bid may be rejected. Prohibition of Alt Source: OpenGov https://procurement.opengov.com/portal/flyontario/projects/304663 Canonical URL: https://govcontractfinder.com/contracts/2027ps001-campus-wide-fire-alarm-system-replacement-opengov-4271-project-304663