6-Inch Water Main Isolation and Repair – 65 Ruggles Street State and local opportunity awardPending Town of Florence 27-018RFQ Posted: 2026-11-03T16:18:33.678Z Response deadline: 2026-11-11T19:00:00.000Z The Town of Florence is requesting quotes for the isolation and repair of a compromised section of the existing 6-inch water main located in front of 65 Ruggles Street. Cost Shipping Taxes Scope of Work Description of Services The Town of Florence is requesting quotes for the isolation and repair of a compromised section of the existing 6-inch water main located in front of 65 Ruggles Street. The contractor shall furnish and install two (2) 6-inch Insta-Valves on the existing live water main to isolate the compromised section. Work shall include saw cutting and excavation at two locations to accommodate installation of the Insta-Valves, as well as additional saw cutting and excavation necessary to access and remove the compromised section of water main. The contractor shall remove approximately 18 to 19 linear feet of the existing compromised 6-inch water main and replace it with new 6-inch C900 PVC pipe. The contractor shall furnish and install all necessary fittings, connections, restraints, adapters, and appurtenances required to complete the installation. The contractor shall be responsible for backfilling and compacting all excavations with ABC aggregate to the existing pavement subgrade, leaving the surface level and ready for asphalt restoration. The Town of Florence will provide all traffic control and perform the final asphalt pavement restoration. The contractor shall coordinate all work with the Town of Florence to minimize service disruptions. Coordination with Town personnel is required for water main isolation, shutdowns, valve operation, and restoration of water service. The contractor shall not proceed with cutting into or removing the existing water main until the Town has confirmed that the compromised section has been properly isolated. All work shall be completed in accordance with applicable Town of Florence requirements, construction standards, and water utility specifications. Introduction Summary Background Contact Information Timeline Instructions Bid Bond Bid Bond Requirement – If you are using any sub-contractors, or using non-owned inventory/materials, a Bid Bond is REQUIRED. Notification This is an informal “Request for Quote”. Only the successful vendor will be notified of the Town of Florence’s intent to enter into a contract for the goods or services quoted. Right to Reject The Town of Florence reserves the right to reject any or all responses, or to accept any response, or to waive any informality in any response, or to withhold the award if deemed in the best interest of the Town of Florence. Vendor Questionnaire Pricing Proposal Attachments Source: OpenGov https://procurement.opengov.com/portal/florenceaz/projects/322743 Canonical URL: https://govcontractfinder.com/contracts/6-inch-water-main-isolation-and-repair-65-ruggles-street-opengov-5202-project-322743