Advanced Metering Infrastructure (AMI) System and Installation Services State and local opportunity open City of Pasadena 2026-RFP-0143 Posted: 2026-10-13T15:00:02.075Z Response deadline: 2026-12-11T22:00:00.000Z The City of Pasadena (“City”) is seeking proposals from qualified firms to provide a comprehensive Advanced Metering Infrastructure (“AMI”) solution, together with associated installation services, for the City’s water and electric utilities. The objective of this RFP is to select a vendor capable of providing a vendor-hosted AMI headend system with a supporting communications network, as well as electric meters, water meters, water endpoints, and related components as required. The selected vendor will also perform field deployment, integration with the City’s Oracle C2M and Oracle Meter Data Management environment, testing, commissioning, training, and go-live support needed for full AMI operations. The selected vendor will play a critical role in meeting performance, reliability, security, and interoperability requirements while advancing operational efficiency and customer service. Scope of Work Scope of Work Introduction Pasadena Water and Power requests proposals from qualified Proposers to provide equipment, software, and/or services (both construction and professional) for the utility’s comprehensive Advanced Metering Infrastructure (AMI) Project. The required scope of this project is summarized below, consisting of several parts (each individually referred to as a Component). Component Number Component Name Description 1 AMI Field Area Network (FAN) Equipment, software, and services capable of delivering billing and interval reads from customer meters, including network infrastructure and its installation; electric meters; water endpoints; a headend system (or multiple headend systems, if separate for electric and water) necessary to attain functionality and monitor network health; and integration services to tie the AMI headend to other business-critical systems 2 Installation Services Installation for AMI meters/endpoints and other ancillary materials related to the Project 3 Water Metering Water meters and retrofit registers A complete Proposal should include all Project Components. Proposers are permitted to submit a joint Proposal with multiple firms to provide a Proposal that best meets the stated needs. Submission of a Proposal for all Components does not guarantee that PWP will award all Components to that Proposer. PWP is under no obligation to select a single, end-to-end solution and may instead pursue a “best-of-breed” approach across Components and utility services. PWP reserves the right, at its sole discretion, to evaluate, select, and award Components independently or in combination, in a manner that best serves PWP’s operational, technical, and financial objectives. PWP expressly reserves the right to: Award one or more Components to a single Proposer; Award different Components to different Proposers; Select multiple solutions for the same Component across different utility services (e.g., electric and water); Decline to award any Component in whole or in part. Selection decisions will be based on PWP’s evaluation of overall value, including but not limited to technical merit, interoperability, lifecycle cost, implementation risk, and alignment with PWP’s long-term strategic goals. PWP reserves the right to structure resulting agreements in a manner that reflects its selected approach, including but not limited to: Executing separate contracts with different Proposers for discrete Components or utility services; Requiring selected Proposers to enter into a joint or coordinated contractual arrangement to deliver an integrated solution; Designating one Proposer as a Prime Contractor responsible for overall system integration, with others serving as Subcontractors; Establishing parallel contracts with defined interface and coordination requirements between vendors. PWP further reserves the right to condition award upon Proposers’ agreement to collaborate, integrate, or otherwise modify their proposed delivery approach to align with PWP’s selected configuration. As part of this initiative, PWP plans to replace approximately 68,000 electric meters and to replace or retrofit approximately 38,000 water meters within an 18-month timeframe. To meet this schedule, PWP plans to utilize a combination of internal staff and by a Meter Installation Vendor (MIV). PWP has approximately 5,000 three-phase electric meters primarily serving commercial customers. As part of the AMI project, these meters will be replaced by PWP Power Delivery staff represented by the International Brotherhood of Electrical Workers (IBEW). The MIV will complete the installation of the remaining 63,000 single-phase meters. PWP has approximately 200 large water meters greater than 3 inches in size belonging to key accounts. These key accounts are typically large, commercial customers with higher water usage and more complex service requirements. As part of the AMI project, these meters will be replaced by PWP staff. The MIV will complete the replacement and retrofit of approximately 38,000 water meters, including non-key commercial accounts and all small meter accounts. Of this total, approximately 26,700 will be full meter installations and approximately 11,200 will be retrofits. PWP expressly reserves the right, in its sole discretion, to adjust, reduce, or remove the commercial electric and/or water meter AMI conversion scope, in whole or in part, including assigning such work to PWP personnel. No minimum quantity of commercial meter AMI conversion work is guaranteed to the MIV. Any such adjustment or de-scoping shall not serve as a basis for modification of the MIV’s proposed pricing for Installation Services or any other component of the work. Please note that proper and current contractor licensing is required for any firm directly providing services under Component 2. This requirement may be met by C-10 Electrical and C-36 Plumbing licensing, or by Class A General Engineering licensing. Additionally, please note that the water portion of this project is funded in part through WIFIA funds and grant funds that are subject to Build America, Buy America Act requirements. PWP is currently evaluating waiver applicability but cannot make guarantees at this time. As such, PWP is requesting Component 2 pricing for "standard" materials, as well as options for BABA-compliant materials, if available. Additional terms related to WIFIA are given as an attachment that requires mandatory compliance, and more detail can be found at: https://www.epa.gov/wifia/wifia-federal-requirements . Vendors are responsible for upholding these requirements and meeting compliance. Metering Summary Electric Meter Form Estimated Replacements 1S 1,076 2S 54,021 3S 271 45S 277 4S - 9S 1,373 12S 9,082 16S 2,991 Water Meter Size Estimated Replacements Estimated Retrofits 3/4" 15,746 5,539 1” 7,619 4,450 1.5” 1,632 580 2” 1,353 460 3” 237 118 4” 178 115 6” Environment Information Technology PWP is pursuing a cloud-first IT strategy. As a result, any systems to be procured as part of this solution should be vendor-hosted. A high-level dataflow and integrations systems context diagram is provided in Exhibit T, denoting current systems anticipated integrations to be performed within the scope of the Project. PWP currently utilizes an Oracle C2M system for billing; additionally, PWP has implemented the Oracle Meter Data Management module. As a result, a separate meter data management system is not within scope for this project; however, any AMI system to be provided will be required to deliver reads to the MDM in a timely fashion. Similarly, PWP’s customer engagement is handled through the VertexOne MyMeter/WaterSmart suite, and a separate customer portal is also not within scope for this project. Network Communications A map of the service territory and a list of potential assets for locating network infrastructure are given in Exhibit Y. While proposers are encouraged to propose any network design that is determined to be most cost-efficient and operationally robust, PWP highly prefers that any fixed-based network utilizes this existing infrastructure to the extent possible. Third-party tower leasing is not preferred for network infrastructure, but, if required, all costs associated with this leasing should be included within the proposal. Where fiber is unable to be used, PWP is open to the use of cellular backhaul; FirstNet is the current provider to PWP’s water SCADA system, but other commercial carriers may be used. Costs for backhaul should also be included within the proposal. Field Conditions PWP maintains a system of approximately 68,000 electric meters and 37,000 water meters. A list of meters, their characteristics, and their collection method can be found in Exhibits U and V. PWP reads meters using a variety of methods, including: Itron FCS for AMR/drive-by; MV90 for commercial interval reads; and a mix of manual, AMR, and probe-based reads. One impetus for this AMI project is an excessive number of module failures that have occurred in the AMR system since 2018. Currently, about 6,000 meters are being read manually, and there are routes that contain manual and AMR meters, causing inefficient sequencing and billing. As a result, PWP hopes to unify its system under a single AMI network and headend system. In general, commercial accounts are billed monthly, and residential accounts are billed bi-monthly (except for some special customers and instances where residential accounts are included in a commercial route or require demand reset). Meters are read on 57 bill cycles; of these, 22 are monthly, 32 are bi-monthly, and 3 are “special.” It is not anticipated that PWP will change bill cycles or billing frequency during this project but may do so after deployment. The service territory is approximately 22.5 square miles. Water and electric service territories largely intersect; however, approximately 5,500 water meters and 150 electric meters are located outside of the city limits. A map is given in Exhibit Y. There is no expectation for substantial growth outside the periphery of the service territory that would impact this project. PWP anticipates being able to provide warehousing space for staging the project, with the following characteristics: Gated security Approximately 10,000 sq. ft. Staff to take deliveries of product Operating between 6:30 AM and 4:00 PM Monday through Thursday, and on Friday through 3:00 PM Parking space Office space, bathrooms, and utilities Secured bin area for the disposal of removed meters Should a meter installation vendor have needs different from what is defined, PWP will work with the meter installation vendor to determine an adequate solution, or a proposer may opt to quote additional costs for warehousing. Currently, PWP is contemplating using either a meter installation vendor-provided work order management system to facilitate deployment or to give the vendor access to the Oracle Field Service (OFS) tool that is currently in use. The feasibility of these options will be explored in evaluation, with preference for use of the OFS system. Though PWP usually has a testing and acceptance process in place for new meters received, the scale and timeline of this project is such that the meter installation vendor may be asked to quote and perform such testing (either with onsite testing apparatus or sent offsite to a third party depending on cost-effectiveness). For removed meters, PWP will be foregoing any testing or holding requirements. PWP is currently considering an opt-out program for those customers who are hesitant about the migration to new metering technology, with a fee assessed to those customers based on cost of service; however, these details have not been fully defined. Regardless, the customer base is such that it is not anticipated to have any material impact on the project or the services being requested under this RFP. In addition to these conditions, Proposers should be aware of, and assume for the sake of proposal development, the following circumstances appertaining to the utility’s meter and field conditions: Water Current meters are read and billed in 100 cubic feet. Currently meters makeup is largely composed of Zenner meters for small sizes and Neptune meters for large sizes; however, for new meters, PWP is open to all meter manufacturers. Current ERTs utilize an Itron connectors, which should be assumed for any retrofits; however, PWP does not have a connector preference for new meters. Consumables, such as washers, gaskets, or gel caps will be provided by the selected vendor. Replacement lids will be provided by the selected vendor. PWP will accept bids on both mechanical and electronic meters, but there is high preference for brass bodies and threading. Pricing for all metering options is requested, if available by the manufacturer. Adjustments in lay length Future State As part of this project, PWP conducted an assessment of its current metering program to identify its desired future state. This future state is summarized in 21 objectives, detailed in the proceeding table. ID Gap Category Current State Desired Future State 1 Inconsistent meter read and billing cycles across customer classes Process Residential accounts billed bi-monthly (mostly), commercial billed monthly, and select accounts on irregular cycles Standardized, operations-driven billing cycles for each customer class 2 Service territory overlap and multi-jurisdictional coordination Process Water and electric territories partially overlap; ~5,500 of 31,000 water customers outside city limits; limited alignment on infrastructure ownership and jurisdictional coordination Fully mapped and reconciled service boundaries; agreements in place to guide AMI network design and pole access 3 Mixed meter reading technologies Technology Itron FCS for AMR/drive-by; MV90 for commercial interval reads; mix of manual, AMR, and probe-based reads Unified AMI network supporting both electric and water, with automated daily register and interval reads 4 Large number of failed or inoperative AMR modules Technology 5,200+ failed since 2018; ~7,000 meters read manually AMI meters with reliable communication modules and proactive health monitoring 5 Mixed routes with manual and AMR reads Technology Routes contain both manual and AMR meters; inefficient sequencing All meters converted to AMI 6 Dependence on legacy MV90 system for commercial interval data Technology MV90 requires separate system maintenance and some data prep each billing cycle Modern, integrated HES with direct integration to MDMS (C2M) 7 Construction meter billing Technology Temporary construction and portable meters are often billed at end of project or upon return; limited interim usage visibility AMI-equipped construction meters transmit usage continuously; billing integrated with CIS to allow periodic invoicing during use 8 Lack of formalized data governance framework Process Informal practices exist; no formal governance or cross-functional ownership Formal data governance structure with defined roles, standards, and stewardship 9 No water meter test bench or calibration infrastructure Technology No water meter test bench; water meters replaced only when failing or over 10 years old Water meter and endpoint functionality is tested and validated end-to-end 10 Manual re-read and verification workflow Process Billing exceptions trigger manual re-reads; photos taken for validation Automated exception management and remote read verification 11 Manual dispatch and routing for field activities Process Move in/out, disconnects, and re-reads assigned manually by leads Automated scheduling and routing based on AMI data and workforce management tools 12 Disconnect and MIMO truck rolls Process Disconnects performed manually by field technicians; coordination across departments inconsistent AMI remote disconnect/reconnect capabilities implemented for at least applicable electric meters; automated verification workflows established 13 Limited visibility into meter locations and GIS alignment Technology GPS coordinates not precise; property line-based; misalignment between city and utility GIS Accurate GIS-integrated meter locations synced with asset and billing systems 14 Workload and efficiency People Billing team of 11 (2 vacancies); 12 call center staff (2 vacancies); high manual workload and process dependencies Staffing optimized through process automation, workflow integration, and AMI data availability; reduced reliance on manual intervention 15 Public concern over smart meter privacy and safety People Customer concerns about radiation, fires, and data privacy; existing opt-outs from AMR Clear AMI communication strategy and opt-out framework 16 Data not fully leveraged for water conservation or analytics Technology Tracking participation and estimated savings only; no validation against actuals Use AMI data for actualized water savings measurement and reporting 17 No digital water distribution system monitoring Technology Manual troubleshooting via gauges and field inspection Real-time system visibility via AMI, pressure sensors, and SCADA augmentation 18 Limited meter replacement rate Technology ~1,200 water meters replaced every year; ~550 electric meters replaced every year Structured meter lifecycle plan aligned with AMI deployment 19 Limited analytics on customer classes and consumption patterns Technology Tracking retail/wholesale revenue by class; limited consumption insight AMI-enabled analytics with segmentation and consumption profiling 20 Meter access and safety constraints Process Some meters behind locked gates, near dogs, or blocked by vehicles; historic electric meters indoors or in basements; access requires coordination and manual effort AMI-enabled remote reads eliminate need for routine access; access issues mapped in GIS and prioritized for relocation during meter changeouts 21 Bill estimation process Technology Estimated bills automatically generated in CIS when reads fail; limited validation or feedback loop from field or data analytics. Fully automated, rules-based validation, editing and estimation (VEE) routines 22 Lack of data on individuals Technology A load-logger has to be connected to a service and left on for multiple weeks to collect an individual's data. Analytics on individual customers 23 Inefficient methods for predicting outages Technology Outages are predicted when customers call in to report them. AMI interfaces with Milsoft DisSPatch and WindMil to automatically predict outages 24 Lacking Data Collection for Power Technology Power Delivery does not have access to real-time consumer data at each meter Meters should collect Watts, VARs, and Voltage in no less than 15 minutes intervals Project Approach The overall implementation period is expected to span 24 months following Project approval and formal Notice to Proceed. The project will be implemented in three phases: Planning (3 Months) Initial Deployment Area (IDA) (9 Months) Full Deployment (12 Months) This timing is tentative and subject to change. A final schedule will be developed between the selected Proposer(s) and Pasadena Water and Power, detailing sequencing, dependencies, and integration timelines across all participating systems. Successful completion of each phase will occur upon confirmation of meeting the criteria outlined for each. Proceeding to a subsequent phase will not be authorized until Pasadena Water and Power fully accepts the previous phase’s work, or Pasadena Water and Power unless otherwise authorizes in writing that work may proceed with a subsequent phase prior to acceptance of the previous project phase. Criteria are outlined through a linear responsibility chart for each phase. Responsibilities are outlined in the following table: Responsibility Description R (Responsible) Designates the entity is responsible for t Source: OpenGov https://procurement.opengov.com/portal/pasadena/projects/237617 Canonical URL: https://govcontractfinder.com/contracts/advanced-metering-infrastructure-ami-system-and-installation-opengov-530-project-237617