Annual Return Line Cleaning (Three (3) Year Multiyear Contract) State and local opportunity open County of DeKalb, GA 2026-091-ITB Posted: 2026-10-05T11:32:51.592Z Response deadline: 2026-11-30T20:00:00.000Z The County of DeKalb, GA (the "County"), is soliciting sealed Bids for Annual Return Line Cleaning (Three (3) Year Multiyear Contract) . Bids are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/dekalbcountyga PRIOR TO 3:00 pm on Monday, November 30, 2026 . Late Bids will not be accepted. The scope of services shall cover the minimum requirements for routine inspection, maintenance, testing, evaluation, and recommendations for repair and/or replacement of various components associated with all small engine and other equipment. Sanitary Sewer Return Line Cleaning Measurement and payment for sanitary sewer return line cleaning shall be on a linear-foot basis. Payment shall be made under the applicable sanitary sewer cleaning bid item based on pipe diameter. 16-Inch Sewer within the Right-of-Way/Highway/Utility Easement 24-Inch Sewer within the Right-of-Way/Highway/Utility Easement 32-Inch Sewer within the Right-of-Way/Highway/Utility Easement Manhole Cleaning Measurement and payment for sanitary manhole cleaning shall be on a per-manhole basis and shall be based on manhole depth. Manhole Cleaning, 6-15 feet deep Manhole Cleaning Greater Than 15 feet deep MINIMUM SPECIFICATIONS Technical Specifications The Contractor shall furnish all labor, equipment, materials, tools, and incidentals necessary to thoroughly clean the designated sewer lines and associated manholes prior to the commencement of internal inspection activities. The Contractor shall also provide standby equipment to ensure uninterrupted operations in the event of equipment failure. For the purposes of this specification, “clean” shall mean the complete removal of all trash, garbage, dirt, gravel, rocks, roots, grease, lime scale, settled sludge, and other solid or semi-solid materials from the sewer lines and manholes. Cleaning is required to maintain consistent return flow through the wastewater treatment plant by preventing the accumulation of materials that can combine and harden, creating obstructions that restrict flow and block the plant’s screening system. If left unaddressed, these blockages can reduce hydraulic capacity, impede the passage of wastewater through the screens, and increase the risk of sanitary sewer overflows and spill events. The Contractor shall perform all work in accordance with current industry standards and shall ensure that all personnel performing applicable work hold current National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) certifications. Documentation verifying these certifications shall be provided upon request. Equipment Specifications 1. Hydraulic Cleaning Equipment The Contractor shall: Provide and operate hydraulic cleaning equipment suitable for the size, configuration, and condition of the sewer lines and manholes being cleaned. The equipment shall be of the movable-dam type and shall be designed and constructed to allow the dam, or a portion thereof, to be lowered or collapsed at any time during the cleaning operation to regulate wastewater flow and maintain effective cleaning operations. The equipment shall be capable of being adjusted as necessary to accommodate variations in flow conditions and shall permit the contractor to safely control the wastewater level within the sewer during cleaning. Operate the equipment in a manner that prevents excessive upstream surcharge, minimizes the risk of sanitary sewer overflows, and does not damage the sewer system or associated facilities. All hydraulic cleaning equipment shall be maintained in good operating condition and shall be operated by properly trained personnel. Provide all equipment, accessories, and appurtenances necessary to perform the work safely, effectively, and in accordance with the requirements of these Specifications. 2. High Velocity Hydro-Cleaning Equipment All high-velocity sewer cleaning equipment shall be designed and constructed to facilitate safe, efficient, and reliable operation. The equipment shall be equipped with a selection of at least two (2) high-velocity nozzles. The nozzles shall be capable of producing a scouring action at angles ranging from fifteen (15) degrees to forty-five (45) degrees in all pipe sizes designated for cleaning. The equipment shall also be equipped with a high-velocity gun capable of producing flows ranging from a fine spray to a long-distance, solid stream. Each unit shall be self-contained and shall include its own water tank, auxiliary engine(s), pump, and hydraulically driven hose reel. All operating controls shall be conveniently located to allow the equipment to be operated safely from above ground. 3. Mechanical Cleaning Equipment Bucket machines shall have sufficient power and capacity to perform the required cleaning work efficiently and effectively. Machines shall be belt-driven or equipped with an overload protection device. Direct-drive machines that may cause damage to the sewer pipe or other system components shall not be permitted. Power rodding machines shall be either sectional-rod or continuous-rod type and shall have the capacity to accommodate a minimum of seven hundred fifty (750) feet of rod. For safe operation, each machine shall have a fully enclosed body and shall be equipped with an automatic safety throw-out clutch or an appropriate relief valve to protect the equipment and personnel from excessive loads. Service Specifications 1. Sewer Line Cleaning Requirements Sewer Line Cleaning Standards The Contractor shall examine the sewer lines designated for cleaning and shall determine the extent of cleaning required, including the anticipated difficulties and conditions that may be encountered during the cleaning operations. The Contractor shall also determine the level of cleaning required for each segment of the Work based on the observed condition of the sewer. The proposed level of cleaning for each sewer segment shall be submitted to and approved by the County Project Manager prior to commencing cleaning operations. Approval by the County Project Manager shall not relieve the contractor of responsibility for properly cleaning the sewer line in accordance with the Contract Documents. Following initial cleaning, the sewer line shall be internally inspected to verify that the required level of cleaning has been achieved. If the inspection indicates that the sewer is not adequately clean, the Contractor shall repeat the cleaning operation(s), using the appropriate cleaning methods and equipment, until the sewer is satisfactorily clean as determined by the County Project Manager. All additional cleaning required to achieve the specified level of cleanliness shall be performed at the sole expense of the contractor. The Contractor shall furnish, operate, and/or manage all labor, equipment, and materials necessary to properly clean and remove obstructions and accumulated material from the sewer lines. Cleaning methods and equipment may include, but are not limited to, high-velocity water jetting, rodding, bucketing, brushing, root cutting, vacuum extraction, or other approved removal and extraction methods necessary to remove and extract silt, sediment, grease, debris, roots, and other obstructions. The County is subject to a Consent Decree with the U.S. Environmental Protection Agency (EPA) and the Georgia Environmental Protection Division (EPD). The Contractor shall be aware of and comply with all applicable requirements of the Consent Decree, as well as applicable laws, regulations, and industry best management practices related to sewer cleaning activities. Prior to issuance of the Notice to Proceed, the Contractor shall acknowledge its understanding of and commitment to comply with these requirements by executing the acknowledgment letter provided by the County. Return Line and Removable Dam Cleaning Standards The removable dam used during sewer cleaning shall be equal in diameter to the inside diameter of the sewer pipe being cleaned and shall be equipped with a flexible scraper around its outer periphery to facilitate the complete removal of grease and other deposits from the pipe walls. If sewer cleaning balls, plugs, or other equipment that cannot be collapsed, deflated, or otherwise removed immediately are used, the Contractor shall implement appropriate precautions and maintain adequate control measures to prevent surcharge conditions, flooding, or the uncontrolled release of wastewater that could adversely affect the sewer system or public or private property. The Contractor shall clean the plant return lines using high-pressure water jetting and vacuum extraction. The return lines are subject to restrictions caused by lime-scale buildup. The Contractor shall use high-pressure cleaning, vacuum extraction, and other approved cleaning methods as necessary to remove accumulated lime scale, sediment, grease, debris, and other obstructions and restore the return lines to a clean and unobstructed condition. Cleaning operations shall continue until the return lines are free of visible lime scale, sediment, grease, debris, and other obstructions that could restrict flow or interfere with the proper operation of the system. Following cleaning, the County Project Manager may require an internal inspection or other verification to confirm that the required level of cleaning has been achieved. If the inspection or verification indicates that additional cleaning is necessary, the Contractor shall repeat the cleaning operations at no additional cost to the County until the lines are satisfactorily clean, as determined by the County Project Manager. There are eight (8) sections of plant return line located on the site. Pipe diameters are 16 inches, 24 inches, and 32 inches. A total of fifteen (15) manholes shall be cleaned in conjunction with the return line cleaning operations. Manhole depths range from approximately 12 feet to 25 feet. The total estimated length of plant return line to be cleaned is 1,371 linear feet (LF). Section 1: 32-inch diameter pipe – 75 linear feet Section 2: 32-inch diameter pipe – 86 linear feet Section 3: 32-inch diameter pipe – 497 linear feet Section 4: 16-inch diameter pipe – 94 linear feet Section 5: 32-inch diameter pipe – 145 linear feet Section 6: 32-inch diameter pipe – 145 linear feet Section 7: 24-inch diameter pipe – 254 linear feet Section 8: 32-inch diameter pipe – 75 linear feet Total Plant Return Line Cleaning: 1,371 LF 2. Sewer Cleaning and Maintenance Requirements Sanitary Sewer Cleaning Requirements Sanitary sewer cleaning shall include the removal of grease, tree roots, tuberculation, debris, and other obstructions from sewer pipes as necessary to restore and maintain the required flow capacity. As part of the cleaning operation, the Contractor shall clean and remove debris and grease from manhole walls using high-velocity water guns or other appropriate equipment. No additional payment will be made for this work. Root intrusion shall be removed where present and where necessary to restore the flow capacity of the sewer. Cleaning methods may include mechanical equipment, such as rodding machines, expanding root cutters, and porcupine-type cleaning tools, as well as hydraulic equipment, such as high-pressure water jet cleaners. The Contractor shall select the appropriate cleaning method based on the condition, size, and configur CONTRACTOR RESPONSIBILITIES 1. Personnel and Operation Requirements a. Field Supervision The Contractor shall maintain a competent field supervisor at the work site at all times while work is being performed. The field supervisor shall be responsible for supervising the survey, inspection, cleaning, and maintenance activities performed under this Contract. The field supervisor shall be approved in writing by the County Project Manager prior to commencement of the work. Any proposed change in field supervisor shall be submitted to and approved in writing by the County Project Manager prior to the change. The field supervisor shall be responsible for the safety of all personnel and site conditions and for ensuring that all work is performed in accordance with the requirements of these Specifications and the quality standards established by the County. b. Operational Procedures Prior to entering private property, the Contractor shall identify and comply with all applicable permits, easements, access agreements, and other requirements governing entry onto the property. The Contractor shall provide all required notices and obtain all necessary permissions prior to entering private property or existing easements. The Contractor shall be solely responsible for complying with all requirements associated with such permits, easements, and access rights, including requirements that may be more stringent than those specified in the Contract. The Contractor shall be responsible for any costs, losses, damages, or expenses incurred by the County as a result of the contractor's failure to comply with such requirements. The Contractor shall obtain, at its own expense, any additional land, access, staging areas, or temporary facilities that it requires for the performance of the work, including areas for temporary construction facilities, material storage, equipment storage, or access to sewer line segments. No additional measurement or payment will be made for access, staging, or temporary facilities obtained by the Contractor. 2. Hazard Reporting and Site Protection a. Collapsed Sewers/Defective Manholes Any sewer exhibiting greater than ten percent (10%) deformation, including a collapsed or near-collapse condition, shall be reported immediately to the County Project Manager for evaluation and appropriate action by the County. Any manhole found to be broken, cracked, missing a cover, surcharged, or otherwise presenting an unsafe condition shall be reported immediately to the County Project Manager for evaluation and appropriate action by the County. When existing sewer conditions pose an immediate threat of personal injury to the public, such as a collapsed sewer accompanied by a depression in a roadway or other hazardous condition, the contractor shall immediately protect the area and implement appropriate safety measures until the County Project Manager arrives at the site. Upon arrival, the County Project Manager shall determine the appropriate course of action and whether the Contractor or County will be responsible for supervising the corrective work. If the condition is determined to be a County responsibility and no further work by the contractor is required, the contractor may leave the site upon authorization by the County Project Manager. When existing manhole conditions pose an immediate threat of personal injury to the public, including broken, cracked, or missing covers or covers located in traveled portions of sidewalks or roadways, the Contractor shall immediately protect the area and implement appropriate safety measures until the County Project Manager arrives at the site. Upon arrival, the County Project Manager shall determine the appropriate course of action and whether the Contractor or County will be responsible for supervising the corrective work. If the condition is determined to be a County responsibility and no further work by the Contractor is required, the contractor may leave the site upon authorization by the County Project Manager. b. Flow Management Plugging of sewer lines shall require prior approval of the contractor's proposed plugging plan by the County before the Work begins at each location requiring such measures. Sewer plugs shall be properly secured with suitable rope, cable, or other approved means and shall be completely removed at the conclusion of the Work. The Contractor shall continuously monitor flow conditions and all plugging to prevent sanitary sewer overflows, spills, backups, or other adverse impacts to the wastewater collection system or connected properties. The Contractor shall be responsible for all cleanup, restoration, and damages resulting from line plugging activities performed by the Contractor. c. Traffic Control The Contractor shall schedule and perform the Work in a manner that minimizes interference with vehicular and pedestrian traffic, adjacent streets, driveways, and property entrances. The Contractor shall not obstruct traffic on major streets or intersections between the hours of 6:00 a.m. and 9:00 a.m. or between 4:00 p.m. and 6:00 p.m., Monday through Friday, unless otherwise approved by the County. Major streets shall be defined as those identified in Chapter 17, Article XXI, Traffic Schedules, Section 17-351, Major Through Streets, of the current DeKalb County Code, as amended. The Contractor shall maintain the flow of traffic during all phases of the Work by maintaining at least one lane of traffic through the Work site whenever practicable. The Contractor shall furnish all flaggers, warning signs, barricades, lights, and other traffic control devices necessary to safely control traffic and protect the public, at no additional cost to the County. All costs associated with traffic control shall be included in the applicable bid item. Traffic control devices and procedures shall comply with the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) and all applicable County and Georgia Department of Transportation requirements. The Contrac INVITATION TO BID OVERVIEW PURPOSE The DeKalb County Department of Watershed Management (DWM) is soliciting bids from qualified contractors to provide sanitary sewer cleaning, manhole cleaning, debris removal, and other related maintenance services throughout the County's wastewater collection system. The scope of services shall include the cleaning and maintenance of sanitary sewer lines and manholes; the removal and disposal of debris; and flow control; traffic control; site restoration; reporting and documentation; and other related services necessary to ensure the safe, efficient, and reliable operation of the County’s wastewater infrastructure. Exhibit 1 provides a map of the County’s wastewater collection system and identifies the general areas where annual return line cleaning services may be performed under this solicitation. GENERAL INFORMATION Sealed bids are to be submitted via the County's eProcurement Portal at https://procurement.opengov.com/portal/dekalbcountyga not later than 3:00 pm on Monday, November 30, 2026 . ***PRICE SCHEDULE MUST BE SUBMITTED SEPARATELY OR BIDDER WILL BE DEEMED NON-RESPONSIVE AND WILL NOT BE CONSIDERED FOR AWARD*** Any pricing included in the bid package (original or copies) will cause the bidder to be deemed non-responsive. QUESTIONS/EXCEPTIONS: All requests must be in writing . Any explanation desired by a bidder regarding the meaning or interpretation of the Invitation to Bid, bidder instructions, general terms and conditions, insurance requirements, drawings, scope/specifications, etc., must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bids. If any statement in the bidding documents, specifications, plans, etc., appear ambiguous to the Bidder or if the Bidder would like to submit exceptions to general terms and conditions or insurance requirements for consideration, Bidder is specifically instructed to make a written request to the Department of Purchasing and Contracting as outlined in the preceding sentence. Any information given to a prospective bidder concerning an Invitation to Bid wil l be furnished to all prospective bidders, as an addenda to the Invitation, if such information is necessary to bidders in submitting bids on the Invitation or if the lack of such information would be prejudicial to uninformed bidders. Oral explanations or instructions given before the a Source: OpenGov https://procurement.opengov.com/portal/dekalbcountyga/projects/278451 Canonical URL: https://govcontractfinder.com/contracts/annual-return-line-cleaning-three-3-year-multiyear-contract-opengov-365404-project-278451