Atkinson Boulevard Sound Barrier Wall Repairs State and local opportunity pending City of Newport News 27-2225-3017 Posted: 2026-11-03T17:00:01.339Z Response deadline: 2026-11-17T20:00:00.000Z The City of Newport News (the “City” or "Owner") is seeking quotes from qualified firms (the “Bidder” or “Contractor”) to furnish the goods and/or services described herein and quotes will be received via the City’s e-Procurement Portal, OpenGov Procurement ( https://secure.procurenow.com/portal/nnva ), to be received no later than Tuesday, November 17, 2026 at 3:00 pm (local prevailing time). The purpose of this Request for Quotes (RFQ) is to establish a Contract with a qualified Contractor to provide all labor, materials, and equipment for the repair of damage done to the Atkinson Boulevard Sound Barrier Wall in accordance with the specifications and requirements of this RFQ. NOTE TO BIDDERS: BE SURE TO GIVE YOURSELF ADEQUATE TIME TO SUBMIT A BID. ANY TECHNICAL DIFFICULTIES OR UNCERTAINTY WITH THE SUBMITTAL PROCESS SHALL NOT BE CAUSE FOR ACCEPTING A BID THAT WAS NOT SUBMITTED ON TIME. The City of Newport News does not discriminate in the solicitation or awarding of contracts on the basis of race, religion, faith-based organizations, color, national origin, age, disability or any other basis prohibited by state or federal law. The Hampton Roads Planning District Commission’s Regional Construction Standards, Sixth Edition, June 2016, are hereby referenced and are part of the Bid Documents, except as may be modified by the Owner or by Special Provisions of this Project or as may be shown by bold type for additions and strike-through for deletions. Copies of the Regional Construction Standards may be purchased at the offices of the HRPDC, 723 Woodlake Drive, Chesapeake, VA 23320 (Telephone 757-420-8300) or Executive Tower, Suite 1-C, 2101 Executive Drive, Hampton, VA 23666 (Telephone 757-262-0094). The latest edition of the Regional Construction Standards and Publication Updates may be downloaded at the HRPDC website http://www.hrpdcva.gov/Regional Construction Stnds/REGCONST_Home.asp . The City’s Construction Standards, which are a modified version of the HRPDC Regional Construction Standards, Division 1, Sections 101 through 109 are provided in Section 7, Attachments. Bidders must be aware that these Bid Documents incorporate a number of changes, which supplement, modify, or replace language and/or Standard Details found in the HRPDC Regional Construction Standards. Details shown on the Drawings replace corresponding Standard Details found in the Regional Construction Standards. Changes from the Regional Construction Standards that appear in these Bid Documents may be shown as bold for additions, and strikethroughs for deletions. Also, see Section 110 for additional references to Special Technical Provisions incorporated into this Project. Mobilization/Demobilization Remove and Replace Sound Barrier Wall Panels Concrete Superstructure Surface Repair Traffic Control Specifications/Project Overview Specifications Specifications for this project can be viewed and downloaded in the Attachments section. Introduction Summary The City of Newport News (the “City” or "Owner") is seeking quotes from qualified firms (the “Bidder” or “Contractor”) to furnish the goods and/or services described herein and quotes will be received via the City’s e-Procurement Portal, OpenGov Procurement ( https://secure.procurenow.com/portal/nnva ), to be received no later than Tuesday, November 17, 2026 at 3:00 pm (local prevailing time). The purpose of this Request for Quotes (RFQ) is to establish a Contract with a qualified Contractor to provide all labor, materials, and equipment for the repair of damage done to the Atkinson Boulevard Sound Barrier Wall in accordance with the specifications and requirements of this RFQ. NOTE TO BIDDERS: BE SURE TO GIVE YOURSELF ADEQUATE TIME TO SUBMIT A BID. ANY TECHNICAL DIFFICULTIES OR UNCERTAINTY WITH THE SUBMITTAL PROCESS SHALL NOT BE CAUSE FOR ACCEPTING A BID THAT WAS NOT SUBMITTED ON TIME. The City of Newport News does not discriminate in the solicitation or awarding of contracts on the basis of race, religion, faith-based organizations, color, national origin, age, disability or any other basis prohibited by state or federal law. The Hampton Roads Planning District Commission’s Regional Construction Standards, Sixth Edition, June 2016, are hereby referenced and are part of the Bid Documents, except as may be modified by the Owner or by Special Provisions of this Project or as may be shown by bold type for additions and strike-through for deletions. Copies of the Regional Construction Standards may be purchased at the offices of the HRPDC, 723 Woodlake Drive, Chesapeake, VA 23320 (Telephone 757-420-8300) or Executive Tower, Suite 1-C, 2101 Executive Drive, Hampton, VA 23666 (Telephone 757-262-0094). The latest edition of the Regional Construction Standards and Publication Updates may be downloaded at the HRPDC website http://www.hrpdcva.gov/Regional Construction Stnds/REGCONST_Home.asp . The City’s Construction Standards, which are a modified version of the HRPDC Regional Construction Standards, Division 1, Sections 101 through 109 are provided in Section 7, Attachments. Bidders must be aware that these Bid Documents incorporate a number of changes, which supplement, modify, or replace language and/or Standard Details found in the HRPDC Regional Construction Standards. Details shown on the Drawings replace corresponding Standard Details found in the Regional Construction Standards. Changes from the Regional Construction Standards that appear in these Bid Documents may be shown as bold for additions, and strikethroughs for deletions. Also, see Section 110 for additional references to Special Technical Provisions incorporated into this Project. Timeline Release Project Date: November 3, 2026 Question Submission Deadline: November 10, 2026, 3:00pm Bid Submission Deadline: November 17, 2026, 3:00pm Contact Information Project Contact: Mike White Senior Contract Specialist 2400 Washington Ave Newport News , VA 23607 Email: whitemt1@nnva.gov Phone: (757) 926-8034 Secondary Contact: Japonica Wilkes Procurement Services Specialist 2400 Washington Avenue Newport News , VA 23607 Email: wilkesjd@nnva.gov Phone: (757) 926-8043 General Information Questions Questions regarding this Request for Quotes (RFQ) must be submitted in writing through the OpenGov Procurement Question/Answer Tab via the City's e-Procurement portal, on or before, Tuesday, November 10, 2026 by 3:00 pm . Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on the City's e-Procurement Portal received prior to the date and time as provided for in this solicitation. Direct contact with others besides the Office of Purchasing, including other City departments and the City consultants , on the subject of this bid is expressly forbidden except with the foreknowledge and permission of the contracting officer. Violation may result in a determination that your firm is ineligible for award. Pre-Bid Conference There is not a pre-bid conference scheduled for this project. Contractor Qualifications Firms shall have the capability in all respects to fully perform the services or provide the goods specified and have the experience necessary to assure good faith performance of the contract. The Contractor shall have three (3) years of relevant construction experience (concrete work, crane certification, traffic management) and at the time of bid, any site superintendent, shall possess five (5) years of experience in relevant construction similar to areas listed above. Contract/Agreement Following award, a contract will be executed between the Contractor and the City. A sample contract is included in this Request for Quotes. Do not return the sample contract with the quote; it is provided for informational purposes only. Invoicing and Payment The Contractor shall use the City’s Project and Contract Management System (Projectmates) to electronically submit invoices, change orders, and subcontractor reporting. Subcontractor payment information shall be submitted with each invoice. The General Contractor will need to provide the subcontractor’s name, primary contact name and title, company email address, company phone number, certification types (i.e. Small Business, Women-Owned Business, Minority Owned Business, DBE, etc.), certifying agency name (Virginia Small Business Supplier Diversity, National Minority Supplier Development Council, etc.) and certification number. The General contractor will report the subcontractor utilization based on commitments in the bid including stated SWaM or DBE percentages. Submissions for payment shall be based on the pricing contained in the contract documents. Payment will be authorized following receipt of a valid invoice, which must minimally include the Purchase Order Number, Contract number (if provided by the City), Description of Goods and Services, Breakdown of hours, and Total Price. Invoices may be submitted following the completion of services or agreed-upon terms. Insurance The Contractor shall maintain adequate liability insurance, which shall protect and save harmless the City of Newport News, Virginia, and its officials from all suits and actions of every kind and description arising from injury or damage to persons and property in the prosecution of said work or in failure to properly safeguard same, and from all claims arising under the workmen's compensation laws. Following award of the contract, the Contractor shall furnish proof of said insurance prior to commencement of services. Prior to submitting a quote, ensure that your firm fully understands the City’s insurance requirements, your carrier is properly rated and that your carrier can provide the required insurance and endorsements. Contractor shall have seven (7) days from the date of the City’s request to provide insurance certificates and endorsements. Failure to provide the certificates and endorsements within this timeframe may be cause for the City to rescind award of a contract and hold the original Bidder/Offeror liable for excess costs. Insurance requirements are specified herein in section 103 of the Attachment entitled "Regional Construction Standards Sections 102-110." Special Provisions (Section 110) Scope of Work Contractor is responsible to provide all labor, materials, and equipment for the repair of damage done to the Atkinson Boulevard Sound Barrier Wall in accordance with the specifications and requirements of this RFQ. Construction Drawings and Other Documents Plans are the property of the Owner and shall not be used for any purposes other than those specified in these Contract Documents. Drawings ( 23 Page Attachment) Specification ( 3 Page Attachment) Hampton Roads Planning District Commission Regional Construction Standards Prior to construction, the Contractor is required to obtain a copy of the Hampton Roads Planning District Commission Regional Construction Standards , Sixth Edition, from the Hampton Roads Planning District Commission located in Chesapeake, Virginia. Note: The attached Newport News Construction Standards document contains modifications, additions, or deletions modified by the Owner or by Special Provision to the HRPDC Regional Construction Standards are hereby incorporated into the contract documents. Newport News City Code References Certain sections of these Contract Documents contain references to the Newport News City Code, Article XX. Office of Purchasing. Modifications to Regional Construction Standards (Division 1) As listed in the Newport News Construction Standards, on Pages 110-2 through 110-28. Quote Form Information Quote Information Work to be completed in: 180 Calendar Days to Final Completion from Notice to Proceed, No substantial completion deadline. Liquidated Damages: $800 per calendar day after time for Final Completion has expired. Additional Quote Information Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of quotes, and final payment for all Unit Price quote items will be based on actual quantities provided, determined as provided in the Contract Documents. The prices quoted shall include without exception all materials, supervision, labor, equipment, appliances, clean-up, incidental items, applicable sales, use and other taxes, insurance, building permit or fees, and the Contractor's labor, overhead, profit, mobilization and other mark-ups, and in full accordance with the Contract Documents. Include allowance for waste where appropriate. Award The City will make the award based on Total Bid to the lowest responsive and responsible bidder. The City reserves the right to conduct any test it may deem advisable and make all evaluations. The City also reserves the right to reject any or all quotes, to award whole or in part, and to waive informalities prior to making the award, whenever it is deemed to be in its best interest. Quote Items (Descriptions and Measure of Payments) Item 1 : MOBILIZATION/DEMOBILIZATION The lump sum bid price for Mobilization/Demobilization shall include all costs for preparatory operations including but not limited to: all contract survey of stake out, monument survey, and utility identification/location, site preparations such as the project sign, permits, citizen notification, maintenance of traffic, area cleanup after completion of the project, restoration of all disturbed areas to an equal or better than existing condition, and production of “As-built” drawings. These “As-built” drawings and the construction stake out and surveying shall be performed by a Virginia licensed professional surveyor and the work shall include reestablishment of all property corners disturbed by the project. The mobilization and demobilization bid item shall be paid as follows: a. If the mobilization and demobilization line item does not exceed 8% of the Total Bid amount, the mobilization component will be paid as 50% of the mobilization and demobilization line item with the initial progress payment and the demobilization component will be paid as the same amount after approval of the “As-built” drawings following substantial completion of the project. b. If the mobilization and demobilization line item exceeds 8% of the Total Bid amount, the mobilization component will be paid as 4% of the Total Bid amount with the initial progress payment, and the demobilization component will be paid as the remainder of the mobilization and demobilization line item after approval of the “As-built” drawings following substantial completion of the project. Item 2 : REMOVE AND REPLACE SOUND BARRIER WALL PANELS Payment shall be at a LUMP SUM price to include all costs for furnishing and installing in kind sound barrier wall panels, labor, materials, hardware, equipment, services, disposal of existing sound barrier wall panels, and all incidentals required for installation and/or removal and of the sound barrier wall panels as shown on the contract documents. This item also includes any erosion and sediment control as required. Item 3: CONCRETE SUPERSTRUCTURE SURFACE REPAIR Payment shall be at a SQUARE FOOT price of surface area and will be paid for at the contract unit price per square foot for the type specified. This price shall include furnishing and placing concrete to fill the prepared areas. This price shall include cutting, drilling, hammering, and all other work involved in the completely removing and disposing of existing concrete and other materials necessary to provide for joining the new and old portions of the structure in accordance with the plans or as directed by the Engineer. The contract unit price shall also include dowels or other approved anchoring devices, disposing of debris, surplus, or other unsuitable material, cleaning and repairing reinforcing steel, and welded wire fabric if necessary. If shotcrete is used, the price shall also include furnishing and incorporating fibers. Item 4: MAINTENANCE OF TRAFFIC Payment shall be at a LUMP SUM price to include electronic arrows, warning lights, channelizing devices, Type III barricades, construction signs, and truck mounted attenuators will be paid for on a lump sum basis for this Project. The Contractor’s price bid shall include, but not be limited to providing a person to meet the basic work zone traffic control and intermediate work zone traffic control requirements of the bid documents, furnishing, placing, maintaining, replacing, relocating, adjusting, aligning, removing: warning lights, electronic arrow, channelizing devices, Type III barricades, construction signs, truck mounted attenuators, and all labor, material and equipment incidental to completing this work according to the project-specific temporary traffic control plan, the requirements in the Contract, the Virginia Work Area Protection Manual and traffic engineering guidelines and principles. Quote Notes 1.Payments during the course of the Work for lump sum items will be made on the basis of percentage of completion of the work items listed in the Schedule of Values for each lump sum item. The Schedule of Values shall be prepared by the Contractor and submitted to the City within 15 days of the execution of the Contract and shall serve as a breakdown of the lump-sum bid for the purpose of arriving at a basis for the monthly estimate. The Schedule of Values shall be broken down into categories and each category further broken down into each applicable specification section. The schedule shall add up to 100% of the Lump Sum Bid. 2. When submitting proposed change orders for lump sum items, the Contractor shall submit supporting data for the lump sum cost. Such data shall include, but not be limited to, labor cost, materials cost, equipment costs, overhead, and subcontractor markup. Subcontractor work shall include the same data. The City may compare this data to the schedule of values and / or current industry rates, to determine the legitimacy of the change order cost. The City may ask for additional information if determined necessary. 3. This Measurement and Payment note supersedes and replaces any similar sections in other documents that are otherwise applicable to this Project, including, but not limited to, Hampton Roads Regional Construction Standards. 4. There are numerous incidental items of work that are required to complete the Project. While these items may not be specifically mentioned or illustrated by the Contract Documents and there may be no specific pay items listed for them, the Contractor will be required to perform those incidental tasks that can be anticipated through inspection of the Contract Documents, inspection of the construction areas and experience in this class of construction. 5. Items considered incidental work shall not be measured for payment or paid for as such unless specified as unit price items on the Bid Form. These items and their costs shall be included in the unit prices or lump sum bid for other pay items unless bid separately. Quote Form In compliance with the Bid Documents titled, RFQ # 27-2225-3017 , Atkinson Boulevard Sound Barrier Wall Repairs , and all Addenda issued to date, all of which are part of this quote, the Bidder hereby proposes to furnish all items including materials, supervision, labor, and equipment in strict accordance with Contract Documents for the sum provided in their quote. Refer to the Quote Form Information section for additional quote information. Vendor Questionnaire All attachments requested to be uploaded below are limited to the following file types: .pdf (Portable Document Format file) - Recommended .doc and .docx (Microsoft Word document) .xls and .xlsx Source: OpenGov https://procurement.opengov.com/portal/nnva/projects/316658 Canonical URL: https://govcontractfinder.com/contracts/atkinson-boulevard-sound-barrier-wall-repairs-opengov-758-project-316658