GOVERNMENT CONTRACT OPPORTUNITY ============================== Notice ID: 6982AF27B000002 Title: AZ BL COLO 7528(1) Burro Creek Road Agency: TRANSPORTATION, DEPARTMENT OF Sub-Agency: FEDERAL HIGHWAY ADMINISTRATION Office: 6982AF CENTRAL FEDERAL LANDS DIVISI TYPE & CLASSIFICATION --------------------- Opportunity Type: Solicitation NAICS Code: 237310 PSC Code: Y1LB Set-Aside: Small Business Set Aside - Total LOCATION -------- State: CO City: LAKEWOOD ZIP: 80228 KEY DATES --------- Posted: 2026-10-15T15:15:37.000Z Response Deadline: 2026-11-17T21:00:00.000Z Status: Active DESCRIPTION ----------- PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement October 2026 Award-January - 2027 Construction January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 --- Source: Gov Contract Finder Canonical URL: https://govcontractfinder.com/contracts/az-bl-colo-7528-1-burro-creek-road-6982af27b000002 Official Source: SAM.gov Official URL: https://sam.gov/workspace/contract/opp/07013cf162754b15ba4b0f1b7d02d803/view