Bus Shelters and Amenities State and local opportunity open Ben Franklin Transit 26-15 Posted: 2026-10-22T16:00:01.380Z Response deadline: 2026-12-08T22:00:00.000Z Ben Franklin Transit (BFT) seeks a Contractor to provide bus stop shelters that enhance and incorporate elements of BFT's status as a large urban transit system and the rapidly growing community that we serve. Selected Shelters will be utilized at individual bus stops, in partnership with private and local entities, and at BFT Transit Centers. The work specified includes the design, fabrication and delivery of prefabricated shelters including wall frame (s), roof, glass panels, anti-graffiti coating, and all required accessories and hardware for installation. Shelter shall be designed by a Registered Architect and structurally engineered. Shelters shall be stable when all windows, roof, fascia and ground fastening are removed. Shelters shall be vandal-resistant, maintenance free and completely weatherproof. Scope of Work Project Summary Ben Franklin Transit (BFT) seeks a Contractor to design, fabricate, and deliver a family of prefabricated bus stop shelters that reflect the identity of BFT as a growing large urban transit system while providing improved comfort, durability, accessibility, and protection from the elements. The selected shelter system shall provide a cohesive architectural design that complements existing BFT shelters while offering enhanced weather protection. Note: BFT currently uses the Brasco Interlude, in a RAL9006 gray color. The Contractor shall provide a modular shelter system available in multiple standard sizes to accommodate varying passenger capacities and site constraints. The system shall include both standard footprint and narrow footprint shelter options suitable for constrained sidewalks and urban environments. The work includes the design, engineering, fabrication, and delivery of prefabricated shelters complete with structural framing, roof system, glazing, anti-graffiti protection, concealed wiring pathways, mounting hardware, and all accessories required for installation. Shelters shall be designed by a Registered Architect and structurally engineered. Shelters shall remain structurally stable during installation and maintenance activities and shall be vandal resistant, corrosion resistant, low maintenance, and designed for long-term outdoor service. Requirements All aluminum shall conform to Aluminum Association standards. Shelter construction shall comply with all applicable ADA requirements. Available in multiple standard sizes based on passenger capacity. Provide both standard footprint and narrow footprint configurations. Provide enhanced protection from high winds, rain, snow, and harsh sun. Shelters will be designed to withstand minimum dead loads and minimum wind loads per the current building codes for Eastern Washington, Benton and Franklin Counties, City of Pasco, City of Kennewick, City of Richland, City of Prosser, City of West Richland, and Benton City. Use modular, interchangeable components. Use clear tempered safety glass or approved equivalent. Provide UV protection on glazing and exposed materials. Include anti-graffiti protection. Wiring will be concealed within the structure of the shelter for current electronics and additional wiring for future implementation of on time arrival technology displays. Be capable of retrofit for future technologies without structural modification. Meet applicable structural and building codes. Include all installation hardware and anchors; shipped knock-down. Package each shelter individually. Submit drawings, engineering information, specifications, and installation requirements. Provide assembly instructions, parts lists, and installation time estimates. Shelters are to be supplied with all hardware and ground anchors necessary for installation and shipped KD (knock down). Each bus stop shelter will be individually packaged complete. Shelter drawings, material data, fabrication, step by step assembly, framing details, erection drawings, parts list and field installation instructions are to be included. Include estimated time for set-up of bus stop shelters at a site location. BFT will require bus stop shelters to be able to be assembled at site locations. Shelter Accessories and Options ADA-compliant bench Lean rail Trash receptacle Bicycle rack Bicycle repair station Solar power LED interior lighting with occupancy sensors Map/timetable display case Real-time passenger information display mounting systems Additional manufacturer accessories Custom shelter configurations Quantity of Bus Shelters BFT will order a minimum of ten (10) shelters during the initial purchase and may purchase additional shelters of varying sizes throughout the possible five-year contract. The contract does not obligate BFT to purchase more than the guaranteed initial order. Delivery Initial order shall be delivered within 120 calendar days after Notice to Proceed unless otherwise agreed upon. Warranty Minimum three-year workmanship/material warranty and five-year finish warranty. During this time frame, the contractor will be billed for all costs in relation to repair due to defects in materials, manufacturing, or finish. Replacement parts must be warranted to be available up to ten (10) years after the purchase of the shelters. Introduction Ben Franklin Transit, (hereinafter referred to as BFT), a municipal corporation of the State of Washington, located at 1000 Columbia Park Trail, Richland, WA 99352, is soliciting proposals from qualified firms to provide the following services and requests listed below. BFT is soliciting sealed electronic proposals in response to Request for Proposal (RFP) 26-15 Bus Shelters and Amenities . Interested Contractors shall create a Free account with OpenGov Procurement by signing up at: procurement.opengov.com . Once you have completed account registration, browse back to: https://procurement.opengov.com/portal/bft and click on "Submit Response", then follow the instructions to submit the electronic proposal by the proposal due date. Proposals are due on Tuesday, December 8, 2026 no later than 2:00 pm Pacific Daylight Time (PDT). If a Contractor would like to submit a proposal via sealed hard copy, please send your request to the Procurement Manager and a pdf version of the RFP will be emailed to you in order to then submit your sealed proposal via mail or in person. It is the Contractors responsibility to make aware to the Procurement Manager that they prefer these notifications via email. Summary Background Contact Information Lisa Mann Procurement Manager 1000 Columbia Park Trl Richland , WA 99352 Email: lmann@bft.org Phone: (509) 735-2302 Timeline BFT reserves the right to modify the Procurement Schedule through written addenda. Proposal Information Submission of Proposal BFT prefers electronic submission of proposals. Please submit electronic responses via the BFT’s OpenGov e-Procurement Portal: https://procurement.opengov.com/portal/bft . By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. If paper hard copy responses are to be made, they will be accepted and must be accompanied by an electronic copy on a USB key included in the response envelope. If mailing a hard copy response, please send 1 response(s) to: BEN FRANKLIN TRANSIT RFP 26-15 Lisa Mann , Procurement Manager 1000 COLUMBIA PARK TRAIL RICHLAND, WA 99352 If your company would like to hand deliver the sealed hard copy proposal please schedule an appointment in order to do so with the Procurement Lead of this project. BFT’s preference for electronic submissions of quotes shall not influence the evaluation of the bid. No late proposal submittals will be allowed. Electronic bids may not be submitted after due date and time. Paper Bids received after the date and time specified shall be returned unopened and shall not be considered. If, after reviewing this document, Contractor chooses not to submit a bid, Contractor is encouraged to complete the "No Bid" option within OpenGov. Questions and Answers Bidders shall submit all inquiries regarding this proposal via BFTs OpenGov Procurement Portal, located at https://procurement.opengov.com/portal/bft . Please note the deadline for submitting inquiries is Tuesday, December 1, 2026 by 5:00 pm PDT. All answers to inquiries will be posted on the BFT's OpenGov Procurement Portal or in an Addenda. Bidders may also click “Follow” on this proposal to receive an email notification when answers are posted. It is the responsibility of the Bidder to check the website for answers to inquiries. Acceptance or Requests for Contract Terms and Conditions By submitting a proposal, the prospective Contractor accepts the Terms and Conditions listed in RFP 26-15 that is included in this proposal package and any addenda’s. If prospective Contractor does not agree to the terms and conditions, prospective Contractor shall submit a request for clarifications or modifications to BFT prior to the questions and modifications due date of Tuesday, December 1, 2026 . Failure to follow this procedure may cause BFT to Award a Contract to the next highest rated prospective Contractor, due to the added cost BFT may incur due to the change in Terms and Conditions. Amendments to RFP, Clarification and Addendas Addenda Notification: Contractors are to register for an account via BFT’s OpenGov’s Procurement Portal. Once a bidder has completed registration, bidder can then “Follow” the project and in doing so bidder will receive addenda notifications to the registered email address. Ultimately, it is sole responsibility of each bidder to periodically check the site for any addenda at https://procurement.opengov.com/portal/bft . Bidder will be required to provide recognition of each addenda issued. Communication with Ben Franklin Transit Upon release of this solicitation document, all Proposer communications concerning this acquisition must be directed to: Ben Franklin Transit Lisa Mann , Procurement Manager 1000 Columbia Park Trail, Richland, WA 99352 E-Mail: lmann@bft.org Phone: (509) 735-2302 Unless authorized by the Director of Financial Services, no other BFT official or employee is empowered to speak for BFT with respect to this RFP. Proposers who seek to obtain information, clarification or interpretations from other BFT officials or employees are advised that such material is used at the Proposer’s own risk and that BFT shall not be bound by any such representations and such action may result in rejection of the proposal. Non-Mandatory Pre-Proposal Meeting BFT will hold a non-mandatory pre-proposal conference Wednesday, November 4, 2026 at 9:00 am , PDT, via Microsoft TEAMS, TEAMS Meeting: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/218431319580882?p=WPJxBRW7uTiawtU0yL Meeting ID: 218 431 319 580 882 Passcode: sM92fv9S ________________________________________ Need help? | System reference Dial in by phone +1 253-527-1980,,207337805# United States, Tacoma (844) 640-7974,,207337805# United States (Toll-free) Find a local number Phone conference ID: 207 337 805# . This is in order for Contractors to make comments or ask questions in regard to the project. Disadvantaged Business Participation BFT promotes equal employment opportunity and maximum practicable opportunity participation by Disadvantaged Business Enterprises certified by the State of Washington Office of Minority and Women-Owned Business Enterprises in its Contracts. Equal Employment Opportunity In all services, programs or activities, and all hiring and employment made possible by or resulting from this Contract, there shall be no discrimination by Contractor or by Contractor’s employees, agents, subcontractors or representatives against any person because of sex, age (except minimum age and retirement provisions), race, color, creed, national origin, marital status or the presence of any disability, including sensory, mental or physical handicaps, unless based upon bona fide occupational qualification in relationship to hiring and employment. This requirement shall apply, but not be limited to the following: employment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor shall not violate any of the terms of Chapter 49.60 RCW, Title VII of the Civil Rights act of 1964, the Americans with Disabilities Act, Section 504 of the Rehabilitation Act of 1973 or any other applicable federal, state or local law or regulation regarding non-discrimination. Any material violation of this provision shall be grounds for termination of this Contract by BFT and, in the case of the Contractor’s breach, may result in ineligibility for further BFT Contracts. Ineligible Contractors Contractor is required to certify that they or their Subcontractors are not on the Comptroller General’s list of ineligible Contractors. Rejection and Waiver BFT reserves the right to reject any or all proposals and to waive informalities and minor irregularities in offers received. This RFP may be cancelled at any time and any and all proposals may be rejected in whole or in part when it is in the best interest of BFT. Incurring Costs BFT is not liable for any costs incurred by the Contractor prior to issuance of a Contract. Single Proposal Process If only a single proposal is received, BFT may require that the Contractor provide verification of cost/price reasonableness, which may include but is not limited to: a cost analysis or a price comparison between the proposed price and that of similar items, materials, supplies, and/or services to confirm that the proposal submitted price is fair and reasonable. If requested, the Contractor shall provide the cost analysis or price comparison within seven (7) calendar days of the date requested. BFT reserves the right to reject or accept the proposal submitted on the basis of verification of price reasonableness. Award BFT shall evaluate all responsive and responsible proposals submitted to determine the highest rated proposal based on the evaluation criteria. BFT reserves the right to award the Contract to other then the highest evaluated proposal submitted, if Contract cannot be agreed to by both parties. BFT at its sole discretion reserves the right to accept or reject any and/or all proposals submitted and to waive minor informalities and irregularities to serve the best interest of BFT. BFT may enter into a Contract with the successful Contractor within one-hundred twenty (120) calendar days of the closing date or may extend this time frame or exercise the right to reject all proposals. Notice to Proceed BFT reserves the right to issue a Notice to Proceed at any time up to twenty (20) days following Award of the Contract. Procurement Protest Procedures Protest procedure will be as follows: Vendors and/or taxpayers wishing to protest the legitimacy of any type of procurement action outlined in this manual must submit their pre-award Notice of Protest in writing no less than eight (8) calendar days before the quote opening date. A protest of a proposed award or of an award shall be filed within seven (7) calendar days of the award of a contract or notice of apparent successful proposer/bidder, whichever is sooner. The Notice of Protest process: The Notice of Protest shall state in detail all issues and facts applicable to the protest. Issues and facts not stated in the Notice of Protest will not be considered. A meeting(s) will be called within three (3) calendar days of receipt of the protest and will include representatives from BFT and the protesting party to discuss the issue related to the protest. The protest meeting may be held in person, or by teleconference. A final determination will be made by the BFT Chief Executive Officer within three (3) calendar days of the final meeting, and the protestor shall be notified of the decision in writing by the Authority by regular mail. The Chief Executive Officer may, at their sole discretion, extend the limits of the timeline outlined above. Failure of the protestor to specify their objections in writing and in accordance with the specified time deadlines shall constitute a waiver of all right to protest. This protest procedure shall be made known to all prospective Contractors and is included or referenced in the requirement section of all solicitation documents. All communications with the parties involved, including BFT staff or board members concerning protest, shall be in writing, and will be open for public inspection. BFT shall be responsible for compiling and maintaining the written protest record. When a protest has been timely filed with BFT before award, BFT shall not make an award prior to five (5) calendar days after the resolution of the protest, or if a protest has been filed with FTA, during the pending of that protest, unless BFT determines that: The items to be procured are urgently required: Delivery or performance will be unduly delayed by failure to make the award promptly; or Failure to make prompt award will otherwise cause undue harm to BFT or the Federal Government. In the event that BFT determines that the award is to be made during the five (5) calendar day period following the local protest decision or the pending of protest, BFT shall notify FTA prior to making such award. FTA will not review the sufficiency of BFT’s determination to award during the pending of protest prior to FTA’s proposal protest decision. FTA reserves the right not to participate in the funding of any contract awarded during the pending of protest. Proposal Requirements Proposal Requirements Contractors' proposal should be clear, concise, and provide detailed information concerning the Contractors ability to successfully perform and provide for the obligations as described in the Scope of Work. All firms shall include the following documentation in the proposal package: Cover Letter Cover letter shall introduce the Contractor and establish interest in providing Bus Shelters and Amenities for BFT. The individual of whom Procurement may correspond with shall be listed on the letter along with their contact information. Experience Statement (Contractor shall have a minimum of three (3) years ’experience in the services being requested). Describe when the firm was founded and provide a professional history of the firm and its principals. Describe the depth of your firm’s experience and relate that experience to your understanding of skills necessary to complete this Contract. Describe the qualifications of your company, its business experience, and achievements. Emphasis should be placed on other transit agencies first, followed by local and state governments. Support Material if applicable, i.e. graphics, product details, etc. Frame finishes Materials Color selections/option details And any other relevant information that BFT may need to evaluate. Cost Proposal Complete your required cost proposal within OpenGov Procurement. (Unless your company chooses to submit the proposal via hard copy). If there are additional fees that cannot be listed on the Cost Proposal please ensure to include more detail of this within your Proposal and make sure the Procurement Lead is aware. There shall be no unknown fees. References Provide a list of at least three (3) and up to six (6) current clients and/or projects that have been completed within the last five years, to include Company name, address, contact name, current email address, phone number, and dates of service regarding similar projects. The point of contacts will then be sent (typically via email) a short survey to then be used as a part of the evaluation process. See section: #Vendor Questionnaire under "Forms to Complete". The required documents, which can be found on OpenGov Procurements Portal or requested from the Procurement Lead and sent as Adobe pdf hard copies are to be completed and submitted with Source: OpenGov https://procurement.opengov.com/portal/bft/projects/305022 Canonical URL: https://govcontractfinder.com/contracts/bus-shelters-and-amenities-opengov-509-project-305022