Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals) State and local opportunity open City of Frederick IFB-27-11 Posted: 2026-09-16T14:26:52.035Z Response deadline: 2026-12-02T20:00:00.000Z The City of Frederick (City) is seeking bids from qualified vendors to provide construction services for a Stream Restoration plan at Carroll Creek in the City of Frederick. The project consists of tree planting, grading, landscaping, and installation of rock sills, riffles/pools, and other stream stabilization measures in the existing Carroll Creek west of Monocacy Boulevard, along with associated erosion and sediment control measures. Construction stakeout survey controls (only) will be provided by the Owner. Construction Materials Testing and Inspections to be provided by the Contractor. As-Builts shall be provided by the Owner. The permit includes requirements self-inspection and record keeping - the Contractor SHALL BE responsible for providing the City of Frederick with inspection reports as outlined in the permit. SCOPE OF WORK and SPECIFICATIONS Carroll Creek Stream Restoration Scope of Work Information for Bidders: It is the intention of the City of Frederick to bid this project Carroll Stream Restoration, as one complete project. Construction stakeout survey controls only will be provided by the Owner. The Contractor shall carefully preserve benchmarks, property line and corner survey markers, monuments, location reference points and stakes (collectively, “reference points”). The Contractor shall be responsible for any mistakes or expense that may be caused by the loss or disturbance of any reference points, including, without limitation, the cost to remove and reconstruct improvements constructed by the Contractor in the wrong location. If any such reference point is removed, displaced, damaged, or destroyed, it shall be accurately replaced at the Contractor's expense by a person appropriately licensed by the State of Maryland for Land Surveying before completion of the Work, all subject to the approval and acceptance of the Engineer. Construction Materials Testing and Inspections to be provided by the Contractor. The Contractor shall be responsible for coordinating with the Inspection Consultant to schedule all necessary inspections and testing. Inspections and testing shall be required for all activities including but not limited to; grading, placement of fill, compaction, placement of asphalt, etc. The City and the Inspection Consultant shall meet with the Contractor prior to construction to establish required testing and inspections. As-Builts shall be provided by the Owner. Upon substantial completion, the Owner shall authorize their Consultant to complete the As-Builts. As-Builts shall be utilized in addition to Inspection and Testing reports to determine that work has been completed in accordance with the plans and specifications. Contractor is responsible for keeping record documents identifying any changes to the plans which occurred during construction. Contractor shall provide a copy of these record documents to the City upon request and at the time of As-Built preparation. The permit includes requirements self-inspection and record keeping. The permit also incorporates a section from EPA’s general permit language that states that a permittee must select, install, implement and maintain control measures at a construction site thatminimize pollutants in the discharge as necessary to meet applicable water quality standards and that, in general, the stormwater controls developed, implemented, and updated consistent with the laws and regulations cited in the general permit are considered as stringent as necessary to ensure that discharges covered by this permit do not cause or contribute to an excursion above any applicable water quality standard. The Contractor SHALL BE responsible for providing the City of Frederick with inspection reports as outlined in the permit. The inspections shall be completed on the inspection forms provided and shall, at a minimum, meet the following requirements: Monitoring and Records: For the purposes of monitoring, a permittee must do all of the following: During construction, maintain at the site the approved erosion and sediment control plan, the approved stormwater management plan, a copy of this General Permit, a copy of the NOI application and a copy of the NOI approval form. During the entire period of permit coverage, for all active and inactive sites, conduct inspections of the permitted area at the following intervals: Weekly; The next day after a rainfall event resulting in runoff; and As required in Part IV.B. Maintain at the site written reports of all inspections conducted by the permittee. The permittee shall use the standard written report form as provided by MDE. The permittee shall complete all applicable portions of the form and may attach additional information to the form. The permittee shall ensure that the report includes: the date and time of the inspection; the name(s) of the individual(s) who performed the inspection; whether significant amounts of sediment were observed as described in Part IV.B, Prevention of the Discharge of Significant Amounts of Sediment, above.; an assessment of the condition of erosion and sediment controls and how any deficiencies were or are being addressed; a description and date of any erosion and sediment control implementation and maintenance performed, including identification of any controls that have not been installed as required; and a description of the site's present phase of construction. D. Maintain pertinent data related to the NOI (including all data used to complete the NOI), self-inspection reports and inspection reports and enforcement actions issued to the permittee by the appropriate enforcement authority, including but not limited to all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, for a period of three (3) years from the date that the site is permanently stabilized as follows: Permittees must retain the records described in Part IV and V and records of all data used to complete the NOI to be covered by this permit. Maintain at the site written reports of all inspections conducted by the permittee as required by Part IV. C. Maintain all inspection reports and enforcement actions issued to the permittee from any appropriate enforcement or approval authority, including MDE, the delegated enforcement authority, or the U.S. Environmental Protection Agency. Records of monitoring information must include: The date, exact place, and time of sampling or measurements; The individual(s) who performed the sampling or measurements; The date(s) analyses were performed; The individual(s) who performed the analyses; The analytical techniques or methods used; and The results of such analyses. E. Ensure that samples and measurements taken for the purpose of monitoring are representative of the monitored activity. F. It is incumbent on the contractor to make themselves familia CHANGES TO CITY STANDARD ENGINEERING SPECIFICATIONS AND CONSTRUCTION DETAILS CHANGES TO CITY STANDARD ENGINEERING SPECIFICATIONS AND CONSTRUCTION DETAILS The work shall conform to the applicable sections of The City of Frederick Standard Construction Specifications (City Specifications) and Standard Construction Details (City Standards), available at https://www.cityoffrederickmd.gov/1320/City-Charter-Codes-Ordinances-and-Resolu , with the following changes. GP-2.04 SITE INVESTIGATION Add the following: Subsurface Information. Boring logs and other subsurface information made available for the inspection of bidders were obtained with reasonable care and recorded in good faith by the Owner. The subsurface information shown was obtained for Owner’s design and estimate purposes. It is made available to bidders so that they may have access to the same information available to the Owner. It is presented in good faith, but as with all subsurface information it represents only a small fraction of the total volume of material at the site. The soil and rock descriptions shown are as determined by a visual inspection of the samples from the various explorations unless otherwise noted. The observed water levels and/or water conditions indicated thereon are as recorded at the time of the exploration. These levels and/or conditions may vary considerably, with time, according to the prevailing climate, rainfall, and other factors. Interpolation between data points may not be indicative of the actual material to be encountered. Existing utilities are shown, on the drawings, from the best available data and may not represent all facilities present or may not represent facilities at their actual location. The locations of utilities or other underground man-made features were ascertained with reasonable care and recorded in good faith from various sources, including the records of municipal and other public service corporations, and therefore the location of known utilities may only be approximate. The Contractor shall be responsible for notifying Miss Utility at 1-800-257-7777 to locate existing facilities. The Contractor is also responsible for performing test pits as needed to confirm the locations and elevations of existing utilities prior to excavation activities. Test pits will be conducted at the Contractor’s expense and shall be considered incidental to other work performed. The Contractor is also advised that the drawings may not represent all surface features that may exist within the area of work, such as fences, shrubs, trees sheds, etc. The Contractor will be responsible for minimizing the disturbed area and for restoring all disturbed or destroyed features. GP-2.07 PROPOSAL PREPARATION Add the following: A. Bids which, in the opinion of the City or Engineer, are not properly balanced among the bid items may be rejected. END SECTION GP-2 SECTION GP-4 SCOPE OF WORK GP-4.02 GENERAL PROVISIONS CONTROLLING Supplement with the following: In case of difference between small and large-scale drawings, the large-scale drawings shall govern. Schedules on any Contract documents shall take precedence over conflicting information on the Contract drawings. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work, but they shall be performed as if fully and correctly set forth and described in the drawings and specifications at no additional cost to the Owner. Calculations shall be made for missing dimensions. Figures marked on drawings shall in general be followed in preference to scale measurements. The Contractor shall check all drawings furnished him immediately upon their receipt and shall notify the City Engineer of any discrepancies. The Contractor and City Engineer shall compare all drawings and verify the figures before laying out the work. The Contractor will then be responsible for any errors which might occur resulting from said layout. Standard Details are applicable when listed, bound with the specifications, noted on the drawings, or referenced elsewhere in the specifications. Where the notes on the drawings indicate modifications, such modifications shall govern. All documents and publications (such as, but not limited to, manuals, handbooks, codes, standards, and specifications) which are cited in this Contract for the purpose of establishing requirements applicable to equipment, materials, or workmanship under this Contract, shall be deemed to be incorporated herein as fully as if printed and bound herewith. GP-4.03 VARIATIONS IN ESTIMATED QUANTITIES Subsection GP-4.03 of the Specifications, titled "Variations in Estimated Quantities' will not apply to those construction items listed or identified in this Contract Document, and shall be deleted in its entirety. This Section shall be replaced with the following: All bid items listed in the Bid Schedule shall be considered as contingent items, with the quantities provided considered as contingent quantities, whether or not the items or quantities are specifically identified as contingent items or quantities. CONTINGENT ITEMS Construction items identified in these Special Provisions as being Contingent are provided in the contract for use when and as directed by the City Engineer. The quantities for these items shown on the plans and/or the Proposal, are established for the purpose of obtaining a bid price. The quantities for these Contingent items may be increased or decreased without any adjustment to the contract unit price by the Owner or City Engineer without negotiation. The Contractor will not be allowed to submit a claim against the City for any adjustment to the contract unit price bid, should the Contingent item(s) be increased, decreased, or eliminated entirely. Payment for any contingent item(s) used, will be made on the basis of the quantities GENERAL CONDITIONS These General Conditions apply to all City of Frederick (City) Solicitations, including but not limited to, Invitations to Bid (ITB), Request for Proposals (RFP), Request for Quotes (RFQ), and any other procurement (“Solicitation”) issued by the City. The terms Vendor, Contractor, Offeror, and Bidder are used interchangeably throughout the these General Conditions and the Solicitation documents, and each refers to any individual, firm, partnership, corporation, or other entity that submits a Response to a Solicitation. The term Response refers to any submission made by a Vendor in reply to a Solicitation. These General Conditions are intended to apply regardless of the evaluation method used, including low-bid, best value, or qualifications-based selection. NON-DISCRIMINATION The City of Frederick (City) does not discriminate on the basis of race, color, religion, sex, national origin, age, marital status, veteran status, disability, sexual orientation, gender identity, genetic information, or any other legally protected group in employment or in the provisions of services. INTERPRETATIONS Unless otherwise stated in the solicitation, any questions concerning conditions and specifications should be submitted in writing. CLARIFICATION AND ADDENDA TO SOLICITATION DOCUMENTS If any persons contemplating submitting a Response under this Solicitation are in doubt as to the true meaning of the specifications, Solicitation documents or any part thereof, they must submit questions in writing via the City of Frederick's OpenGov Portal no later than 3:00 pm am on Wednesday, November 11, 2026 . Any questions received after that time may or may not be answered at the City’s discretion. The City shall issue an addendum if substantial changes, which impact the technical submission of Responses, are required. In the event of conflict with the original Solicitation Documents, the Addendum shall govern over all other contract documents to the extent specified. Subsequent Addenda shall govern over prior addenda only to the extent specified. Addendum will be issued through the City's OpenGov Portal. Vendors are required to register for an account via the City's OpenGov Portal. Once registered, Vendors will receive addenda notifications to their email by clicking "Follow" on this project. The City will not be responsible for any other explanation or interpretation made verbally or in writing by any other City representative. Ultimately, it is the sole responsibility of each Vendor to periodically check the site for any addenda at the City's OpenGov Portal. SPECIAL CONDITIONS Any and all Special Conditions that may vary from these General Conditions shall have precedence. HEADINGS AND TERMS The headings to the various sections of this Solicitations have been inserted for convenient reference only and shall not in any manner be construed as modifying, amending, or affecting in any way the expressed terms and provisions hereof. Additionally, words such as contract/agreement and bidder/proposer/vendor may be used interchangeably in the various sections of this Solicitation and shall not in any manner be construed as modifying, amending, or affecting in any way the overall intent of the Document. DISCLAIMER The City may accept or reject, in whole or in part, for any reason whatsoever any or all submissions; re-advertise this Solicitation; postpone or cancel at any time this Solicitation process when it is in the best interest of the City to do so. Submissions that are not received on time or do not conform to the City’s requirements will not be considered. The City also reserves the right to contact a proposer for clarifications and may, at its sole discretion, allow a proposer to correct all formalities, informalities, and technicalities in the best interest of the City. The issuance of this Solicitation constitutes only a request to make submissions to the City. The City reserves the right to determine, at its sole discretion, whether any aspect of a submission satisfies the criteria established in this Request. The selection shall be based on the Response, which is in the sole opinion of the City, is in the best interest of the City. The final approval and recommendation for award of this Solicitation shall be in accordance with the City Purchasing Policies. Nothing in this Solicitation or accompanying documents submitted will create any contractual relationship between the City and proposer. The City assumes no obligations, responsibilities, and liabilities, fiscal or otherwise, to reimburse all or part of the costs incurred or alleged to have been incurred by parties considering a Response to and/or responding to this Solicitation. All such costs shall be borne solely by each proposer. The submission of a Response shall be prima facie evidence that the Vendor is familiar with and agrees to comply with the contents of this Solicitation. EXAMINATION OF DRAWINGS, CONTRACT DOCUMENTS AND PROJECT SITE Proposers shall thoroughly examine this Solicitation, and if applicable to this Solicitation, all other drawings, documents or other materials referred to herein and conduct investigations and site visits to completely understand the scope of project, project site conditions, and all other conditions relative to compliance with the Agreement. No plea of ignorance by the Vendor of conditions that exist or that may hereafter exist, as a result of failure or omission on the part of the Vendor to make said investigations and visits, and/or failure to fulfill in every detail the requirements of this Solicitation and the Agreement will be accepted as a basis for varying the requirements of the City or the compensation of the selected Vendor(s). SEALED BIDS The Vendor is required to carefully examine the specifications and be thoroughly informed regarding any and all conditions and requirements that may in any manner affect the work to be performed under the contract. No additional allowances will be made because of lack of knowledge of these conditions. It is further understood and agreed that each Vendor is solely responsible for all assumptions, deductions, or conclusions which they make or obtain from their examination of information made available by the City. Responses received after the closing time and date, for any reason whatsoever, will not be considered. Any disputes regarding timely receipt of Responses shall be decided in favor of The City of Frederick. COST OF PREPARATION OF RESPONSE The City will not be responsible for any cost incurred by any Vendor in the preparation of their Response. PROPRIETARY INFORMATION It shall be the Vendor’s responsibility to duly note on their submittal if any information in their submitted Response contains proprietary information and the context under which same should be handled by reviewers. Vendors shall not mark sections of their Response as proprietary or confidential if they are to be part of the award of the Contract/Agreemen Source: OpenGov https://procurement.opengov.com/portal/cityoffrederickmd/projects/294969 Canonical URL: https://govcontractfinder.com/contracts/carroll-creek-stream-restoration-cip-350007-mwbe-goals-opengov-4081-project-294969