Cathodic Protection System Testing State and local opportunity open City of Turlock, CA 2027-RFP-013 Posted: 2026-11-18T16:00:00.906Z Response deadline: 2026-12-17T23:00:00.000Z The City of Turlock and the Stanislaus Regional Water Authority (SRWA) are seeking Request for Proposals from qualified individuals or qualified firms to provide cathodic protection inspection, testing, and evaluation services for designated water and wastewater infrastructure. The selected individuals or firms will perform testing and evaluation of existing cathodic protection systems, including Impressed Current Cathodic Protection (ICCP) systems, rectifiers, anode ground-beds, test stations, and associated equipment. Services will include obtaining pipe-to-soil potential measurements, evaluating system performance, identifying deficiencies, and providing recommendations for corrective actions or improvements in accordance with applicable industry standards and criteria. The City and SRWA intend to select qualified individuals or firms with demonstrated experience in cathodic protection systems, corrosion control, and buried pipeline infrastructure to provide these services on an as-needed basis. SCOPE OF WORK The City invites you to submit a proposal for Cathodic Protection System Testing services. All work must comply with applicable federal, state, and local laws and regulations. The scope of work includes, but is not limited to, the following: Cathodic Protection System Testing The proposed scope of services shall include the inspection, testing, and evaluation of cathodic protection systems associated with Water Quality Control (WQC) and the Stanislaus Regional Water Authority (SRWA) facilities identified in Attachment A, CH24- Harding Drain Pump Station and NVRRWP Turlock Component . A. Cathodic Protection Inspection, Testing, and Evaluation. This includes Cathodic Protection Testing on all anodes/cathodic protection (CP) test stations, rectifiers and other related CP equipment as outlined in Attachment A : Chapter 24 Effluent Conveyance Facilities Harding Drain Pump Station and North Valley Regional Recycled Water Program: Turlock Component, as well as applicable SRWA facilities and infrastructure. The testing may include, but is not limited to measuring, evaluating, and recording the following data in the field: Measurement of pipe-to-soil potential (voltage) including native (static), On and Instant-Off potentials at all cathodic protection (CP) test stations and rectifiers. Energize and/or adjust the CP rectifiers. Rectifier voltage and current outputs for each unit. Anode current outputs for each unit. Potentials and current data on the galvanic cathodic protection (CP) system for Ductile Iron Pipe (DIP) and other laterals which are associated with this project. Inspection and evaluation of the overall condition and performance of the cathodic protection systems. Identification of deficiencies, equipment requiring adjustment or repair, and areas where additional cathodic protection measures may be recommended. All other pertinent data as required by the project specifications. B. Site Access, Safety, and Coordination. The individuals or firm shall coordinate all site access and field activities with WQC and/or SRWA staff, as applicable. The individuals or firm shall comply with all applicable facility safety and security requirements and provide traffic control where required. Any shutdowns, outages, equipment adjustments, rectifier adjustments, or other activities that may affect facility operations shall be coordinated in advance and shall not be performed without authorization from the appropriate WQC or SRWA representative. C. Testing Frequency. Cathodic protection systems are anticipated to be evaluated annually, or at other intervals as recommended based on the previous inspection report, system condition, or direction from WQC/SRWA. Additional testing may be requested as needed based on operational conditions, maintenance activities, or identified deficiencies. D. Comprehensive Written Report. At the end of the field investigation, the individuals or firm shall provide a comprehensive written report documenting all inspections and testing performed, including the results, findings, and any deficiencies identified for the applicable WQC and SRWA cathodic protection systems. The report will include discussions, test methods used, field results, evaluation of system performance, conclusions and recommendations. The report will also discuss the National Association of Corrosion Engineers (NACE) International Standard Practices Criteria as it relates to the cathodic protection of the buried pipe. Unless otherwise authorized by WQC or SRWA, the individuals or firms shall submit the completed written report within 30 calendar days following completion of the field investigation. The report may include, but not limited to the following data: Included an excel spreadsheet with all the field data attached. Discussion of the site corrosivity study results. Identification of deficiencies or areas not meeting applicable cathodic protection criteria. Recommended corrective actions, repairs, adjustments, or additional testing. Prioritization of recommended improvements, where appropriate. Individuals or firms are encouraged to recommend any additional options, recommended services, or tasks that would assist WQC and SRWA in evaluating the condition, effectiveness, and long-term performance of their cathodic protection systems. E. Required Qualifications and Documentation. Each individual or firm shall designate a qualified individual who will be responsible for providing technical oversight of all cathodic protection inspection, testing, evaluation, and reporting activities performed under this contract. INTRODUCTION The City of Turlock and the Stanislaus Regional Water Authority (SRWA) are seeking Request for Proposals from qualified individuals or qualified firms to provide cathodic protection inspection, testing, and evaluation services for designated water and wastewater infrastructure. The selected individuals or firms will perform testing and evaluation of existing cathodic protection systems, including Impressed Current Cathodic Protection (ICCP) systems, rectifiers, anode ground-beds, test stations, and associated equipment. Services will include obtaining pipe-to-soil potential measurements, evaluating system performance, identifying deficiencies, and providing recommendations for corrective actions or improvements in accordance with applicable industry standards and criteria. The City and SRWA intend to select qualified individuals or firms with demonstrated experience in cathodic protection systems, corrosion control, and buried pipeline infrastructure to provide these services on an as-needed basis. BACKGROUND In the heart of California’s Central Valley, Turlock is the second largest city in Stanislaus County located 100 miles south of Sacramento, CA covering an area just over 16 square miles with a population of over 73,000. Turlock is a General Law City that operates under the Council/Manager form of government. Regional Water Quality Control Facility The Regional Water Quality Control Facility (RWQCF) delivers approximately 10 million gallons per day (MGD) of tertiary-treated effluent to the North Valley Regional Recycled Water Program (NVRRWP) through a pipeline with a total length of approximately 38,000 feet. The project was completed in two phases: The Harding Drain Bypass Pump Station and Pipeline, and the North Valley Regional Recycled Water Program- Turlock Component Project. The combined construction cost for both projects was approximately $34 million, with construction completed in 2012 and 2020, respectively. The Harding Drain Bypass Pump Station (HDBPS) is located at the intersection of Prairie Flower Road and Harding Road, approximately 3.5 miles southwest of the Regional Water Quality Control Facility (RWQCF). The Harding Drain Bypass Pump Station (HDBPS) conveys treated effluent to the San Joaquin River through the Harding Drain Pipeline. The Harding Drain pipeline consists of approximately 5.6 miles of 36 inch diameter welded steel pipeline. The North Valley Regional Recycled Water Program (NVRRWP) Project includes approximately 7.2 miles of pipeline from the City’s Harding Drain standpipe structure to the Modesto Effluent Pump Station (MEPS). The project also includes a flow meter, a flow control valve vault at the MEPS, and associated ancillary facilities. Water flows by gravity from the standpipe structure to the flow control valve vault and ultimately to the Modesto Effluent Pump Station (MEPS). The pipeline is routed from the outfall site north along South Carpenter Road, west along West Main Street, and north along Jennings Road to the City of Modesto’s Jennings Road Plant. The pipeline alignment is located within the public right-of-way. An overview of the HDBPS and NVRRWP facilities is provided in Attachment B, Figure 1: Project Overview . The selected individuals or firms will be responsible for testing the impressed current cathodic protection (ICCP) system rectifiers and anode ground-beds, as well as obtaining pipe-to-soil potential measurements at the test stations associated with the ICCP system at the subject site. Testing shall be performed or directly supervised by a qualified technician holding a current Association for Materials Protection and Performance (AMPP), formerly National Association of Corrosion Engineers (NACE), certification or a current Certification Scheme for Welding Inspection Personnel (CSWIP) Corrosion Specialist certification. The qualified technician shall verify that all measured pipe-to-soil potentials comply with applicable industry standards and criteria. Attachment A, CH24- Harding Drain Pump Station and NVRRWP Turlock Component includes a copy of the baseline survey and span continuity testing results for reference. The City of Turlock will enter into an agreement with the individuals or firms selected to provide these services. All interested parties are required to submit proposals in accordance with the conditions and dates outlined in this Request for Proposal (RFP). Stanislaus Regional Water Authority The Stanislaus Regional Water Authority (SRWA) is a Joint Powers Authority formed by the Cities of Turlock and Ceres to develop and operate a regional surface water supply system serving both communities. The SRWA was established to diversify the region’s drinking water supplies and reduce reliance on groundwater resources within the Turlock Groundwater Subbasin. Historically, both cities relied almost entirely on groundwater for municipal supply. Increasing regulatory requirements, declining groundwater quality in some areas, and long-term sustainability concerns prompted the development of the Regional Surface Water Supply Project (RSWSP). This project utilizes surface water from the Tuolumne River, which is diverted, treated, and delivered to the Cities of Turlock and Ceres through a regional treatment and transmission system. The Regional Surface Water Supply Project includes a regional surface water treatment plant, raw water conveyance facilities, finished water storage, and multiple transmission pipelines delivering treated drinking water to the participating cities. The treatment facility has the capacity to produce up to 30 million gallons per day (MGD) of treated drinking water to support regional demand and long-term water supply reliability. Key transmission pipelines within the SRWA system include: Raw Water Transmission Main (RWTM) – A 48-inch diameter cement mortar coated and lined steel pipeline conveying raw water from the intake and pumping facilities to the regional water treatment plant. Turlock Finished Water Transmission Main (Turlock FWTM) – A 42-inch diameter pipeline approximately 7.4 miles in length conveying treated drinking water from the treatment plant to the City of Turlock distribution system. Ceres Finished Water Transmission Main (Ceres FWTM) – A 30-inch diameter pipeline approximately 5.2 miles in length conveying treated drinking water from the treatment plant to the City of Ceres distribution system. An overview of the RWTM, Turlock, FWTM and Ceres FWTM facilities are shown in Attachment C, Figure 2: SRWA Project Overview. To protect the steel transmission mains from external corrosion, the pipelines are cement mortar coated and cement mortar lined steel pipe equipped with cathodic protection (CP) systems. Monitoring test stations are installed along the pipelines at approximately 1,000-foot intervals to allow for measurement of pipe-to-soil potentials and evaluation of the cathodic protection system performance. The SRWA is seeking qualified individua FORMAL PROPOSAL GUIDELINES Vendors are to provide the City with a proposal using the following guidelines: Each proposal must adhere to the following order and content of sections. Qualifications and Experience Provide a brief history of your business entity and project team. Identify legal form, ownership, and senior officials of company. Identify the name and email of the main contact, including phone number and e-mail address, and the website address (if applicable). Include Unique Entity Identifier (SAM.GOV) If proposing a sub-consultant - describe the division of responsibilities between participating parties, and offices (location) that would be the primary participants. Describe professional experience and number of employees (licensed professionals, technical support) on the proposed project team. Responsible Individual Qualifications. The individual responsible for technical oversight shall possess a current Association for Materials Protection and Performance (AMPP) Cathodic Protection Technologist (CP3) certification, or higher-level AMPP cathodic protection certification, or an equivalent recognized cathodic protection certification acceptable to the City. Resume and Experience. A current resume for the designated responsible individual demonstrating relevant education, qualifications, and professional experience in the inspection, testing, evaluation, and reporting of cathodic protection systems. Field Personnel Qualifications. Identification of all other personnel who will perform field inspection and testing activities, including a description of their respective roles, relevant experience, and applicable cathodic protection qualifications and certifications. Methodology Section Provide a detailed description of the approach and methodology to be used to accomplish the Scope of Work of this RFP. The Methodology Section should include: An implementation plan that describes in detail the methods, including controls by which your firm or entity manages projects of the type sought by this RFP. Detailed description of efforts your firm or entity will undertake to achieve client satisfaction and to satisfy the requirements of the "Scope of Work" section. Detailed description of specific tasks you will require from City staff. Explain what the respective roles of City staff and your staff would be to complete the tasks specified in the Scope of Work. Proposers are encouraged to provide additional innovative and/or creative approaches for providing the service that will maximize time and cost-effective operations or increased performance capabilities. In addition, the City will consider proposals that offer alternative service delivery means and methods for services desired. Staffing Provide a list and resumes of individual(s) who will be working on this project, their relevant experience, and indicate the functions that each will perform and anticipated hours of service of each individual. Similar Projects Provide a list of at least three (3) municipal/public agency references for similar services provided by your firm. The City reserves the right to contact any of the organizations or individuals listed. Information provided should include: Client Name Project Description Project start and end dates Client project manager name, telephone number, and e-mail address Fee Proposal All proposers shall submit a fee proposal that delineates tasks, hours, and cost for all staff working on the project. Proposals shall be valid for a minimum of 180 days following submission. PROCESS FOR SUBMITTING PROPOSALS Submission Process Proposals must be submitted electronically through the City's eProcurement Portal located at https://procurement.opengov.com/portal/cityofturlock . Proposal may be received up to, but no later than Thursday, December 17, 2026 at 3:00 pm . The City eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline, regardless of any technical difficulties, such as poor internet connections. City of Turlock strongly recommends completing your response well ahead of the deadline. The City reserves the right, without limitation and at its sole discretion, to accept or reject any or all proposals and/or terminate this RFP process at any time, for any reason, without notice and with no obligations. Vendor Questions and Clarifications All questions regarding this RFP must be submitted through the City's eProcurement Portal located at https://procurement.opengov.com/portal/cityofturlock . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City's eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. EVALUATION CRITERIA The City will screen and review all proposals according to the weighted criteria set forth below. While price is one basic factor for award, it is not the sole consideration. Please note that this RFP pertains to professional services, and the below referenced scoring rubric will be used as guidance only. Given the nature of the services, the City reserves the right to utilize its discretion in awarding the project. The City also reserves the right to negotiate pricing and contract terms. After reviewing the proposals, City Staff may conduct interviews with the top vendors. Staff will forward a recommendation to the City Council for final selection. The City reserves the right to reject all proposers and/or to invite other individuals and/or vendors to respond to this RFP if the proposals received are inadequate. Evaluation Criteria is as follows: SELECTION PROCESS The selection process will consist of three stages: Responsiveness Screening Proposals will first be screened to ensure responsiveness to the RFP. The City may reject as non-responsive any proposal that does not include the documents required to be submitted by this RFP. At any time during the evaluation process, the City reserves the right to request clarifications or additional information from any or all Proposers regarding their proposals. Proposal Review The Committee will review and score all responsive proposals based upon the Evaluation Criteria set forth above. The City may contact and evaluate the Proposer’s references, contact any Proposer to clarify any response or request revised or additional information, contact any current users of a Proposer’s services, solicit information from any available source concerning any aspect of a proposal, and seek and review any other information deemed pertinent to the evaluation process. Following conclusion of the evaluation process, the Committee will rank all Proposers according to the evaluation criteria set forth above. The Committee will conclude the evaluation process at this point, and make a recommendation for award. Negotiation Process Negotiations shall be confidential and not subject to disclosure to competing Proposers unless an agreement is reached. If contract negotiations cannot be concluded successfully within a time period determined by the City, the City may terminate negotiations and commence negotiations with the ne Source: OpenGov https://procurement.opengov.com/portal/cityofturlock/projects/294299 Canonical URL: https://govcontractfinder.com/contracts/cathodic-protection-system-testing-opengov-18371209-project-294299