CCTV Modernization Project State and local opportunity awardPending Orange County Sanitation District, CA E-2026-737BD Posted: 2026-10-19T16:01:22.756Z Response deadline: 2026-11-10T22:00:00.000Z The purpose of this procurement is to furnish the Equipment, Software, and Licensing required to support OC San’s CCTV Modernization and Expansion project at Plant No. 1, Plant No. 2, and six (6) remote wastewater Pump Stations. Single-channel modular camera main unit that connects to one separate AXIS F Series sensor and supports video resolutions up to 4K. 1080p modular mini-dome sensor with a fixed 110-degree wide-angle view and built-in infrared illumination. 4 MP fixed-dome camera with a fixed 102-degree wide-angle view and built-in infrared illumination. Explosion-protected 4K bullet camera with a varifocal lens providing an approximately 49- to 108-degree field of view. 8 MP bullet camera with a varifocal lens providing an approximately 46- to 114-degree field of view and built-in infrared illumination. 5 MP dome camera with a varifocal lens providing an approximately 34- to 104-degree field of view and built-in infrared illumination. Four-channel, multidirectional camera with four adjustable 5 MP camera heads for up to 360-degree coverage. 4 MP long-range bullet camera with 32x optical zoom and built-in infrared illumination. Back box for compatible bullet cameras that provides conduit connections and space for cabling and network connectors. Back box for larger Axis cameras that provides conduit connections and space for cabling and network devices. Adapter used to attach compatible AXIS M32 and P32 dome cameras to pendant-style mounts. Adapter used to attach AXIS P37 multidirectional cameras to pendant-style mounts. Wall-mounted arm with a 1.5-inch NPS connection for compatible pendant kits and cameras. Wall-mounted arm used with compatible Axis dome-camera pendant kits. Adapter used to attach compatible Axis cameras or wall mounts to a pole. Pole mount with a 1.5-inch NPS connection for fixed-dome and multidirectional cameras using pendant kits. Mount used to install compatible dome and multidirectional cameras on an exterior building corner. Tower-form video recording server with 32 TB of storage and support for up to 50 camera channels. Milestone Software Licenses XProtect Expert for each camera Tiger Surveillance Bridge Software Licenses for each camera Two-unit, 5 GHz Wi-Fi 6 wireless bridge kit used to create a point-to-point network connection between locations. FOB Destination Notice Inviting Bids CCTV Modernization Project Specification No. E-2026-737BD Submittal Information Orange County Sanitation District (OC San), of Orange County, California, will receive bids until 2:00 pm on Tuesday, November 10, 2026 . Bids must be received via our OpenGov Procurement & Contract Management system at https://procurement.opengov.com/portal/ocsan by the date and time herein above set forth, at which time it will be automatically tabulated. The buyer will then examine each bid for responsiveness. Bids must be submitted in accordance with all provisions of the specifications. Summary: The purpose of this procurement is to furnish the Equipment, Software, and Licensing required to support OC San’s CCTV Modernization and Expansion project at Plant No. 1, Plant No. 2, and six (6) remote wastewater Pump Stations. Jeremey Arbiso , Sr. Buyer Contracts, Purchasing & Materials Management ATTENTION BIDDERS: Only IFB documents downloaded from the Orange County Sanitation District's OpenGov Procurement & Contract Management portal shall be considered official. Companies may access the portal by going to https://procurement.opengov.com/portal/ocsan . General Provisions The following general bidding provisions, Purchase Order Contract provisions, Technical Specifications , all exhibits, and Terms & Conditions provided herein shall apply to all bids. Bid Cost Bid cost shall be submitted electronically to the OpenGov Procurement solicitation. Bid Pricing All pricing and evaluative material contained in submitted bids must be valid through the Purchase Order Contract term. At no time shall the bids be altered. Bid Validity Bids submitted hereunder shall be valid for a period of not less than 180 calendar days from the date of the bid opening. Bid Withdrawal If a bidder wishes to withdraw their bid they may do so without prejudice at any time before the scheduled bid opening. The withdrawal of a bid does not prejudice the right of a bidder to submit a new bid before the deadline for delivery of bids. A bidder may withdraw their bid prior to the deadline for receipt of bids by clicking the "Unsubmit" button. Preparation Costs All costs incurred in the preparation, submission and/or presentation of any bid responding to this Bid package, including, but not limited to prospective bidder’s travel and personal expenses shall be the sole responsibility of the bidder and shall not be reimbursed by OC San. OC San shall not pay for any costs incurred for bid preparation as a result of termination of this Invitation for Bids or termination of the Purchase Order Contract resulting from this bid. Disqualification of Bids More than one bid from any person, firm, partnership, corporation, or association under the same or different names will not be accepted and any reasonable grounds for believing that any firm, partnership, corporation, or association has a legal interest in more than one bid will be cause for rejecting all bids in which person, firm, partnership, corporation, or association has an interest. Apparent collusion among the Bidders will likewise be sufficient cause for rejecting any or all bids, and the participants in such collusion may be barred or disqualified from submitting future bids to OC San. Bids in which the prices obviously are inconsistent may be rejected. The wording of the bids shall not be changed. Any additions, conditions, limitations, or provisions inserted by the Bidder will render the bid irregular and may cause its rejection. OC San reserves the right to reject any and all Bids, extend deadlines, and enter negotiations with any Bidder. Receipt of Bids All Bidders must submit their bid electronically and upload all required forms by the date and time called for in the Invitation for Bids, which is at 2:00 pm on Tuesday, November 10, 2026 . Confidential Information Bids submitted to OC San may contain technical, financial, or other information that, if publicly disclosed, may cause substantial injury to the Bidder’s competitive position, or may be a trade secret. To protect such information from disclosure, the Bidder may upload a Public Copy of their bid that redacts any purported confidential information. The file uploaded should be clearly titled “Public Copy” . Redaction consists of the Bidder making the sensitive information unreadable. This can be done by blacking out the text with a marking pen or covering the text with a blank piece of paper. By redacting or covering the text rather than deleting the text, the pagination of the original bid will be preserved. In the event a “Public Copy” is not provided at time of Bid submission, OC San shall assume that the bidder has declared and agreed that no Confidential Information exists in its bid and make the original bid available in its entirety to Public Information Records Requests. OC San will use its best efforts to inform the Bidder of any request for any financial records or documents marked “Trade Secret”, “Confidential” or “Proprietary” provided by the Bidder to OC San. OC San will not advise as to the nature or content of documents entitled to protection from disclosure under the California Public Records Act. OC San will not be held liable for any damage or injury which may result from any disclosure of information provided by Bidder. In submitting a Bid, the Bidder agrees to indemnify, defend, assume, and pay for all costs incurred by OC San including, but not limited to, attorneys’ fees awarded by the court, if the Bidder asserts that information provided by Bidder is confidential information, and in reliance upon Bidder’s affidavit, OC San does not disclose material provided to OC San by the Bidder. Protests By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with Orange County Sanitation District's "Filing of Protests and Protest Procedures". Addenda Any OC San changes to the requirements will be made by an addendum to this Invitation for Bids (IFB). Any addendum issued pertaining to this Bid shall be incorporated into the terms and conditions of any resulting Purchase Order Contract . OC San will not be bound to any modifications to or deviations from the requirements set forth in this Bid as the result of oral instructions. Clarifications Should a Bidder require clarification of this Bid; the Bidder shall notify OC San in writing in accordance with Section Inquiries below. Should it be found that the point in question is not clearly and fully set forth, OC San will issue an addendum clarifying the matter which will be posted to this IFB on OC San's OpenGov Procurement portal. Inquiries Prospective Bidders are required to put all questions, clarifications or comments in writing and submit online via the Q&A process for this Bid at OC San’s OpenGov Procurement portal at https://procurement.opengov.com/portal/ocsan on Wednesday, October 28, 2026 at 2:00 pm . Price Confirmation Prior to the award of the Purchase Order Contract , the apparent low Bidder will need to confirm that each line item is at the correct pricing. In the event there is a discrepancy between the submitted bid price and the confirmed price, in comparison to other Bids received, OC San shall have the option to either reject the Bid in its entirety or remove that item from the bid cost. Award Recommendation An Award Recommendation may be made to the lowest responsive and responsible Bidder for the total lump sum cost of equipment/goods. OC San reserves the right to reject any or all Bids, waive any or all irregularities and accept or reject any portion of each individual Bid. Any missing bid requirements may deem the bid as non-responsive. OC San will be the sole authority in the evaluation of the bids, responsiveness, and responsibility. OC San shall not be liable for any costs incurred in connection with the preparation and submittal of the bid due to rejection or otherwise. OC San reserves the right to award its total requirements to the lowest responsible, responsive bidder or to apportion those requirements among several as OC San may deem to be in its best interest. No Commitment to Award Issuance of this Invitation for Bids (IFB) and receipt of Bids shall not commit OC San to award a Purchase Order Contract . OC San expressly reserves the right to postpone Bid opening for its own convenience, to accept or reject any and/or all Bids received in response to this Invitation for Bids, or to cancel all or part of this Bid. Purchase Order Contract OC San will require the awarded Vendor to enter into a Purchase Order Contract , which shall incorporate all the terms, conditions, and provisions of the IFB, including Technical Specifications , and associated documents. A draft Contract containing key provisions required by OC San is attached to this IFB. Instructions to Bidders Instructions to Qualify an Approved Equal Requests for approved equals must be received by OC San in writing no later than 2:00 pm on Wednesday, October 28, 2026 . Any request for an approved equal must be fully supported with brochure, technical data, test results, or other pertinent information as evidence that the substitute offered is equal to or better than the specification requirements. Please email to jarbiso@ocsan.gov . The burden of proof as to the equality, substitutability, and compatibility of the proposed alternates or equals shall be upon the Bidder, who shall furnish all necessary information at no cost to OC San. OC San shall be the sole judge as to the equality, substitutability, and compatibility of the proposed alternates or equals. All Bidders will be notified of all OC San approved equals in an upcoming addendum for this Invitation for Bids no later than November 2, 2026. . Please see Section Confidential Information as to instructions for the communication of Confidential information to OC San. Iran Contracting Act Verification The Iran Contracting Act of 2010 (Public Contract Code sections 2200-2208) prohibits Bidders engaged in investment activities in Iran from bidding on or entering into or renewing contracts with public entities for goods and services of one million dollars ($1,000,000) or more. Bidders bidding on or entering into or renewing an OC San contract for goods or services of $1,000,000 or more must either: Certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (DGS) pursuant to Public Contract Code section 2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current DGS list of persons engaged in investment activities in Iran; or Demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d). The DGS list of entities prohibited from contracting with public entities in California per the Iranian Contracting Act of 2010 may be found at: https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/List-of-Ineligible-Businesses#@ViewBag.JumpTo . California law establishes penalties for providing false certifications, including civil penalties equal to the greater of $250,000 or twice the amount of the contract for which the false certification was made; termination of an existing contract; and inability to bid on a contract for three years. When submitting its Bid of one million dollars ($1,000,000) or more, Bidder shall complete and submit the Iran Contracting Act Verification Form , and any necessary documentation, when applicable. Delivery The equipment/goods shall be delivered F.O.B. destination to Orange County Sanitation District, Plant No. 1, 10844 Ellis Avenue, Fountain Valley, California, 92708. Vendor assumes full responsibility for all transportation, scheduling, packing, handling, insurance, and other services associated with delivery of all equipment and material deemed necessary under this Purchase Order Contract . Gray Market Vendors All equipment purchases must carry the manufacturer’s warranty and liability on such equipment. Evidence to substantiate the dealer’s relationship with the manufacturer may be required. Vendor shall certify that it is an Authorized Channel or Distributor for the listed Manufacturers in Exhibit A as of the date of their bid submission, and that it has the certification/specialization level required by the manufacturer to support both the product sale and product pricing, in accordance with the applicable certification/specialization requirements. Unless otherwise specified, Vendor shall warrant that the products are new and in their original box. The Vendor confirms to have sourced all products submitted in this offer from the listed manufacturers in Exhibit A thro ugh Authorized Channels only, in accordance with all applicable laws and current applicable policies of the manufacturer at the time of purchase. NOTE: ALL ITEMS MUST MEET THIS PROVISION. IF ANY ITEMS ORDERED ARE NOT IN COMPLIANCE WITH THIS PROVISION ALL ITEMS WILL BE RETURNED AT BIDDER’S EXPENSE FOR A FULL REFUND THAT WILL INCLUDE PRODUCT COSTS, SALES TAXES, SHIPPING/HANDLING CHARGES AND RETURN SHIPPING AND HANDLING CHARGES. New and Unused Equipment/Goods Equipment shall be new and unused and of current production. Staff Assistance Vendor will be provided with the name and contact information of the Project Manager at the start of the Purchase Order Contract . Upon award of Purchase Order Contract , questions regarding the Technical Specifications , scheduling, etc. for this project should be addressed to the Project Manager. Also, upon award of Purchase Order Contract , please refer all contractual matters, aside from those of a technical nature, to the buyer as referenced in the Bid documents. Purchase Order Contract Provisions Purchase Order Contract Term The goods provided under this Purchase Order Contract shall be delivered as outlined in the Technical Specifications . Payment & Invoicing OC San shall pay, Net 30 days, upon receipt of itemized invoices, submitted for work completed in accordance with the Technical Specifications (Exhibit A). The awarded Vendor will mail the invoices to Orange County Sanitation District, 18480 Bandilier Circle, Fountain Valley, CA 92708, Attention Accounts Payable or via email to APStaff@ocsan.gov . All cash discounts shall be taken and computed from the date of completion of tasks or acceptance of equipment/goods and material, or from the date of receipt of invoice, whichever occurs last. In an effort to provide quicker payment, OC San may offer payment by Single-Use Account (SUA) or Automated Clearing House (ACH). OC San is required to withhold 7% on all payments made to non-California resident service providers for professional services, rents, leases, or royalties paid. Any funds withheld shall be remitted to the California Franchise Tax Board on a quarterly basis. Vendors may be exempt from this requirement by their exemption status and submitting the California Form 590 to OC San’s Financial Management Division via regular mail or email to APStaff@ocsan.gov . Non-Exclusive Purchase Order Contract This Purchase Order Contract is a non-exclusive contract. OC San reserves the right to enter contracts with one or more companies in order to provide supplemental services. Assignment of Contract This Purchase Order Contract will not be assigned to another Vendor without prior written authorization of OC San. Pricing Bid price for CCTV Modernization Project shall remain firm during the Purchase Order Contract period. All prices shall be F.O.B. destination. The bid shall include all cartage and taxes per gallon except California State Sales Tax. The sales tax will be paid by OC San. The sales tax shall not apply to freight charges. California Law The Purchase Order Contract with the awarded Vendor shall be governed by the laws of the State of California. Pre-Contractual Expenses OC San shall not under any circumstances be liable for Bidder’s cost of engaging in any activity prior to the effective date of award, if any, of a Purchase Order Contract resulting from this IFB. Delivery Hours Unless otherwise noted in Technical Specifications , the awarded Vendor will deliver goods through OC San’s Warehouse at Plant No. 1. All deliveries shall be scheduled Monday through Thursday between 7:00 AM PT and 3:30PM PT, and Friday, between 7:00 AM PT and 3:00 PM PT. Damage to OC San Property Any OC San property damaged by the Vendor or the Vendor ’s personnel will be subject to repair or replacement by the Vendor at no cost to OC San. Warranty Manufacturer’s standard warranty shall apply unless otherwise stated in this solicitation. All manufacturer warranties will begin at date of acceptance of the equipment/goods. Equipment Warranty All manufacturer warranties will begin at date of acceptance of the equipment/goods. The Vendor shall warrant all equipment/goods and parts supplied under this Agreement for a period of one (1) year. Vendor shall be responsible for replacing the defective part at no cost to OC San, including freight. This warranty does not cover parts damaged by decomposition from chemical reaction or wear caused by abrasive materials, nor does it cover damage resulting from misuse, accident, neglect, or from imp Source: OpenGov https://procurement.opengov.com/portal/ocsan/projects/294517 Canonical URL: https://govcontractfinder.com/contracts/cctv-modernization-project-opengov-16885-project-294517