CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility State and local opportunity evaluation Escambia County PD 26-27.004 Posted: 2026-10-23T19:27:30.320Z Response deadline: 2026-11-25T16:00:00.000Z This project is to provide construction services to build five structures (Administration Building, Maintenance Building, Passenger Terminal Transfer Center, Bus Wash, and Fuel Station) along Clarinda Lane in Pensacola, Florida. Scope of Work Overall Scope of Work The following individual scopes are intended to be read together with the complete Bid Package 2 (BP2) Contract Documents and Project Manual. BP2 encompasses architectural work, fire protection, plumbing, HVAC, electrical, safety/security systems, earthwork with exterior improvements, together with the applicable procurement, contracting and general requirements. For each facility, the Contractor shall furnish and coordinate all incidental work reasonably necessary for a complete installation, whether specifically itemized or required by the drawings, specifications, codes, manufacturers’ requirements or authorities having jurisdiction. Work shall include required submittals and shop drawings, coordination drawings, testing and balancing, system commissioning, equipment start-up, demonstrations and training, warranties, O&M data and record documents. The Project Manual specifically requires final O&M manuals before Substantial Completion and organization of the manuals by systems, subsystems and equipment. Lot 1: Administration Building - Scope of Work The Work associated with the Administration Building consists of furnishing all labor, supervision, materials, equipment, tools, transportation, permits, testing, inspections, coordination, and incidentals necessary to complete construction of the new Escambia County Area Transit Administration Building at 20 Clarinda Lane, Pensacola, Florida, in accordance with the Contract Documents. The Project includes, but is not limited to, complete construction of a two-story administrative and operations facility, together with the associated architectural, structural, mechanical, electrical, plumbing, fire protection, communications, technology, security, and life-safety systems necessary to provide a complete and fully operational facility. The building is identified as Business occupancy on the first floor with Assembly occupancy associated with the second floor training area. The facility shall include, at a minimum: Public lobby, vestibules, reception and administrative reception areas; Call Center; Radio Room and Dispatch functions; Safety Manager offices, Chief Safety Officer office, Program Manager office, ADA office and related administrative/support offices; Accounting, Finance, Grants and management offices; Division Manager, Deputy Director, Director and Director’s Aide offices; Conference Room, Meeting Room, and associated presentation areas; Simulation area; Breakroom and employee support spaces; Breakroom and employee support spaces; Mother’s Room and Quiet Room; Men’s and women’s locker rooms; Men’s, women’s and ADA toilet facilities; Office supplies, janitor, general storage and support spaces; IT, electrical, mechanical and plumbing support areas; Second-floor Training Room configured for large-group training and presentations; Second-floor storage, restrooms, corridors and mechanical/support areas; Elevator and stair systems providing vertical circulation between floors; Interior partitions, rated assemblies, ceilings, flooring, wall finishes, millwork, countertops, casework and specialties; Exterior wall assemblies, glazing, doors, entrances, roof assemblies, flashing, drainage components and associated weatherproofing; Structural foundations, slabs, masonry, structural steel, elevated floor framing, roof framing and associated structural components; Complete HVAC systems, ventilation, exhaust, controls and associated mechanical equipment; Domestic water, sanitary waste and vent systems, plumbing fixtures, water heating and associated plumbing specialties; Automatic fire sprinkler/fire-protection systems and associated fire-protection equipment; Complete electrical service and distribution, panelboards, branch circuitry, receptacles, equipment connections, interior and exterior lighting, emergency lighting, exit signage, grounding, lightning protection and associated controls; Fire alarm and life-safety systems; Telecommunications pathways, cabling infrastructure, MDF/IDF infrastructure and equipment connections; Access-control infrastructure, card readers, electric locking interfaces, door contacts, request-to-exit devices and associated security systems; Interior and exterior CCTV infrastructure and cameras as indicated; Mass-notification/paging infrastructure and associated speakers; Code Blue/emergency communication infrastructure where indicated; Digital signage and transit-message-board infrastructure where indicated; Audio/visual infrastructure for the Training Room, Conference Room and Meeting Room, including floor boxes, presentation connections and associated pathways as indicated in the Contract Documents; and All other architectural, structural, mechanical, electrical, plumbing, fire protection, technology, communications, and specialty work necessary for a complete Administration Building. The drawings specifically identify technology provisions for access control, CCTV, mass notification/paging, Code Blue stations, digital signage, training/conference/meeting-room AV systems, and presentation connections for spaces including Radio, Call Center, Accounting, Finance and management offices. Certain AV equipment is identified for coordination with the Owner/Owner’s vendor; the Contractor shall provide the infrastructure and work assigned to the Contractor by the Contract Documents and coordinate all Owner-furnished systems. The Contractor shall provide all work necessary to deliver a complete, code-compliant, fully tested, balanced, commissioned and operational Administration Building, including equipment start-up, controls integration, system testing, inspections, demonstrations, Owner training, warranties, operation and maintenance manuals, record documents, closeout documentation and final acceptance in accordance with the Contract Documents. Liquidated Damages will be calculated based on bid amount and FDOT Liquidated Damages 26-27 in the attachments. See Construction Terms for time for completion per lot. Lot 2: Maintenance Building - Scope of Work The Work associated with the Maintenance Building consists of furnishing all labor, supervision, materials, equipment, tools, transportation, permits, testing, inspections, coordination, and incidentals necessary to construct the new Vehicle Maintenance Building for the Escambia County Area Transit Facility at 20 Clarinda Lane, Pensacola, Florida. The Project includes, but is not limited to, complete construction of a transit-vehicle maintenance and service facility containing heavy bus-maintenance bays, small-vehicle service bays, parts and equipment storage, specialty maintenance rooms, fluid distribution systems, employee support areas, offices and mezzanine storage, together with all architectural, structural, mechanical, electrical, plumbing, fire protection, technology and specialty systems necessary for a complete vehicle-maintenance operation. The facility shall include, at a minimum: Seven (7) bus maintenance bays under the Base Bid configuration; Eight (8) small-vehicle service bays under the Base Bid configuration Tire Storage; Maintenance Supervisor office; Maintenance Manager office; Facility Manager office; Inventory Manager office; Parts Room and Parts Counter; Company Tool storage; Personal Tool storage; Mechanical/Facility Storage; Tire Storage; Fluid Storage/Compressor Room; Clean Room; Battery Storage room; Breakroom; Men’s and women’s locker/restroom facilities; IT room; Janitor space; Mechanical yard; Vestibules, corridors and supporting circulation; Mezzanine storage; Receiving/service functions and associated overhead doors; Heavy-duty and small-vehicle service-bay doors; Structural foundations, slabs, masonry, structural steel and roof framing; Mezzanine framing and concrete-on-metal-deck construction; Special rated construction around hazardous areas, including Battery Storage; Exterior wall, roof, flashing and drainage systems; Interior partitions, ceilings and finishes appropriate to office, employee and industrial/service areas; Vehicle-maintenance equipment infrastructure and utility connections; Compressed-air distribution and hose-reel systems; Motor oil distribution; Gear-oil distribution; Transmission-fluid distribution; Antifreeze distribution; Grease and water reels where indicated; Waste-oil and waste-antifreeze collection/distribution infrastructure as indicated; Specialty service hose reels mounted from the pre-engineered metal-building framing; Emergency eyewash/wash stations; Domestic water, sanitary, waste, vent and plumbing-fixture systems; Floor drains, trench/service drainage and associated oil/service-area drainage provisions where indicated; Mechanical ventilation and vehicle/service-area exhaust systems; HVAC systems serving offices, locker rooms, support areas and specialty spaces; Building automation and mechanical controls; Complete automatic fire-sprinkler system; Fire-alarm and life-safety systems; Electrical service and distribution; Equipment connections for maintenance equipment, compressors, bay equipment, overhead doors and specialty systems; High-bay lighting for maintenance/service spaces; Office/support-area lighting and controls; Emergency lighting and exit signage; Grounding and lightning protection; Telecommunications and data infrastructure, including service provisions for maintenance operations; Access-control, CCTV, intercom, paging and security infrastructure as indicated; Technology systems and equipment pathways; All supports, hangers, curbs, pads, sleeves, penetrations, access provisions and coordination required for equipment installation; and All other architectural, structural, mechanical, electrical, plumbing, fire-protection, technology and specialty systems necessary for a complete and fully operational vehicle-maintenance facility. The project specifically identifies Maintenance Supervisor, Maintenance Manager, Facility Manager and Inventory Manager offices; Parts Room and Parts Counter; locker/restrooms; Breakroom; IT; Fluid Storage/Compressors; Tire Storage; Clean Room; Battery Storage; Personal Tool Storage; Company Tools; Mechanical/Facility Storage; seven bus bays and eight small-vehicle bays. The Maintenance Building contains multiple occupancy/use conditions associated with the maintenance operation. The drawings classify Battery Storage as H-2 high hazard; the bus garage, small-vehicle garage, fluid-storage/compressor room and tire storage as S-1; open shop/parts/delivery/mezzanine areas as S-2; and the entry, breakroom and locker areas as Business occupancy. The building is one story with a mezzanine and is protected by an automatic sprinkler system and fire-alarm system. Specialty fluid-service infrastructure shall include the hose-reel systems indicated for the maintenance bays. The drawings identify motor oil, gear oil, transmission fluid, antifreeze, compressed air, water and grease services at various maintenance locations, with hose reels supported from the pre-engineered metal-building bents. The Base Bid includes seven bus bays and eight small-vehicle bays. The Contract Documents also identify a deductive alternate reducing the bus-bay area to five bays and the small-vehicle area to six bays; if accepted, the affected exterior construction is to accommodate the conditions shown for future expansion. The Contractor shall provide all work necessary to deliver a complete, code-compliant, fully tested, balanced, commissioned and operational Maintenance Building, including coordination and start-up of specialty maintenance systems, testing of MEP and life-safety systems, controls integration, inspections, Owner demonstrations and training, warranties, O&M manuals, record drawings, closeout documentation and final acceptance. Liquidated Damages will be calculated based on bid amount and FDOT Liquidated Damages 26-27 in the attachments. Please see Construction Terms for completion time per lot. Lot 3: Passenger Terminal Transfer Center - Scope of Work The Work associated with the Transfer Building / Transfer Center consists of furnishing all labor, supervision, materials, equipment, tools, transportation, permits, testing, inspections, coordination, and incidentals necessary to complete construction of the new Escambia County Area Transit Transfer Center at 20 Clarinda Lane, Pensacola, Florida, in accordance with the Contract Documents. The Project includes, but is not limited to, construction of the passenger transfer facility, customer-service/ticketing building, public restroom facilities, passenger waiting areas and associated covered canopies, together with all architectural, structural, mechanical, electrical, plumbing, technology, security and life-safety systems required for a complete transit facility. The drawings identify the outdoor passenger waiting area as an S-2 use and the enclosed administrative/customer-service functions as Business occupancy. The facility shall include, at a minimum: Customer Service area and ticketing/service functions; Customer-service office; Secure safe area; Public-facing ticket/transaction windows and associated counters; Impact- and ballistic-resistant exterior transaction-window assemblies as indicated; Men’s and women’s public restrooms; Vestibule and controlled public/staff entrances; Breakroom and employee support areas; Men’s and women’s public restrooms; ADA toilet facilities; Janitor/service rooms; Mechanical/IT room and dedicated HVAC/support areas; Public passenger waiting areas; Covered passenger-loading and waiting canopies; Structural canopy framing, columns, foundations and associated roof construction; Roof systems, roof drainage, gutters and downspouts; Exterior wall systems, impact-resistant storefront/glazing, exterior doors and associated weather-resistant construction; Interior partitions, finishes, ceilings, casework, counters and toilet accessories; Structural foundations, slabs, masonry and structural-steel framing; Complete HVAC systems serving enclosed occupied and support spaces; Domestic water, sanitary waste and vent piping, plumbing fixtures, water heating, floor drains, backflow protection and associated plumbing specialties; Electrical service and distribution, lighting, receptacles, equipment connections and controls; Extensive canopy lighting and exterior passenger-area lighting; Emergency lighting and exit signage; Grounding and lightning-protection systems serving the building and canopies; Fire alarm and life-safety systems; Telecommunications and network infrastructure; Wireless access-point infrastructure; Security/access-control systems and associated door hardware interfaces; CCTV/security-camera infrastructure; Paging, mass-notification and passenger-information infrastructure where indicated; Intercom and emergency communication systems where indicated; and All associated architectural, structural, mechanical, electrical, plumbing, technology and specialty systems necessary to provide a complete and operational transit transfer facility. The drawings specifically identify Customer Service, Safe, Customer Service Office, Break Room, Mechanical/IT, ADA toilets, public men’s and women’s restrooms, janitor and HVAC spaces. The facility also incorporates substantial covered passenger areas; the roof plan identifies multiple canopy sections and associated roof drainage systems. Exterior ticket windows shall include the complete transaction-window assemblies required by the Contract Documents, including framing, glazing, transaction hardware and accessories. The drawings call for impact-resistant construction and UL 752 Level 3 ballistic resistance at the specified ticket windows. The Contractor shall provide all work necessary to deliver a complete, accessible, code-compliant, fully tested, commissioned and operational Transfer Center, including start-up, testing, controls verification, inspections, Owner training, warranties, operation and maintenance manuals, record documents, closeout documentation and final acceptance. Liquidated Damages will be calculated based on bid amount and FDOT Liquidated Damages 26-27 in the attachments. Please see Construction Terms for completion time per lot. Lot 4: Bus Wash - Scope of Work The Work associated with the Bus Wash consists of furnishing all labor, supervision, materials, equipment, tools, transportation, permits, testing, inspections, coordination, and incidentals necessary to construct the new Bus Wash facility for the Escambia County Area Transit Facility at 100 Clarinda Lane, Pensacola, Florida. The Project includes, but is not limited to, construction of the enclosed bus-wash building, associated equipment/support areas, fare-processing functions, vacuum facility, staff restroom and all infrastructure necessary to support the Owner’s bus-washing and vehicle-cleaning operations. The project is new construction housing bus-wash equipment, a cash vault/fare-processing function and staff toilet room, together with a separate vacuum-station function. The facility shall include, at a minimum: Bus Wash Bay; Bus-wash equipment support and coordination; Equipment Room; Fare Processing room; Fare Entrance; Cash/fare-handling support infrastructure; Vacuum station/building; ADA staff restroom; Structural foundations, slabs, walls and roof framing; Concrete masonry construction and associated structural systems; Precast concrete roof construction where indicated; Exterior wall and roof assemblies; Doors, openings, louvers and related architectural components; Interior finishes and accessories appropriate to wet/service environments; Equipment housekeeping pads, curbs and supports; Wash-water supply and associated piping; Domestic cold-water and service-water piping; Sanitary waste and vent piping; Floor drains, floor sinks, cleanouts and drainage systems; Water-heating equipment; Water-softening equipment and associated connections where indicated; Plumbing fixtures and ADA restroom fixtures; Wash-equipment plumbing connections and coordination; Natural-gas service and distribution for heating equipment; Gas-fired radiant tube heaters serving the Wash Bay; Gas furnace and associated condensing unit; Equipment-room unit heater; Exhaust and ventilation systems; Mechanical controls and associated equipment; Electrical service and distribution; Dedicated wash-equipment power connections; Power for air compressor, water heater, water softener and other equipment; Interior, exterior and wash-bay lighting; Emergency lighting and exit signage; Grounding, bonding and lightning-protection systems; Technology/communications infrastructure and IT rack provisions; Security and monitoring infrastructure where indicated; Equipment-control interfaces and emergency controls; Site utility connections and coordination with the surrounding Wash/Fuel Station site work; and All architectural, structural, mechanical, electrical, plumbing, technology and specialty systems necessary to provide a complete and operational Bus Wash facility. The principal spaces are the Wash Bay, Equipment Room, ADA Restroom, Fare Processing, Fare Entrance, and the Vacuum. Mechanical systems include a gas furnace/condensing unit, an electric unit heater and two gas-fired radiant tube heaters serving the Wash Bay. The drawings specifically require coordination of mechanical equipment locations and clearances with the bus-wash equipment. Plumbing work shall be closely coordinated with the wash-equipment requirements and includes service/cold-water distribution, sanitary systems, floor drainage and equipment connections. Electrical work includes dedicated connections for the wash fa Source: OpenGov https://procurement.opengov.com/portal/escambiacountyfl/projects/313211 Canonical URL: https://govcontractfinder.com/contracts/cdbg-dr-hs004-new-escambia-county-area-transit-ecat-facility-opengov-3340-project-313211