CDBG Housing Rehab Harold Street State and local opportunity open City of Taylor, MI RFP-11-5-26-24 Posted: 2026-11-19T20:28:37.253Z Response deadline: 2026-12-07T22:00:00.000Z The City of Taylor, MI is requesting proposals for CDBG Housing Rehab Harold Street . Proposals are to be submitted electronically via the City's eProcurement Portal at https://procurement.opengov.com/portal/taylormi or physically to City of Taylor, City Clerk's Office, 23555 Goddard Road, Taylor MI 48180 PRIOR TO 5:00 pm on Monday, December 7, 2026 . Late proposals will not be accepted. Item Scope of Work Scope of Work 6304 Harold Street Taylor Michigan 6304 Harold Street, Taylor Michigan —Furnace and A/C, Roof Shingles and Crawlspace Insulation Wehaveinspectedthe house at 6304 Harold Street and recommend the removalandinstallation ofa new furnace with humidifier and condensate pump to matchor exceed existing BTUH outputandsize. (Approximately 45,000 BTU) Theexisting furnaceis on thefirst floor and is an up-flow furnace The existing furnaceis to be removed and replaced with a new 95% or better Energy Efficient furnace andinstalled to current code. The existing ductwork is to be cleaned and balanced once the new furnaceis installed to eliminate existing cold spots in the house. Remove and replace the existing Air Conditioning condenserwith a new 2 ton unit 13 SEER with matching case coil Reconnectall ductwork,electrical and gas piping as required per code RoofShingles: . The existing roofrequires complete removal and replacement with new 30 year dimensionalshingles, #15 underlayment, drip edge, ice shield and to include newbird proofvents and/or ridge vent to match existing venting type andall necessary flashing at stacks and vents,it is estimated that this will require 10-12 squares ofshingles to be measuredand verified by contractor. Replacementofany necessary roof sheathingis also to be included with 6 boards to be included in the base bid. Shingle color per owner. Crawlspace: Inspect andinstall minimum 60 mil vaporbarrier encapsulation system over entire crawlspace, walls and . floor. Install minimum R-15 insulation around perimeter walls and 24” horizontally into crawlspace floor area, insulate any exposed ductwork within the crawlspace. Quoteto includeall necessary Materials, Insurance, Labor, Taxes, Permits & Fees. All work is to meet local code inspection standards Instructions to Bidders Electronic Submissions (Preferred) The City of Taylor officially distributes bid documents through OpenGov at https://procurement.opengov.com/portal/taylormi . Bidders are encouraged to review solicitation documentation and electronically submit responses via the eProcurement Portal. A listing of open solicitations can be reviewed using the following URL: https://procurement.opengov.com/portal/taylormi . Submission by Mail or in Person Mail or deliver in Person a completed and signed solicitation response in a sealed envelope to the address listed below. Bid responses received after the date and time specified on the cover sheet of this solicitation will be rejected. Bid responses by mail or in person will need to include an electronic copy of the bid documents (e.g. on a flash drive) . Address the envelope containing your response in the following manner: BID NUMBER - RFP-11-5-26-24 CDBG Housing Rehab Harold Street BID OPENING DATE - Monday, December 7, 2026 CITY OF TAYLOR CITY CLERK’S OFFICE 23555 GODDARD ROAD TAYLOR, MI 48180 Bidder Checklist Have you remembered to: Review all instructions, terms, conditions, and specifications to ensure your bid response complies Prepare your price: products to be used and services to be rendered Indicate whether you can meet the delivery date indicated on the cover sheet Complete the “Cover Sheet” , sign and submit with bid package (for Submission by Mail or in Person) Complete the “Service Representative” information in the Vendor Questionnaire and submit with bid package Sign the “Insurance Requirements” document, submit with bid package Complete the “Project Specification” page, sign and submit with bid package Mark the envelope as indicated above? (for Submission by Mail or in Person) Include an electronic copy of bid document (for Submission by Mail or in Person) Included original “Bid Bond” , copy of original “Bid Bond” and self-addressed return envelope, as explained in Special Terms and Conditions (if applicable) Bidder’s Instructions Addition of Terms and Conditions . Additional terms and conditions submitted with a bid response are of no effect unless accepted in writing by the Purchasing Department. Bids with any additional terms and conditions may be rejected as non-responsive. Assistance to Bidders with a Disability . Bidders with a disability that need an accommodation must contact the Purchasing Agent prior to the deadline for receipt of bids so that reasonable accommodation can be made. Bid Held Firm. Bids are not awarded at the bid opening. Bid responses will be firm for 30 days, unless otherwise specified by the Purchasing Agent in writing. Bid Opening. All bids received by the time and date of the bid opening will be publicly opened by the City Clerks Office, with the attendance of the Purchasing Agent at the location indicated on the cover sheet of this solicitation. Interested parties are invited to attend the bid opening. Bid Results. Bid results will be posted to the City's eProcurement Portal at https://procurement.opengov.com/portal/taylormi . Bidders may also obtain bid results or arrange to review the bid file by contacting the Purchasing Department. Corrections. The bidder’s authorized representative must initial any corrections and alterations (i.e. erasures, whiteouts, correction tape, etc.) made to the bid response. Those bid responses with corrections and alterations that are not initialed are subject to confirmation by the Purchasing Agent. Bidders may unsubmit and modify their responses at any point prior to the submittal deadline. Definitions: Bidder Any person or firm submitting a competitive bid in response to a solicitation. Bid Results A summary of all bid responses received and the award results Bid Response The executed document submitted by a bidder in response to a solicitation. Contractor Any person or firm having a contract with a governmental body. Solicitation The process of notifying prospective bidders that the City wishes to receive bids for furnishing goods and services. Facsimile Bids. Bid responses faxed to the City will be rejected. Bids may be faxed to a third party who will put it in a properly-addressed envelope and deliver it to the Purchasing Department before the date and time specified in the solicitation. Late Bids. It is the bidder’s responsibility to ensure that a bid response is electronically delivered prior to the date and time specified for the opening. Late bid responses will not be accepted and will be rejected regardless of the degree of lateness or the reason. Multiple Bids. Bidders may not submit more than one bid in response to this solicitation. Each bid submitted must comply in all aspects with the bid requirements and these instructions. New Equipment and Materials. Unless otherwise indicated in the detailed specifications of this solicitation, all equipment and materials shall be new and under current production for use in the United States. Packaging . All commodities and equipment are to be delivered and packaged strongly and securely according to accepted commercial practices. Prices, Currency. All prices must be in United States currency, (USD). Pricing (Unit and Total Prices) . The unit price is to be according to the unit of measurement specified in the solicitation. In the event of mathematical differences between the unit price and extended total, the unit price will prevail. Prevailing Wages . If this project is determined to be subject to the Davis‑Bacon Act (40 U.S.C. 3141 et seq.), the Contractor shall comply with all applicable labor‑standards provisions in 29 CFR 5.5. The Contractor must pay all laborers and mechanics no less than the most current prevailing wages and fringe benefits published in the applicable U.S. Department of Labor Wage Determination, included as Attachment B. The Contractor shall submit weekly certified payrolls in accordance with 29 CFR 5.5(a General Contract Terms and Conditions Affirmative Action. The contractor will take affirmative action in complying with all Federal and State requirements concerning fair employment and employment of the handicapped, and concerning the treatment of all employees without regard to race, color, religion, sex, national origin or physical handicap. Applicable Law and Venue . This contract is governed by and construed in accordance with the laws of the State of Michigan. Any action to enforce this contract must be brought in the District Court of Wayne County, Michigan. Assignments and Subcontracts. The contractor may not assign or otherwise transfer or delegate any right or duty without the City’s express written consent. However, the contractor may enter into subcontracts provided that any such subcontractor acknowledges the binding nature of this contract and incorporates this contract, including any attachments. The contractor is solely responsible for the performance of any subcontractor. The contractor shall not have the authority to contract for or incur obligations on behalf of the City. Binding Contract. The acceptance of a bid response in writing by the Purchasing Department or Entity constitutes a contract between the bidder and the City. Written acceptance from the Purchasing Department or Entity will be in the form of a purchase order, notification of award, or contract. Any oral agreement or arrangement by a bidder with a City employee or Purchasing Department or Entity will have no force or effect unless reduced to writing. Compliance with Laws. The contractor must, in performance of work under this contract, fully comply with all applicable federal, state, or local laws, rules and regulations, including Title VI of the Civil Rights Act of 1964. Any subletting or subcontracting by the contractor subjects subcontractors to the same provision. Compliance With Public Records Law. The contractor understands that, except for disclosures prohibited under state open records laws related to confidentiality, in MCL §Act 442 of 1976 et seq. , the City must disclose to the public upon request any records it receives from contractor. The contractor further understands that any records which are obtained or generated by the contractor under this contract, except for records that are confidential under in MCL §Act 442 of 1976 et seq. , may, under certain circumstances, be open to the public upon request under the Taylor open records law. The contractor agrees to contact the City immediately upon receiving a request for information under the open records law and to comply with the City’s instructions on how to respond to the request. Bid responses are exempt records until the time and date of the bid opening. Confidentiality. The contractor agrees not to use or disclose any information it receives from the City under this contract that the City has previously identified as confidential or exempt from mandatory public disclosure except as necessary to carry out the purposes of this contract or as authorized in advance by the City. The City agrees not to disclose any information it receives from the contractor that has previously been identified as confidential and which the City determines in its sole discretion is protected from mandatory public disclosure under a specific exception to the State public records law, in MCL §Act 442 of 1976 et seq. . The duty of the City and the contractor to maintain confidentiality of information under this section continues beyond the term of this contract, or any extensions or renewals of it. Contract Amendment . After a binding contract has been entered into, no changes (i.e. substitution of product or a price adjustment) may be made, unless prior written approval has been obtained from the Purchasing Department or Entity. Inspection and investigations. The City reserves the right to conduct inspections and investigations related to the bidder and offered commodities or services, including but not limited to the firm, its facility, personnel, qualifications, and the commodities and/or services offered to make determinations regarding compliance with the bid requirements and responsibility of the bidder. Material and Workmanship. All material and workmanship shall be subject to inspection and testing by the City either at: the point of manufacturer, place of storage, or upon receipt. Payment Terms. Payment will normally be made within thirty days after delivery and acceptance of commodities or services under this contract and receipt of a correct invoice. The city issued purchase order number shall be the primary identification number utilized by the city in the tracking of orders and processing of payments. A vendor’s failure to comply with the following two actions could result in a delay of payment. (1) Vendors are required to visibly place the city issued purchase order number on the invoice, (2) Vendors are required to submit the invoice directly to Central Purchasing. Termination for lack of funding or authority. This contract shall become null and void, in total or in part, should the City Council of the City of Taylor fail to appropriate funds for any or all departments, which are committed to the terms of this contract. Any such contract termination shall be at no cost to the City. Termination of Contract a. Termination without Cause. This contract may be terminated by mutual consent of both parties, or by either party upon 30 days' written notice. b. Termination for Lack of Funding or Authority. The City may terminate this contract effective upon delivery of written notice to the contractor, or on any later date stated in the notice, under any of the following conditions: If funding from federal, state, county, city, or other sources is not obtained and continued at levels sufficient to allow for purchase of the services or supplies in the indicated quantities or term. The contract may be modified by agreement of the parties in writing to accommodate a Special Terms and Conditions Award/Evaluation. All proposals will be evaluated based on the below criteria by the project manager or designee. The City’s intent is to select the best possible service/product at the lowest economical cost and will be the sole judge of the proposal contents. The proposed fee for the project Proposer’s demonstrated experience with similar projects The quality and type of product proposed The thoroughness of material submitted, including proposed work plan Estimated installation date Any other considerations deemed pertinent to the City Award is based on All or None, but City reserves the right to award by line item based on budget. Bid Selection. The bid winner will be selected following the applicable process under Section 4.8.12, Bid Evaluation of the Purchasing Policy ( https://www.cityoftaylor.com/155/Purchasing#docaccess-9da064ed60697d472ca0882f174675bb4d9c3578aefe41bf9ec1c3a840e0403e ). Pre-Qualification. In Compliance with Section 3.4 of the City Purchasing Policy Manual, the requesting department may require the prequalification of vendors for the Formal Bid. The prequalification process may add up to four weeks. Bid Surety. Each bid response must include a five (5) percent bid surety for the total of the project, either in the form of: a certified check a bank cashier's check a money order a corporate surety bond from a surety company authorized to do business in the City of Taylor Each bid response must also include a copy of the original bid bond as well as a self-addressed return envelope. Bid sureties of the non-successful bidders that are in the form of a certified check, bank cashier’s check or a money order will be returned upon determination of award. The bid surety of the successful bidder(s) will be returned upon the receipt of a completed contract bond and its approval by the City. Bid Calculation: In the event that the bid is generated based on single unit price, the Bid Bond and Performance Bond will be defined by the Central Purchasing Department based on historical data. Contract Term The Contract shall be for a term of one (1) year from the date of execution, with no options for renewal or extension. Delivery. The contractor shall deliver commodities and services ordered under this contract as follows: Delivery must be made within 30 Days (unless noted otherwise in the Scope of Work) after the contractor receives an order from the Purchasing Department or entity by issuance of a purchase order or use of a purchasing card. If delivery requirements cannot be met within the specified time, the bidder must notify the Purchasing Department in writing of the delay and the approximate date delivery may be expected. F.O.B. Point and Freight. Delivery and passage of title under this contract shall be as follows: Delivery will be F.O.B. Destination to the location specified on the cover page of the solicitation. The freight is to be included in the price of the products. Title will pass to Purchasing Department or entity upon delivery to the specified destination. Descriptive Literature. The bidder’s response must include descriptive literature or detailed manufacturer’s specifications for the specific equipment or commodities being offered. Bidders are instructed to clearly mark the literature information that demonstrates compliance with the specification. Estimated Volume. Estimates are not to be considered as either a minimum or maximum, but rather an estimate based upon past and anticipated usage. The contractor or contractors will be required to furnish actual requirements upon receipt of an order. This contract will not include items of a similar nature, which must be bought for emergency use. Indemnification and Insurance Requirements. Bidders must review the attached Risk Management Appendix for indemnification and insurance requirements. The indemnification and insurance provisions are incorporated and made part of this solicitation and the resultant final contract. Objections to any of the provisions of the indemnification and insurance requirements must be made in writing to the attention of the Purchasing Agent by the time and date set for receipt of questions. No alteration of these provisions will be permitted without prior written approval from the Purchasing Department in consultation with the Taylor Risk Management Director. Upon receipt of the Notice of Award, the successful bidder must obtain the required insurance coverage and provide the Purchasing Agent with proof of coverage prior to contract approval. The coverage must be satisfactory to the Purchasing Department, in consultation with the Taylor Risk Management Director. A bidder’s failure to provide evidence of insurance coverage is a material breach and grounds for withdrawal of the award or termination of the contract. Please see ( Vendor Questionnaire ). Pricing. Pricing under this contract shall be as follows: Firm Fixed . The total bid price is to include all discounts and deductions, and is to be less federal and City taxes, for which exemption certificates will be furnished upon request. Pricing shall be firm for the period of the contract. Purchasing Cards. The Purchasing Department may place orders by issuance of a purchase order or may elect to place an order and make payment using a purchasing card. The contractor will accept a purchasing card without passing the processing fees for the purchase card back to the Purchasing Department or Entity. Record of Sales. The contractor must maintain records of sales under the contract and furnish volume of sales information to the Purchasing Department within thirty (30) days upon written request o Source: OpenGov https://procurement.opengov.com/portal/taylormi/projects/323887 Canonical URL: https://govcontractfinder.com/contracts/cdbg-housing-rehab-harold-street-opengov-19176734-project-323887