Central Plant Recycling with Pug Mill Paving Operations State and local opportunity open County of Wayne, NY BB27021 Posted: 2026-11-18T20:23:36.019Z Response deadline: 2027-01-07T18:00:00.000Z The County of Wayne, NY is soliciting sealed responses for Central Plant Recycling with Pug Mill Paving Operations . Responses are due , on or before 1:00 pm prevailing time on Thursday, January 7, 2027 . Late responses will not be accepted. Central Plant Recycling with Pug Mill Paving Operations Under 10,000 SY @ 3 inch depth Under 10,000 SY @ 4 inch depth Over 10,000 SY @ 3 inch depth Over 10,000 SY @ 4 inch depth Pavement Recycling with HFRA Cold Mix Bituminous Paver Add-On Costs If Desired by Contracting Agency Pneumatic Rubber Tire Roller w/ Operator 10 Drum Steel Pavement Roller w/ Operator Articulated Loaders w/ Operator for Pug Mill Operation Maintenance & Protection of Traffic (MP&T) (Up to 4 Flaggers) MP&T each additional flagger Project Details / Scope of Work General Description This work shall consist of recycling of existing bituminous pavements using high float emulsified rejuvenating agent (HFRA) with reclaimed asphalt pavement (RAP). Under this item the contractor will provide all necessary labor and equipment to grind the existing pavement and to load the grindings into County supplied trucks. In addition, the contractor shall provide all equipment and labor required to; recycle the existing bituminous pavement at a central mixing plant location, place the recycled material through as approved paver. Bituminous Materials The high float rejuvenating agent HFRA shall meet the requirements of the following material designation shall conform to the following requirements: Emulsion Properties Sieve Test, % 0.10 Max Storage Stability, 1 day, % 1.0 Max Stone Coating, Pass - See Note # 1 &2 Distillation Oil Distillate, by Volume of Emulsion, % 0-5 Residue from Distillation, % 65 Test on Residue from Distillation Penetration, 25°C (77°F), 100g, 5 sec 200+ Float Test @ 60°C (140°F), Sec (see note #3) 1200+ Solubility in Trichloroethylene, % 97.5+ Flash Point, COC, °F 350° Minimum Saturates, % Max 20% Max NOTE #1 - ASTM Method D244 except that the mixture of stone and asphalt emulsion shall be capable of being mixed vigorously for 5 minutes, at the end of which period the stone shall be thoroughly and uniformly coated. The mixture shall then be completely immersed in tap water and the water poured off. The stone shall then be not less than 90% coated. NOTE #2 - ASTM Method D244 except that the mixture of stone and asphalt emulsion shall be mixed vigorously for 5 minutes, then allowed to stand for 3 hours, after which the mixture shall be capable of being mixed an additional 5 minutes. The mixture shall then be rinsed twice with approximately its own volume of tap water without showing appreciable loss in bituminous film. After the second mixing, the aggregate shall be at least 90% coated. NOTE #3 - Float Test ASTM Method D-139 except that the residue from distillation shall be poured immediately into the float collar at 500°F. and not through a No. 50 sieve; or if the residue had been allowed to cool, it shall again be heated to 500°F. and poured into a collar. The water bath shall be maintained at the specified test temperature + 1°F. Additional Requirements - To rejuvenate aged asphalt having a penetration between 10-20 to a penetration of 60 or more, the solids from the HFRA shall not exceed 30% by weight of the aged asphalt. Composition of Completed Recycled Asphalt Mixture Type II Mixture screen sizes General Limits % passing 2” 100 1” 90-100 ½” 60-90 ¼” 38-74 1/8” 25-62 80 4-16 200 2-8 Bituminous Material % of residual bitumen (2) 4.5-7.0 Note #1 - Aggregate percentages are based on total weight of aggregate Note #2 - The bitumen content is based on the total weight of the mix, exclusive of water or oil distillate. Abson Recovery Method Test on Completed Recycled Asphalt Mix Test Minimum Maximum Penetration, 77°F, 100g, 5 sec 60 200 Solubility in trichloroethylene, % 99.0 - Ductility, 60°F, 5 cm/min, cm 40 - Flash Point, °F 350 - Loss on Heating, % - 1.5 Aggregate The mineral aggregate shall conform to the requirements set out in the following reference subsections in the NYSDOT Standard Specifications: Fine Aggregate 703.01 Coarse Aggregate 703.02 Grinding/Milling The equipment for grinding and profiling pavement surface shall be a power operated, planing machine or grinder capable of removing, in one pass, a thickness of asphaltic concrete necessary to provide profile, cross slope, and desired texture uniformly across the entire pavement surface up to 7 inches in one pass. Minimum drum cutting width shall be 6 feet 3 inches. The equipment shall be self-propelled with sufficient power, traction, and stability to maintain accurate depth of cut and slope. The cutting drum shall have bi-directional cutting capability in order to control chunk size meeting the following gradation: Chunk Size Gradation Sieve Size Percent Passing 3" 100 2" 95-100 #200 0-12 In addition, the machine shall be so designed that the drum is capable of cutting with a zero side clearance on at least one side. The reclaimed material will be discharged to the rear of the machine onto a 24" pick-up conveyor belt. This conveyor will transfer material to a minimum 24" wide truck loading conveyor into County owned trucks. The loose material resulting from the operation shall remain the property of the County. The grindings will not be stockpiled higher than 10 feet. The equipment shall be capable of accurately establishing profile grades along each edge of the machine (within + 1/8") by referencing from the existing pavement by means of a ski or matching shoe or from an independent grade control and shall be controlled by an automatic system for controlling grade elevation and cross slope at a given rate. The machine shall be equipped with means to control dust and other particulate matter created by the cutting action. The speed of the machine shall be variable in order to leave the desired grid pattern surface texture. Determination of the type carbide milling teeth shall be the sole discretion of the using agency if the intended milling is to be used as a serviceable riding texture for an indeterminate time. The Pavement surface shall be removed to the depth, width, grade and cross section as directed by the Associate Engineer - Highways. The Associate Engineer - Highways may require that the pavement planing operations be referenced from an independent grade control in those areas where he deems this type of control to be appropriate. For this type of operation, the independent grade control shall be established and maintained by the contractor in a manner acceptable to the Associate Engineer - Highways. In the event the entire pavement width along a section of highway has not been planed to a flush surface by the end of a work period, resulting in a vertical or near vertical longitudinal face exceeding 1 1/4" in height, this longitudinal face shall be sloped in a manner acceptable to the Associate Engineer - Highways as not to create a hazard to traffic using the facility during periods when construction is not in progress. Transverse faces that are present at the end of a working period will be tapered in the manner approved by the Associate Engineer - Highways to avoid creating a hazard for traffic. Mixing Reference subsection 405-3.02 equipment to be used for mixing. Mixing shall be done with a rotating twin paddle shaft pugmill providing suitable pressure-kneading action in mixing. Mixing by blading, shoveling and/or scooping will not be permitted. The mixer shall be either a continuous traveling type, central continuous or batch type pugmill designed to accurately proportion either by volume or by weight, so that when the aggregate and bituminous materials are incorporated in the mix, a thorough and uniform coating will result. The mixer shall be equipped to mechanically or electrically interlock the bituminous feed with the aggregate feed such that uniformity of the mixture is assured at all times. The pugmill mixer(central type), shall be provided with weighing, volumetric or other gauging equipment which shall be capable of providing accurate control at all times of the amount of aggregate entering the mixer per time interval. The mixer shall be equipped with a positive displacement metering system capable of totalizing the quantity of bituminous material applied to the mixing chamber. The aggregate feed system must contain a minimum of 2 compartments or bins; each compartment or bin shall have adjustable feed gates so that the RAP material and virgin aggregate, if needed, can be proportioned at the specified rate. The capacities of the cold feed bins shall be sufficient to maintain a continuous flow of material. Each bin shall have a mechanical device for uniform feed of the aggregate. The mixer shall be approved by the Associate Engineer - Highways or his representative prior to commencing any work. Paving Bidder shall bid rental rate for Barber-Greene SB-140 (or equal) equipped with automatic transverse slope and longitudinal grade screed controls which will be used in spreading the RAP. The County will load and haul RAP from mixing site to paver. The County will be responsible for compacting. County Highway Department Responsibilities Purchase, deliver, stockpile an aggregate, if required. Provide maintenance and protection of traffic. Supply sufficient trucks to haul RAP or recycled material. Furnish suitable stockpile area with adequate room for mixing and stockpiling. . Supply water. Shoulder Backup Cut Rebates for paving operations Please note that for other agencies utilizing this bid, Responsibilities will be negotiated between the the end user and the awarded vendor Design, Certification, and Demonstration Prior to commencing any mixing work, the successful bidder shall sample the recycled asphalt pavement (RAP) to be used on the project. The RAP material shall then be extracted by standard ASTM methods and as a minimum, the following shall be determined: Percent of asphalt residue in RAP. Penetration of aged asphalt in RAP. Sieve analysis of aggregate in RAP. Percent of HFRA needed to be added to bring the aged asphalt in RAP to desired penetration. After analyzing the RAP material, the supplier shall then submit a certified recommended job mix formula to the Associate Engineer - Highways. The recommended job mix should include the following as a minimum: Complete analysis of RAP material. Percent of RAP material to be used. Percent of virgin aggregate and sizes to be added, if any. Combined aggregate gradation. Percent of asphalt residue in finished mix. Percent of HFRA to be added. Type and percentage of standard emulsion to be blended with HFRA, if any. Target or design penetration of finished mix. Test on residue from Abson Recovery of Completed Recycled Asphalt Mix (RAM) as required in Composition of Completed Recycled mixtures section. Acceptance of the formula by the Associate Engineer - Highways is solely for the purpose of quality control, and in no way releases the contractor from his responsibilities. Either during or immediately after construction, the contractor shall provide complete certified test analysis of all job mix formula parameters on the completed cold recycled mixture as directed by the Associate Engineer - Highways. Contractor's Qualifications Contractor shall have access to a complete and permanently operating manufacturing plant with facilities located within a reasonable delivery distance to the job site. Operator of plant facilities shall have a minimum of 2 years experience in the production of the type of material specified to insure proper mixtures and satisfactory service. The vendor at the time of bidding shall own the equipment with which he intends to complete the contract, if so awarded. The Contractor shall be prepared, upon 12 hours prior notice, to load all required high float rejuvenating agent (HFRA) at temperatures requested by the Associate Engineer - Highways for the specific job. The bidder shall own, operate and maintain a working laboratory at his plant. The laboratory shall be equipped with all equipment necessary to perform all specified tests on the HFRA sample and recycled asphalt pavement (RAP) material. The laboratory shall be operated by a full time qualified technician and shall be available for use by any County personnel. In addition, the laboratory shall also include sufficient equipment to test aggregates and mixes required by NYSDOT materials method #5. The County, may at any time, have samples tested by a certified independent testing laboratory. The Contractor will supply with the bid, documentation showing that he has manufactured and supplied any non-NYSDOT specification items on 4 successful projects in the previous 2 years. This documentation will show name, location, and quantities plus date of completion and person to contact for verification. Any bid on non NYSDOT specification items which is not documented as above, will be considered unresponsive to this specification and will be rejected. Maintenance and Protection of Traffic The County shall perform all Maintenance and Protection of Traffic Please note that for other agencies utilizing this bid, Responsibilities will be negotiated between the the end user and the awarded vendor Basis of Bid The price bid per square yard shall include all labor and equipment for cold milling various county highways in accordance with the attached specifications loaded on county trucks. The price bid per gallon shall include HFRA and a rotating twin shaft central plant pugmill in accordance with the attached specifications supplied with all testing, labor, fuel and necessary supplied. In addition, a price per day is solicited for a bituminous paver for placing the mix. The price bid shall include delivery, two operators, fuel, and all necessary supplies. The paver shall be of the Barber-Greene SB-140 or equal equipped with automatic transverse slope and longitudinal grade screed controls. Asphalt Price Adjustment The unit prices per gallon of liquid bituminous asphalt emulsions material purchased from any award based on this specification will be subject to adjustment based on the following formula: Price Adjustment Per Gallon = New Monthly Average (per English Ton) - Base Average Terminal Price X Total Allowable Asphalt & Fuel Allowance 235 Price adjustments allowed will be based on the November 1, 2026 average of the F.O.B. terminal price per English ton of unmodified PG 64S-22 binder without anti-striping agent (base average F.O.B. terminal price). The new monthly average terminal price will be determined by the New York State Department of Transportation based on prices of pre-approved primary sources of performance graded binder in accordance with the New York State Department of Transportation Standard Specification. NEW MONTHLY AVERAGE F.O.B. TERMINAL PRICE : The average F.O.B. terminal price for unmodified PG 64-22 binder without anti-stripping agent as determined by the New York State Department of Transportation per New York State Department of Transportation Standard Specification. BASE AVERAGE F.O.B. TERMINAL PRICE : The average F.O.B. terminal price of unmodified PG 64-22 binder without anti-stripping agent as determined by the New York State Department of Transportation. The November 1, 2026 average is $803.00 Total % Asphalt Plus Fuel by Material Type The Percentage of total allowable asphalt and fuel for each item is as follows: Item % Asphalt Fuel Allowance Total Asphalt & Fuel Allowance Type MC1 Binder Course 5.75 1 6.75 6.3 mm F2 Polymer Modified 6.7 1 7.7 Flexible Overlay (Smooth Seal) 7 1 8 Flexible Top 6.2 1 7.2 True & Leveling F9, Superpave HMA, (All ESAL) ** 1 *** % Shim Course F9, Superpave HMA, (All ESAL) 8.25 1 9.25 Top Course 9.5 mm F2 Superpave HMA, (All ESAL) 6.2 1 7.2 Top Course 12.5 mm F2 Superpave HMA, (All ESAL) 5.5 1 6.5 Binder Course 19 mm F9 Superpave HMA, (All ESAL) 4.9 1 5.9 Binder Course 25 mm F9 Superpave HMA, (All ESAL) 4.5 1 5.5 Base Course 37.5 mm F9 Superpave HMA, ( 3 M ESAL’s) 4.0 1 5.0 Paver placed surface treatment ‘Novachip’ 7.00 0 7.00 % Asphalt Emulsions CMS-2 65 12.2 77.2 % CRS-2 65 3.2 68.2 % CRS-2p 65 3.2 68.2 % CSS-1 57 0.2 57.2 % CSS-1h 57 0.2 57.2 % RS-2 63 3.2 66.2 % RS-2p 63 3.2 66.2 % HFRA 65 5 70% HFMS-2 65 10.2 75.2 % HFMS-2gh 75 3 78 % HFMS-2h 65 3.2 68.2 % HFRS-2 63 3.2 66.2 % HFRS-2p 63 3.2 66.2 % HFMS-2h Tack coat 40 0.2 40.2 % RS-1h (Rapid breaking tack) 55 0.2 55.2 % CSS-1h Tack Coat 57 0.2 57.2 % PG 64-22 (AC-20 w/ fiber crack fill) 95 0 95 % 18-64 100 0 100 % Polymer Crack fill (ASTM D6690) 56 0 56 % MC 30 100 2 102% DEC 50 25 25 50% ** The conversion factor will be computed separately using the conversion factors for the individual mixture used EXAMPLE: Item HFRA Emulsion Base Average Price = $400.00 New Average Price = $500.00 Total % Asphalt plus Fuel = 70% $500.00 - $400.00 X 0.70 = +$0.298 per English Gallon 235 *Fuel Allowance represents allowance for energy (fuel, electricity, natural gas) used in the production of asphalt. It is a cost associated with the product and not intended to represent any trucking or hauling of product. NOTE: All materials with identical numbers preceding the decimal and identical first and second number after the decimal receive the price adjustment shown for the base material. Positive Price Adjustment number shall be added to original bid price per English ton. Negative Price Adjustment number shall be subtracted from original bid price per English ton. Price adjustments allowed by this contract shall be calculated and applied to the original prices. All price adjustments will be computed to three decimal places. Should these provisions result in a price structure which becomes unworkable, detrimental or injurious to the State or in prices which are not truly reflective of market conditions or which are deemed by the Commissioner to be unreasonable or excessive, and no adjustment in price is mutually agreeable, the Commissioner reserves the sole right upon ten days written notice mailed to the contractor to terminate any contract resulting from this bid opening. Price adjustment shall be published by the State and issued to all contract holders, whose responsibility will be to attach the appropriate state notification (based on when the work was performed) to the payment invoice submitted to agency. Work performed after the expiration of the contract, where no extension has been granted, resultant from purchase orders placed prior to expiration of the contract will receive the price adjustments in effect the last month of the contract. Price adjustment for any contracts that are extended will be based on the new average for the month in which the work is done applying the same base established for that contract. Notice Notice to Contractors (Physical Responses Only) Notice is hereby given that the County of Wayne is conducting a Request for Bids for Central Plant Recycling with Pug Mill Paving Operations Sealed responses may be submitted physically or by mail in a sealed envelope clearly identified and filed with the Superintendent of Public Works, 7227 Route 31, Lyons, New York 14489, 26 Church Street, Lyons, New York 14489, on or before 1:00 pm prevailing time on Thursday, January 7, 2027 An electronic copy of proposal forms, specifications, and plans can be obtained from the County’s eProcurement Portal: https://procurement.opengov.com/portal/co-wayne-ny-us or by requesting them directly from the Purchasing Department Office located at 16 William Street, Lyons, NY by email request to purchasing@co.wayne.ny.us (Telephone: 315-946-7675) The County of Wayne (hereinafter “County”) shall not be held responsible for the completeness or accuracy of any proposal documents received by a contractor that was not directly issued to that contractor by the Purchasing Department. Any cont Source: OpenGov https://procurement.opengov.com/portal/co-wayne-ny-us/projects/326484 Canonical URL: https://govcontractfinder.com/contracts/central-plant-recycling-with-pug-mill-paving-operations-opengov-1899614489-project-326484