Certified Arborist Services for Twin Lakes Pump Station Pipeline Project State and local opportunity open Las Virgenes Municipal Water District, CA 2026-RFP-053 Posted: 2026-11-06T01:15:01.172Z Response deadline: 2026-12-04T23:00:00.000Z The Las Virgenes Municipal Water District is seeking Proposals for Certified Arborist Services for Twin Lakes Pump Station Pipeline Project . Proposals are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/lvmwd , no later than 3:00 pm on Friday, December 4, 2026 . SCOPE OF SERVICES A general outline of the scope of work is provided below. It is the District’s expectation that the proposer uses their expertise to customize the scope of work below, as appropriate, to meet the project objectives in a cost-effective manner. Proposers may identify additional tasks as needed to meet the project objectives or may offer optional tasks as appropriate. Task 1 - Review and Update Protected Tree Report The Consultant shall review available project information, including the existing Protected Tree Report, current construction plans, City tree protection requirements, the project Notice of Exemption, and other relevant information provided by the District. The Consultant shall conduct a field investigation to: Verify and update the trees identified in the 2019 Protected Tree Report; Identify and document additional trees whose Tree Protection Zone (TPZ) and/or dripline extends into the project construction or easement limits; Update pertinent tree information, including species, size, condition, photographs, and other information necessary to evaluate potential construction impacts; Identify material changes or discrepancies between the existing report, current site conditions, current design, and applicable project requirements; Establish or update appropriate TPZs and recommended tree protection measures; and Evaluate locations where construction activities may require special tree protection measures or arborist monitoring. The Consultant shall prepare an updated Protected Tree Report incorporating the results of the evaluation and recommended measures for protection of affected trees. Task 2 - Preconstruction Arborist Services Prior to construction affecting protected trees, the Consultant shall provide appropriate preconstruction arborist services, including: Participate in applicable preconstruction coordination with the District, its construction management/inspection personnel, the Contractor, and City representatives; Review relevant construction access, staging, excavation, and work areas for consistency with tree protection requirements; Observe or verify installation of required tree protection measures and fencing; Document preconstruction conditions of affected trees; and Identify construction activities for which arborist presence or monitoring will be necessary. The Consultant shall advise the District of recommended modifications to tree protection measures based on field conditions. Task 3 - Construction Monitoring The Consultant shall provide monitoring arborist services during construction, including observation of compliance with established tree protection measures and evaluation of construction conditions that may affect protected trees. Arborist monitoring may include observation during the following construction activities, as applicable: Excavation, trenching, or other ground disturbance within designated TPZs; Hand excavation, air-spade excavation, or similar tree/root protection activities; Exposure, damage, pruning, or treatment of tree roots; and Tree or branch pruning required to facilitate construction. The City tree protection specifications require monitoring of authorized construction activity within TPZs and contemplate special excavation methods where conventional methods could cause prohibited root damage. The Consultant shall document significant observations and recommendations and promptly notify the District of activities or conditions that may result in tree damage. Following construction, the Consultant shall perform a general post-construction assessment of affected trees and document significant construction-related impacts or recommended follow-up measures. Task 4 - Mitigation Planting Observation and Documentation The Consultant shall provide arborist services associated with installation of the eight 24-inch box Coast Live Oak mitigation trees required by the project's Notice of Exemption. Services shall generally include: Coordination with the District and City regarding mitigation planting; Observation and documentation of mitigation trees and planting activities; Verification of species, quantity, size, planting locations, and general condition; Identification of observable deficiencies and recommendations for corrective action; and Establishment of baseline photographic and condition documentation for subsequent monitoring. Task 5 - Three-Year Mitigation Tree Monitoring The Consultant shall monitor the mitigation trees for the required three-year survivability period. Monitoring shall generally include: Evaluation of tree survival and condition; Identification of observable irrigation, maintenance, pest, disease, damage, or establishment concerns; Photographic documentation; Recommendations for corrective action, when appropriate; Documentation and recommendations regarding dead or failing mitigation trees; and Preparation of monitoring documentation and a final closeout report. Deliverables At a minimum, anticipated deliverables include: Updated Protected Tree Report, including updated figures or exhibits as appropriate; Preconstruction tree condition/protection documentation; Construction monitoring documentation appropriate to the nature and frequency of arborist involvement; Post-construction assessment of affected trees; Mitigation planting baseline documentation; Three-year mitigation monitoring documentation; and Final mitigation monitoring/closeout report. Consultants may recommend consolidating or modifying these deliverables where doing so would provide a more efficient or effective means of meeting the project objectives. INTRODUCTION General Information The Las Virgenes Municipal Water District (District) serves the western edge of Los Angeles County including the cities of Agoura Hills, Calabasas, Hidden Hills and Westlake Village. The District occupies 122 square miles and services a population of approximately 70,000. The District provides potable water, recycled water, and sanitation (wastewater) services to its customers through three separate enterprise funds. The sanitation and recycled water services are provided through a Joint Powers Authority with the Triunfo Sanitation District. Las Virgenes Municipal Water District is organized under the Municipal Water District Act of 1911 (California Water Code 7100). A five-member board of directors, each elected by geographic divisions, provides governance. Directors serve overlapping four-year terms, and every two years - concurrent with installation of the newly elected board – they select board officers. The board also selects a local representative from LVMWD to serve on the Board of Directors of the Metropolitan Water District of Southern California. The District is requesting proposals from qualified firms to provide Tree Report updates, monitoring arborist services during construction, and mitigation planting monitoring for the construction of a new 16-inch water transmission pipeline in the Chatsworth area of the City of Los Angeles. . To be considered, the proposal must be received electronically, through the Procurement Portal by 3:00 pm on Friday, December 4, 2026 . Proposals received after the above date and time will not be considered. Submitters will receive an email confirmation of receipt of the proposal. The District is not responsible for emails that fail to deliver regardless of the cause of the failure. Email confirmations will be sent when proposals are received. Background The Las Virgenes Municipal Water District (District) is preparing to construct the Twin Lakes Pump Station Pipeline Project in the Chatsworth area of the City of Los Angeles. The project generally consists of construction of a new 16-inch water transmission pipeline and associated improvements. Portions of the project are located within or adjacent to areas containing trees subject to City of Los Angeles tree protection requirements (including areas located within Chatsworth Park). A Protected Tree Report was prepared for the project in July 2019 and identified trees potentially affected by construction and recommended measures for their protection. The Protected Tree Report identified 56 trees (including but not limited to coast live oaks, California sycamores, Canary Island Pines, and other species) and recommended arborist monitoring for certain work within or near protected-tree driplines. Due to the time that has passed, the District is seeking a certified arborist to update the Protected Tree Report to reflect current conditions and provide updated recommendations prior to construction. Construction is currently anticipated to have a duration of approximately 280 calendar days from the construction Notice to Proceed. The City-approved Notice of Exemption identifies removal of Coast Live Oak Trees 352 and 355 and requires planting of eight 24-inch box Coast Live Oaks (Quercus agrifolia), which must be bonded for survivability for three years. The District seeks services from a qualified arborist to: Update the existing Protected Tree Report based on current site conditions and the current project design, including providing updated tree protection recommendations for inclusion in the Construction contract documents; Provide arborist consultation and monitoring during construction; Support implementation and documentation of required mitigation planting; and Monitor mitigation trees for the required three-year period. The scope below establishes the District's anticipated minimum requirements. Consultants are encouraged to recommend modifications or additional activities they believe are necessary to achieve the project objectives, comply with applicable requirements, or improve the effectiveness of tree protection and monitoring. Tree protection during construction shall be performed in accordance with the City of Los Angeles Protected Tree Ordinance (Ordinance No. 177404), the City of Los Angeles Recreation and Parks Tree Protection Specifications, and the specific recommendations provided by the updated Protected Tree Report produced under this contract. Proposal Timeline Release Project Date: November 5, 2026 Pre-Proposal Meeting (Non-Mandatory): November 19, 2026, 3:00pm Chatsworth Park North Parking Lot, 22300 Chatsworth St, Chatsworth, CA 91311. Please send RSVP to smathews@lvmwd.gov Question Submission Deadline: November 27, 2026, 5:00pm Proposal Submission Deadline: December 4, 2026, 3:00pm ADDITIONAL CONDITIONS Minimum Consultant Qualifications Consultant shall provide information to verify the following minimum qualifications: Consulting arborist experience related to the proposed project, with a construction value of at least $200,000. Professional liability insurance in the amount of $1 million. The qualified arborist shall have sufficient experience in the preparation of protected tree reports and protection of trees during construction, with a minimum of 5 years’ experience. Arborist must be an ISA Certified Arborist or Registered Consulting Arborist. PROPOSAL REQUIREMENTS General Requirements Inquiries Inquiries concerning the request for proposals must be received through the Procurement Portal by 5:00 pm on Friday, November 27, 2026 . Answers to questions received will be posted through the Procurement Portal. It is the proposer’s responsibility to ensure that they access and review any questions and answers posted. The District is not responsible to notify individual potential bidders of the availability of questions and answers beyond this notice. CONTACT WITH PERSONNEL OF THE DISTRICT OTHER THAN ABOVE REGARDING THIS REQUEST FOR PROPOSALS MAY BE GROUNDS FOR ELIMINATION FROM THE SELECTION PROCESS. Addenda – The District may post addenda to the RFP, through the Procurement Portal. It is the potential proposer’s responsibility to access any addenda and ensure that stated requirements are met. Submission of Proposals The following material is required to be received by 3:00 pm , Friday, December 4, 2026 for a proposing firm to be considered: Title Page Title page showing the request for proposals' subject; the firm's name; the name, address and telephone number of a contact person; and the date of the proposal. Table of Contents Transmittal Letter A signed letter of transmittal briefly stating the proposer's understanding of the work to be done, the commitment to perform the work within the time period, a statement why the firm believes itself to be best qualified to perform the engagement and a statement that the proposal is a firm and irrevocable offer for 90 days. Key Personnel Describe the staffing model your firm will use to fulfill the Scope of Work. Provide resumes of all key personnel who will be assigned to the District. Any changes to the key personnel must be approved by the District prior to award. References List a minimum of three (3) references for whom comparable services were provided. Provide current contact information including names, email, and direct phone as well as a brief summary of the project, including costs and key results achieved. Qualifications and Experience Describe your firm’s qualifications to complete this Scope of Work. Explain why your firm is the best to deliver this Scope of Work and provide examples of your firm’s work. Detailed proposal The detailed proposal should follow the order in Section II – Scope of Services and should provide sufficient detail to understand how the scope will be accomplished. A schedule for the preparation of the updated Protected Tree Report shall be included. Legal Issues and Potential Conflicts of Interest The proposal must provide any pending investigations of the firm and any enforcement, settlement, or disciplinary actions taken within the last five years against the firm or any proposed key personnel and any known potential conflicts of interest related to this engagement. Costs Costs proposals must include a “Not to Exceed” amount for each item in SCOPE OF SERVICES section as well as a breakdown of hourly rates by position that will be assigned to the District and the proposed hours under each task. Any cost not explicitly proposed will be ineligible for payment. The hourly billing rates included in the proposal shall remain firm through June 30, 2027. Thereafter, the Consultant may request an adjustment to its hourly billing rates no more than once per 12-month period. Any annual rate adjustment shall not exceed the percentage increase in the Consumer Price Index for All Urban Consumers (CPI-U), Los Angeles published by the U.S. Department of Labor, Bureau of Labor Statistics, for the applicable 12-month period. Rate adjustments shall not be automatic. The Consultant shall submit any requested adjustment in writing, and the adjustment shall become effective only upon written approval by the District. No retroactive rate adjustments will be allowed. An adjustment to hourly billing rates shall not automatically increase the Consultant's authorized NTE compensation. Any increase to the total authorized NTE amount must be separately approved by the District in accordance with the Agreement and applicable District authorization requirements. The Consultant acknowledges that the timing of construction and subsequent mitigation monitoring is subject to change. Delayed commencement, suspension, or rescheduling of construction shall not, by itself, entitle the Consultant to additional compensation other than approved adjustments to hourly billing rates as provided herein. Each proposal shall be limited to no more than 20 pages, excluding resumes. The estimated hours and fee will be excluded from the total page count. Each page of text and/or figures will count as a page; blank pages used for layout spacing purposes will not be included in the total page count. Figures or graphics on 11x17 paper will be allowed and will count as 1 page. EVALUATION PROCEDURES Review of Proposals Proposals submitted will be evaluated by key District personnel. The District reserves the right to retain all proposals submitted and use any idea in a proposal regardless of whether that proposal is selected. Oral Presentation During the evaluation process, the District may, at its sole discretion, request any one, all, or no firms to make oral presentations. Such presentations will provide firms with an opportunity to answer any questions the District may have on a firm's proposal. Not all firms may be asked to make such oral presentations. Final Selection The District will recommend a contract to the Board based upon the recommendation of District staff reviewing the proposals. EVALUATION CRITERIA Proposals will be evaluated using three sets of criteria. Firms meeting the mandatory criteria will have their proposal evaluated for both technical qualifications and price. The following represent the principal selection criteria which will be considered during the evaluation process. CONDITIONS GOVERNING THE REQUEST FOR PROPOSALS Right to Reject Proposals Submission of a proposal indicates acceptance by the firm of the conditions contained in this Request for Proposals unless clearly and specifically noted in the proposal submitted and confirmed in the contract between the District and the firm selected. The District reserves the right without prejudice to reject any or all proposals. Receiving Time/Late Proposals It is the responsibility of proposer to see that their proposal is submitted with sufficient time to be received by the District prior to the proposal closing time. All responses must be received by the District by the deadline. Acceptance of Conditions Governing this RFP Submission of a proposal constitutes acceptance of the Evaluation Factors contained in this RFP. Incurring Cost Any cost incurred by the proposer in preparation, transmittal, presentation of any proposal or material submitted in response to this RFP shall be borne solely by the proposer. Any cost incurred by the proposer for set up and demonstration or for interviews shall be borne solely by the proposer. Proposer’s Rights to Withdraw Proposal Proposers will be allowed to withdraw their proposals at any time prior to the deadline for receipt of proposals, through the Procurement Portal. Sub-consultants Use of sub-consultants must be clearly explained in the proposal and identified by name. Prime consultants shall be wholly responsible for the entire performance whether or not sub-consultants are used. Substitution of sub-consultants must be approved in writing by the District. Best and Final Offer The District reserves the right to request Best and Final Offers from any or all proposers. This will be the only opportunity to amend or modify proposals based on feedback from the District. Information from competing proposals will not be disclosed to other proposers prior to submission of a Best and Final Offer. Disclosure of Proposal Contents All proposals are subject to the provisions of the California Public Records Act, California Government Code section 6250 et seq., and any information submitted with a response is a public record subject to disclosure, unless a specific exemption applies. Manner of Payment Payments will be made monthly following the month of service. Net 30 upon completion of monthly service after receipt of a properly prepared invoice. Insurance Proposer shall maintain such insurance as will protect it from claims under Workers' Compensation laws, and such liability insurance as will protect against claims for damages for bodily injury, including death, and damages to property in accordance with the terms of the Agreement. Coverage of which is to be no less than Source: OpenGov https://procurement.opengov.com/portal/lvmwd/projects/317837 Canonical URL: https://govcontractfinder.com/contracts/certified-arborist-services-for-twin-lakes-pump-station-pipe-opengov-14773001-project-317837