Chemical Controller Purchase State and local opportunity pending City of Cleveland 2025-RFP-151 Posted: 2026-10-21T19:00:01.417Z Response deadline: 2026-11-27T21:00:00.000Z The City of Cleveland Department of Parks and Recreation is soliciting written proposals from authorized vendors of Santa Barbara Control Systems, doing business under the brand name Chemtrol, for the purchase of Twelve (12) chemical controllers One (1) Chemtrol Model PC 2100 with communication option and a Chemtrol CO2 PH Control System will not need to be installed but will be delivered to The City of Cleveland Parks and Recreation to function as a backup unit. The remaining eleven (11) Chemtrol Model PC 2100 with communication option and the Chemtrol CO2 PH Control Systems (See Project Specifications) are to be installed at eight (8) of our recreation centers with indoor pools. with the following number of units at each location: Three (3) units at the Frederick Douglas Recreation Center, two (2) units will be installed at Collinwood Recreation Center, and one (1) Controller unit will be installed at each of the following Recreations Center pools: Cudell, Estabrook, Fairfax, Michael Zone, Stella Walsh, and Thurgood Marshall. Only vendors authorized to sell Chemtrol equipment are eligible to respond. Program & Scope of Work Chemical Controller Purchase The City of Cleveland Department of Parks and Recreation is soliciting written proposals from authorized vendors of Santa Barbara Control Systems, doing business under the brand name Chemtrol, for the purchase of Twelve (12) chemical controllers Overview of Scope of Work The City of Cleveland Department of Parks and Recreation is soliciting written proposals from authorized vendors of Santa Barbara Control Systems, doing business under the brand name Chemtrol, for the purchase of Twelve (12) chemical controllers One (1) Chemtrol Model PC 2100 with communication option and a Chemtrol CO2 PH Control System will not need to be installed but will be delivered to The City of Cleveland Parks and Recreation to function as a backup unit. The remaining eleven (11) Chemtrol Model PC 2100 with communication option and the Chemtrol CO2 PH Control Systems (See Project Specifications) are to be installed at eight (8) of our recreation centers with indoor pools. with the following number of units at each location: Three (3) units at the Frederick Douglas Recreation Center, two (2) units will be installed at Collinwood Recreation Center, and one (1) Controller unit will be installed at each of the following Recreations Center pools: Cudell, Estabrook, Fairfax, Michael Zone, Stella Walsh, and Thurgood Marshall. Only vendors authorized to sell Chemtrol equipment are eligible to respond. Design Scope Specification 2. Proposal Requirements Interested vendors shall submit a written proposal that includes, at a minimum, the following: A detailed price quotation for all required equipment Installation proposal and costs for each of the eight (8) different locations Vendor background information and relevant experience References for similar projects or installations Description and specifications of all equipment being provided A completed and fully executed Bid Form A completed W-9 Form 3. Project Specifications Each of the Twelve (12) chemical controller units must be manufactured by Santa Barbara Control Systems and branded as Chemtrol. No substitutions will be accepted. Each proposal shall include the following items for each of the Twelve (12) units: A. Chemical Controller One (1) Chemtrol Model PC 2100 Includes: pH sensor ORP sensor Temperature sensor Flow cell assembly Flow switch B. Communication Option One (1) PCx-ETHCOM Ethernet Remote Communication Option included with each PC 2100 unit C. CO₂ pH Control System One (1) Chemtrol CO₂ pH control system Includes: Victor SR 311 pressure regulator, factory set to 80 PSI outlet pressure Flowmeter range: 0–100 SCFH Approximate dimensions: 7.5" x 9.5" x 5" Overview Summary City of Cleveland Department of Parks and Recreation Cleveland, Ohio Request for Proposal (RFP) Chemical Controller Purchase RFP Year: 2026 1. Introduction The City of Cleveland Department of Parks and Recreation is soliciting written proposals from authorized vendors of Santa Barbara Control Systems, doing business under the brand name Chemtrol, for the purchase of Twelve (12) chemical controllers One (1) Chemtrol Model PC 2100 with communication option and a Chemtrol CO2 PH Control System will not need to be installed but will be delivered to The City of Cleveland Parks and Recreation to function as a backup unit. The remaining eleven (11) Chemtrol Model PC 2100 with communication option and the Chemtrol CO2 PH Control Systems (See Project Specifications) are to be installed at eight (8) of our recreation centers with indoor pools. with the following number of units at each location: Three (3) units at the Frederick Douglas Recreation Center, two (2) units will be installed at Collinwood Recreation Center, and one (1) Controller unit will be installed at each of the following Recreations Center pools: Cudell, Estabrook, Fairfax, Michael Zone, Stella Walsh, and Thurgood Marshall. Only vendors authorized to sell Chemtrol equipment are eligible to respond. Eleven of the Chemtrol controllers will be installed in the following locations: 2. Proposal Requirements Interested vendors shall submit a written proposal that includes, at a minimum, the following: A detailed price quotation for all required equipment Installation proposal and costs for each of the eight (8) different locations Vendor background information and relevant experience References for similar projects or installations Description and specifications of all equipment being provided A completed and fully executed Bid Form A completed W-9 Form 3. Project Specifications Each of the Twelve (12) chemical controller units must be manufactured by Santa Barbara Control Systems and branded as Chemtrol. No substitutions will be accepted. Each proposal shall include the following items for each of the Twelve (12) units: A. Chemical Controller One (1) Chemtrol Model PC 2100 Includes: pH sensor ORP sensor Temperature sensor Flow cell assembly Flow switch B. Communication Option One (1) PCx-ETHCOM Ethernet Remote Communication Option included with each PC 2100 unit C. CO₂ pH Control System One (1) Chemtrol CO₂ pH control system Includes: Victor SR 311 pressure regulator, factory set to 80 PSI outlet pressure Flowmeter range: 0–100 SCFH Approximate dimensions: 7.5" x 9.5" x 5" 4. Proposal Submission Proposals may be submitted either: In hard copy, enclosed in a sealed envelope clearly labeled: “Chemical Controller Proposal” Electronically via email Submission Deadline: 4:00 p.m., October 15, 2026 Submission Address / Contact: City of Cleveland Department of Parks and Recreation 601 Lakeside Avenue, Room 8 Cleveland, OH 44114 Email Submissions: jclark3@clevelandohio.gov Questions or Clarifications: jclark3@clevelandohio.gov 5. Evaluation and Award The City of Cleveland reserves the right to award a contract to the bidder whose proposal is determined to be in the best interest of the City, after full consideration of cost, delivery schedule, vendor qualifications, and overall value. The City further reserves the right to reject any or all proposals, in whole or in part, and to waive informalities or irregularities in any proposal received Background Contact Information Timeline Process Brief MOCAP and the Owner’s Representative Team have compiled Criteria Documents which capture the owner’s intended scope of work. This information will serve as a basis for the overall project intent. The project will be delivered via Design-Build. The Scope of Design-Build Services for this project will be organized into the following components: Design Services: Phase A – Evaluation of Owner’s Criteria Phase B: Design Documents Phase C: Construction Administration Environmental Assessment Construction Services: Design-Builder's Fee Pre-Construction Serrvices Construction Base Cost (GMP) Descriptions of each component of the work are below, along with allowances, contingencies, and alternates. Action Steps and Ownership of Work Products The City reserves the right to contract for the performance of Stage I services only, and delay or terminate future Phases pending the outcome of the design and cost estimation work. Furthermore, the City reserves the right to award a contract for all Phases of the project, yet terminate the project at any time, upon written notice to the Design-Builder and making payment for all satisfactory services rendered to date of termination. All deliverables shall become the sole property of the City for use or distribution as it sees fit without limitations from the Design-Builder, other than usual disclaimers for reliance of accuracy of use of another person’s work product. Possible Separate Bid Packages Based on any opportunity identified by the Director of the Mayor’s Office of Capital Projects, the Design-Builder shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City, and to provide all Design-Build Services if there is more than one bid package. The Design-Builder shall include in its Design-Build Fee Proposal any additional costs that may be incurred in the event that the City desires to issue up to N.A. bid packages to accomplish the work. City Agencies (Cleveland) The Design-Builder shall consult in detail with the Director of the Mayor’s Office of Capital Projects (MOCAP) and/or his designee and carefully analyze any information furnished by the Owner concerning the specific requirements of the Project, including but not limited to, design, construction, scheduling, budgetary, or operational requirements, limitations, and objectives. The Division of Architecture and Site Development (DASD) will coordinate the project and will work closely with the Design-Builder in all phases of the development. The Design-Builder shall comply with all standards and directives established and issued by the Division of Architecture and Site Development. The City of Cleveland may retain an Owner’s Representative Team to perform functions of DASD as needed. This facility is located within the corporate limits of Cleveland, Ohio and all work shall comply with all local, state and/or federal standards and ordinances and revised codes, including but not limited to Ohio Revised Code (O.R.C.) Chapter 153, as applicable to the scope of work. Compliance with these standards is mandatory by the Design-Builder and any resources needed to gain design compliance shall be borne by the Design-Builder. Proposal Schedule Questions The deadline for any and all questions, including if this RFP should contain any discrepancies or omissions, or if the intended meaning of any part of this RFP is unclear or in doubt, shall be Wednesday, November 4, 2026 at 4:00 pm Local Time. Questions should be directed/addressed via City's OpenGov e-Procurement Portal Question & Answer feature. Deadline Proposals must be received no later than Friday, November 27, 2026 at 4:00 pm Local Time. No proposals will be accepted after that time unless the City has extended the deadline by a written addendum. The City reserves the right to refuse any submission not delivered by the deadline. PROPOSALS OR UNSOLICITED AMENDMENTS TO PROPOSALS ARRIVING AFTER THE CLOSING WILL NOT BE ACCEPTED All proposals shall be submitted electronically via City's OpenGov e-Procurement Portal Proposal documents shall in in PDF format and submitted via City's OpenGov e-Procurement Portal Submit the Services Proposal and Fee Proposal as described in the “Proposal Submission Requirements” section of this RFP. Fee Proposals shall be a separate pdf file from the Services Proposal. File names must clearly identify the firm’s name which file is the Services Proposal and which is the Fee Proposal. Other Conditions and Information Formats for Deliverables All deliverables for all Components shall be submitted in native software formats (e.g.: “~.pdf” AND “~.dwg” AutoCAD® for Drawing files; “~.pdf” AND Microsoft Project® for Project Schedules; “~.pdf” AND “~.xls” for cost estimates) via electronic download at the end of each Component as Record Deliverables. Files may be compressed in a “~.zip” file format. Meeting Minutes Throughout Stage I and II the Design-Builder shall record and issue meeting minutes for all meetings, conferences, and conference calls attended by the Design-Builder to all attendees within three (3) business days of the event’s conclusion. Project Schedule Design-Builder shall submit within ten (10) calendar days after the award and/or execution of the Contract a Project Schedule which shall include: Proposed duration of each Stage and Phase. Milestone dates including review submittals. Allowance for reasonable time required for all reviews/approvals by all authorities. The Design-Builder shall produce, maintain, update biweekly, and submit the Project Schedule at each Stage and Phase of the project, or as requested by the City or the Owner’s Representative Team. Management of the Budget The Design-Builder shall be responsible for managing the Project Budget, and shall, during each Stage per the Scope of Design-Build Services described in this RFP: Provide Cost Estimates which break down cost by work area and/or system, and then organize in CSI format appropriate to the level of project completion in Microsoft Excel, formatted for 8-1/2” x 11 paper. Review the Project Scope and Budget with the City and/or the Owner’s Representative Team and provide back-up documentation. Adjust the Project Scope and modify documents as necessary to ensure alignment of Project Scope with the Project Budget. The City shall not consider any Stage or Phase of the Design-Build Services as complete, nor authorize the continuation of the Design-Builder’s Services, until satisfied that the Project Scope as defined in the Contract Documents can be achieved within the Project Budget. Design-Build Services Payments Payments for Design-Build Services shall be made in accordance with the Design-Builder’s Proposed Design-Build Fee Proposal (See Proposal Submission Requirements). Design-Builder shall be responsible for management of the Design-Build Services Fee as follows: Requests for Payment, to include (provide sample for City approval): Design-Build Fee Proposal Breakdown by Stage per Proposal. Percent Complete, Amount Earned, Previous Billing, and Current Billing by Stage. Reimbursable Expenses by Phase, broken down by Current, Prior, and Billed-to-Date. Staff logs/hours expended and reimbursable receipts for each Request for Payment. Requests for Payment shall be submitted on a monthly basis not to exceed the amounts stipulated in the Design-Build Fee Proposal, including reimbursable expenses, for each Stage and Phase. Payments may not exceed 90% of each Stage or Phase until the Phase or Stage is satisfactorily completed and accepted by the City. Final payment will be made only when all record and project close-out documents have been accepted by the City as complete. Any portions of Fees or Reimbursable Allowances not utilized for any Stage or Phase may only be utilized in later Stages or Phases with prior written authorization by the City. Composition of Design-Build Team While it is the responsibility of the proposers to determine the composition of their team, it is anticipated that the Design-Build team may include but not limited to: Design-Builder Architect Structural engineer Building envelope specialist Mason Environmental/Hazardous Material specialist It is the prime consultant’s responsibility to determine the subconsultants/subcontractors required to complete this project. Standard of Care The standard of care of the services provided by the Design-Builder shall meet or exceed that level commonly expected of professional architects, engineers, and Design-Builders that are licensed to practice in the State of Ohio. The Design-Builder shall assume the role of Design-Builder for all work performed under the contract and all entities that comprise the Design-Build team shall be licensed in the State of Ohio as required. All documents for the work performed under the contract shall bear a current, active professional seal recognized and as required by the State of Ohio. The Design-Builder shall attend and participate in project meetings with various City departments/divisions and/or public meetings as required during all Stages. Upon request, the Design-Builder shall make field observations and conduct investigations, as required, to evaluate existing conditions during all Stages. Upon request, the Design-Builder, through the services of a sub-Design-Builder, shall provide environmental assessment services to determine the extent and impact of the presence of hazardous materials within a project area. Individuals performing these services must be fully licensed to perform the services needed and shall work with the Design-Builder and the Division to prepare scopes of work and cost estimates for remediation work. Site Review And On-Site Questions It is the responsibility of the Design-Builder to be fully acquainted with the existing conditions of the project by conducting visual inspections and site visit(s) prior to proposal submission. These visits are for observation only. No discussions on-site shall be deemed official. All questions must be submitted in writing and will be responded to within an addendum to this RFP. Proposal Acceptance The City reserves the right to accept proposals, in whole or in part, to reject any or all proposals or portions thereof, to waive irregularities, informalities, and technicalities, to re-issue or to proceed to obtain the Design-Build Services(s) desired otherwise, and to negotiate separately, as necessary, to serve the best interest of the City of Cleveland. The Director and/or the Owner’s Representative Team may modify or amend any provision of this notice, or the RFP. Proposers whose proposals are not accepted will be notified in writing. The Director of the Department of Public Works, or his designee, will make notification of the award. For this Request for Proposal, the proposal must remain valid for 180 days after submission. Costs Incurred The City is not liable for any costs incurred by any responding firms before execution of a contract and issuance of written Notice to Proceed. Economy of Preparation Proposals should be prepared simply and economically in 8-1/2" × 11" vertical format, providing straightforward, concise descriptions and information. Company brochures and marketing materials will not be accepted. Agreement The successful Design-Builder Team shall be required to execute an agreement substantially in the form of the Sample Design-Build Services Agreement attached as Exhibit E as amended to incorporate the full range of Design-Build Services described in this RFP. Where a conflict arises between the terms and conditions of the RFP and the Design-Builder Proposal then the terms and conditions of the RFP shall prevail, unless specifically addressed in the Design-Build Services Contract. Notifications To assure that all modifications, notices and addenda are received, all interested firms that are included and not included on the list are required to "Follow" the project via City's OpenGov e-Procurement Portal . Said modifications, notices and addenda will be issued to those firms that have made their interest known. Firms that fail to confirm their interest risk not receiving important information regarding the project. The City will require the selected Consultant Team to abide by this RFP and any subsequent modifications, notices and addenda. Proposal Selection Criteria Interviews Based on preliminary scoring of po Source: OpenGov https://procurement.opengov.com/portal/clevelandoh/projects/299298 Canonical URL: https://govcontractfinder.com/contracts/chemical-controller-purchase-opengov-4214-project-299298