CHESTNUT GROVE CEMETERY DEVELOPMENT PROJECT State and local opportunity open Town of Herndon B-27-01 Posted: 2026-11-03T13:53:30.386Z Response deadline: 2026-12-10T16:00:05.908Z Department of Public Works Town of Herndon ADVERTISEMENT FOR BID CHESTNUT GROVE CEMETERY DEVELOPMENT PROJECT Contract No. B#27-01 Sealed bids are hereby solicited for construction of CHESTNUT GROVE CEMETERY DEVELOPMENT PROJECT located in Herndon, Virginia. The work shall include the following: The Work generally consists of the clearing, grading, site development, stormwater and drainage improvements, roadway construction, landscaping, and related site improvements necessary for the development of approximately 3.7 acres at the northwest corner of Chestnut Grove Cemetery, located at 831 Dranesville Road. The completed improvements will accommodate approximately 2,500 burial sites, associated access roads, drainage and stormwater facilities, landscape improvements, and the design and construction of the three (3) Landscape Material Bins. The Contractor shall be solely responsible for providing the design, engineering, structural calculations, materials, labor, equipment, and construction necessary to complete the Landscape Material Bins in accordance with applicable codes, regulations, and the requirements of the authorities having jurisdiction. The design and all necessary structural calculations shall be prepared, signed, and sealed by a Professional Engineer licensed to practice in the Commonwealth of Virginia. The Contractor shall submit the design drawings, structural calculations, and other required documentation to the Town’s Building Official for review and approval as part of the building permit application process. The Contractor shall obtain the required building permit and any other applicable approvals prior to commencing construction of the Landscape Material Bins. All costs associated with the design, engineering, structural calculations, preparation and submission of documents, permit applications, and related professional services shall be the responsibility of the Contractor and shall be included in the Contract Price. The Professional Engineer shall be retained and compensated directly by the Contractor. There is no permit application fee associated with this submission. The Work shall also include the construction of an initial burial area with capacity for at least 100 burial plots. This area shall be constructed as a priority following installation and stabilization of the required erosion and sediment control measures and completion of required tree clearing, allowing the Owner to maintain ongoing cemetery operations during construction. The Contractor shall provide any additional surveying needed to establish appropriate grades for the initial burial area and ensure compatibility with the other improvements at no additional cost to the Town. The Contractor shall furnish all labor, materials, equipment, supervision, temporary facilities, erosion and sediment control measures, coordination, restoration, and incidental Work necessary to complete the Project in accordance with the Contract Documents, including the Plans, Specifications, Geotechnical Report, applicable permits, codes, regulations, and requirements of authorities having jurisdiction. Because the cemetery will remain operational throughout construction, the Contractor shall coordinate and sequence the Work with the Owner to maintain safe access and minimize disruption to ongoing cemetery operations, including burials, visitors, cemetery staff, and other activities. All required approvals from the Virginia Department of Historic Resources (VDHR) for the Project have been received. The only remaining regulatory approval is from the U.S. Army Corps of Engineers (USACE), which remains pending. The Contractor shall not commence construction until USACE approval has been obtained, and the Owner has issued a formal Notice to Proceed. The Town will provide a professional archaeologist to be present on-site during all ground-disturbing activities to monitor the work and ensure compliance with VDHR requirements and applicable conditions of approval. The Contractor shall coordinate and schedule all ground-disturbing activities with the Town to ensure the archaeologist's availability. The Contractor shall account for this coordination requirement in its construction schedule and allow for any necessary adjustments to the work sequence. Based on information available to the Owner as of the date of advertisement, no additional design modifications or archaeological investigations are currently anticipated. However, the Owner does not guarantee the timing or conditions of the remaining USACE approval. The contractor is required to coordinate construction with the Town representative prior to the start of any work, so as to minimize impact on ongoing Town operations. The contractor’s baseline schedule must account for long lead times, as extended durations of inactivity will not be acceptable. This is a lump sum contract. Contract length is 270 calendar days to the date of Substantial Completion. SPECIAL CONDITIONS PROJECT LOCATION AND SITE MAP The work is to be performed within Chestnut Grove Cemetery at 831 Dranesville Road, Herndon, Virginia 20170. Please see Attachment E. WORKING HOURS Work under this Contract shall be performed only during the following hours: Mondays and the first workday following a Town-observed holiday: 8:00 a.m. to 4:00 p.m. Tuesday through Friday: 7:00 a.m. to 4:00 p.m. No work shall be performed on Saturdays, Sundays, or holidays. Any request to perform work outside the permitted hours shall be submitted in writing to the Director of Public Works at least seventy-two (72) hours in advance and shall require prior written approval. The Contractor shall also provide written notification to the Herndon Police Department at least forty-eight (48) hours prior to performing any approved after-hours work. ACTIVE CEMETERY OPERATIONS The Work will be performed within and adjacent to an active cemetery. The cemetery will remain operational throughout the construction period. The Contractor shall plan, coordinate, and execute the Work in a manner that minimizes disruption to cemetery operations and maintains safe access for the Owner, cemetery staff, funeral services, visitors, and the public. The Contractor shall coordinate construction activities with the Owner and shall provide appropriate temporary access, barricades, signage, protection, and other measures necessary to safely separate construction operations from areas of the cemetery that remain in use. COORDINATION WITH CEMETERY OPERATIONS The Contractor shall coordinate its construction activities with the Owner to accommodate scheduled burials, funeral services, cemetery visitors, and routine cemetery operations. The Contractor shall provide the Owner with advance notice of construction activities that may affect access, burial operations, or normal use of the cemetery. The Owner may require reasonable adjustment or temporary suspension of construction activities when necessary to accommodate scheduled cemetery operations. The Contractor shall incorporate such coordination into its construction schedule and shall not use ongoing cemetery operations as justification for failure to properly plan and sequence the Work. INITIAL BURIAL AREA-PRIORITY WORK The Owner has a limited supply of available burial plots and must maintain continuous burial operations during construction. Accordingly, construction of the initial burial area, with capacity for at least 100 burial plots, shall be designated as a priority Work item. Following installation and stabilization of the required erosion and sediment control measures and completion of required tree clearing, the Contractor shall proceed with construction of the initial burial area as soon as practicable. The initial burial area shall be located generally across the access road in front of the existing office buildings. The Contractor shall coordinate the limits and construction of the area with the Owner. The Contractor shall perform all Work necessary to establish a suitable and stable burial area, including clearing, grubbing, excavation, grading, filling, compaction, drainage, topsoil placement, and related Work. The Contractor shall complete the initial burial area to the extent necessary to allow the Owner to resume or continue burial operations as early as practicable while construction of the remaining portions of the project proceeds. CONSTRUCTION SEQUENCING The Contractor shall submit and maintain a construction schedule showing the proposed sequence and timing of major construction activities. At a minimum, the schedule shall address: Installation and stabilization of erosion and sediment control measures; Required tree clearing; Construction and completion of the initial burial area; Major earthwork and grading; Storm drainage and stormwater management improvements; Roadway construction; Landscape improvements; Design and construction of landscape material storage bins; Final stabilization and restoration; and Substantial completion and site walkthrough. TREE CLEARING RESTRICTIONS All tree cutting and associated clearing activities shall be completed no later than March 31, 2027. The Contractor shall be responsible for planning and scheduling its Work to comply with this restriction. The Contractor shall consider the clearing restriction when developing its construction schedule, mobilization plan, and sequencing of the Work. PROTECTION OF EXISTING CEMETERY FACILITIES The Contractor shall exercise particular care when working near existing graves, monuments, memorials, structures, utilities, roads, trees, landscaping, and other facilities designated to remain. Construction equipment, materials, excavated materials, spoil, debris, and temporary facilities shall not be placed over graves, monuments, or other protected areas. The Contractor shall immediately notify the Owner of any damage, disturbance, or condition that could affect an existing grave, monument, memorial, utility, structure, or other facility. Any damage caused by the Contractor's operations shall be repaired or restored to the satisfaction of the Owner at no additional cost. CONSTRUCTION ACCESS AND TRAFFIC The Contractor shall maintain safe and controlled access to the cemetery throughout construction. Construction access routes, haul routes, equipment staging areas, material storage areas, and temporary facilities shall be coordinated with the Owner and shall not unnecessarily interfere with cemetery operations. The Contractor shall maintain construction access routes and areas used by the public in a safe and reasonably clean condition and shall promptly remove mud, debris, and other materials resulting from construction activities. TEMPORARY FACILITIES AND SITE PROTECTION The Contractor shall provide all temporary facilities, protection, barricades, signage, access controls, temporary drainage, erosion and sediment controls, and other measures necessary for safe execution of the Work. Temporary facilities shall be located and maintained so as to minimize interference with cemetery operations and shall be removed upon completion of the Work unless otherwise directed. EARTHWORK AND EXISTING SITE CONDITIONS The Contractor shall review the Geotechnical Report and shall incorporate its recommendations into the construction means, methods, sequencing, and earthwork operations. The Contractor shall properly manage excavated and fill materials and shall maintain the site in a condition suitable for continued construction and cemetery operations. No unsuitable material shall be incorporated into engineered fill or other permanent improvements. COORDINATION AND NOTICE The Contractor shall provide the Owner with at least seventy-two (72) hours’ advance notice of any activities requiring Owner coordination, inspections, access restrictions, temporary closures, or otherwise impacting cemetery operations. The Contractor shall promptly notify the Owner of any condition that may affect the Contract schedule, required sequencing, cemetery operations, or completion of the Work. NOTICE TO PROCEED AND REGULATORY DELAYS The Contractor shall not commence construction or mobilize for construction activities until the Owner has issued a formal Notice to Proceed following receipt of all required regulatory approvals. If issuance of the Notice to Proceed is delayed due to pending USACE approval, the Contractor shall be entitled to an appropriate extension of the Contract Time for the resulting delay but shall not be entitled to additional compensation for mobilization, demobilization, standby, overhead, or other delay-related costs attributable solely to the pending regulatory approvals The Contractor shall not rely upon the anticipated timing of any pending regulatory approval in establishing its schedule, procurement activities, mobilization, or other obligations under the Contract. If any required regulatory approval is denied or is issued with conditions or modifications that, in the Owner’s determination, materially affect the Project, the Owner reserves the right to cancel the solicitation without liability or cost to the Owner. RESPONSIBILITY FOR COMPLETE WORK The Contractor shall comply with all applicable federal, state, and local laws, regulations, permits, environmental requirements, and requirements of authorities having jurisdiction. The Contractor shall be responsible for coordinating all inspections, testing, approvals, and permits required for its Work and shall provide the Owner with at least seventy-two (72) hours’ advance notice of all required inspections. The Contractor shall provide all labor, materials, equipment, supervision, temporary facilities, protection, coordination, restoration, and incidental Work necessary to complete the project in accordance with the Contract Documents. STAGING AREAS Within five (5) days of the Notice to Proceed, the Contractor shall submit a mobilization and staging area plan to the Department of Public Works Project Engineer for review and approval. The plan shall identify all proposed staging, storage, and mobilization areas and include, at a minimum, proposed locations of trailers, material storage, and stockpiles; delivery and removal procedures; protection of existing utilities and structures; site security; and restoration measures. The Contractor is encouraged to coordinate preparation of the plan with the Project Engineer before submission. All staging areas and on-site storage locations shall be subject to the Project Engineer’s approval. The Contractor shall limit its use of the job site for storage and work operations in accordance with the approved plan and the physical constraints of the site. The Contractor shall recognize that the size and configuration of the job site may significantly limit the amount of material and equipment that can be stored on-site. The single access route connecting the main road to the job site, together with the high school located directly across from the site entrance, may impose additional restrictions on the timing, frequency, rate, and means of deliveries and removals. The Contractor shall plan and coordinate its operations accordingly, scheduling deliveries and removals to minimize traffic congestion, avoid interference with school-related traffic and activities, and maintain safe access to and from the job site. A Town truck route map is available upon request. The Contractor shall install, maintain, and protect all erosion and sediment control measures and tree protection measures shown on the Contract Drawings and required by the Contract Documents before commencing the activities for which such measures are required. The Contractor shall coordinate installation with the Project Engineer and maintain the measures throughout construction. Any damaged or ineffective measures shall be promptly repaired or replaced. The Contractor shall install chain-link fencing around the entire perimeter of the staging area. The fencing shall be at least six (6) feet high and screened from public view with opaque material. The Contractor shall maintain the fencing throughout use of the staging area and remove it upon completion of staging operations, unless otherwise directed by the Project Engineer. Daily excavation activities shall be performed in accordance with the Specifications. Excavated material, spoil, and demolition debris that cannot be reused on-site shall be promptly removed from the job site and disposed of properly. Such materials shall not be stockpiled or stored in the staging area. At the discretion of the Project Engineer, a limited portion of the approved mobilization and staging area may be used temporarily to stockpile backfill material intended for reuse on-site. Stockpiling shall be limited to quantities reasonably necessary for upcoming construction activities and shall not be used to accumulate or store material for work that is not anticipated to occur in the near term. The location, quantity, and duration of all stockpiles shall be subject to the Project Engineer’s approval. Approved stockpiles shall comply with the following requirements: Stockpiled materials shall be protected by erosion and sediment control measures in accordance with the Virginia Erosion and Sediment Control Handbook, the Contract Drawings, and the applicable Contract Documents. Stockpiled materials shall not remain on-site for more than thirty (30) days. Any stockpiled material remaining beyond this period shall be removed by the Town at the Contractor’s expense, subject to the applicable Contract Documents. Stockpiles shall be managed to prevent erosion, sediment discharge, interference with construction operations, and obstruction of access or drainage facilities. Upon completion of use, the Contractor shall remove all materials, equipment, temporary facilities, fencing, and debris from the staging area and restore the area to its original condition or better, as determined by the Project Engineer. Restoration of the mobilization and staging area, as well as turf restoration within construction disturbance areas, shall comply with the Virginia Department of Environmental Quality (DEQ) soil stabilization and erosion control specifications and the applicable Contract Documents. Restoration shall include seeding and installation of either erosion control blankets with photodegradable plastic netting or jute mesh, as specified in the Contract Documents. The Contractor shall repair any damage resulting from its use of the staging area and complete all restoration to the Project Engineer’s satisfaction. USE OF THE ADJOINING PROPERTIES The contractor shall not block otherwise open commercial or residential driveways or entrances. Uninterrupted pedestrian access to all buildings adjacent to the construction site must be provided at all times. If a primary driveway or entrance to a residential or commercial building must be temporarily closed, the contractor shall coordinate with the building owner to provide alternate access to the building. Uninterrupted delivery access to all buildings adjacent to the construction site must be provided at all times. The contractor shall coordinate with the property owners to provide alternate delivery access if the primary delivery access must be temporarily closed. The full width of all the areas immediately outside the construction area shall remain unobstructed at all times. Non-motorized and pedestrian traffic on adjacent sidewalks that are outside of the construction area shall remain uninterrupted. Pedestrian traffic must remain uninterrupted on at least one side of all streets. Pedestrian detours and appropriate signs shall be provided to maintain access to all residences and businesses. Contractor shall coordinate with building and property owners to understand and provide for access and delivery needs. Ensure site conditions remain clean and debris-free during construction activities. Project site will be Source: OpenGov https://procurement.opengov.com/portal/herndon-va/projects/320689 Canonical URL: https://govcontractfinder.com/contracts/chestnut-grove-cemetery-development-project-opengov-5436-project-320689