Clean Concrete/Masonry Crushing Services State and local opportunity open Santa Rosa County 27-001 Posted: 2026-11-09T14:27:02.420Z Response deadline: 2026-12-01T16:00:00.000Z MEMORANDUM TO: Company Addressed DATE: Monday, November 9, 2026 FROM: Santa Rosa County Procurement Office SUBJECT: 27-001 Clean Concrete/Masonry Crushing Services Notice is hereby given that the Santa Rosa County Board of County Commissioners is seeking bids from qualified contractors to provide concrete crushing and processing services on an as-needed basis at the Santa Rosa County Central Landfill, located at 6337 Da Lisa Road, Milton, Florida. A non-mandatory pre-bid meeting will be held at the Santa Rosa County Central Landfill, located at 6337 Da Lisa Road, Milton, Florida at 10:00 a.m. on November 19, 2026. All interested parties are strongly encouraged to attend. Please meet in the front parking lot for further instructions. Specifications may be secured through the Santa Rosa County Procurement Portal at https://procurement.opengov.com/portal/santarosafl Questions concerning this request should be submitted through the procurement portal by 12:00 pm on Tuesday, November 24, 2026 . Please submit all bids through the procurement portal at https://procurement.opengov.com/portal/santarosafl by 10:00 am on Tuesday, December 1, 2026 , at which time will be publicly opened via Teams. Santa Rosa County Board of County Commissioners encourages all segments of the business community to participate in its procurement opportunities, including small businesses, minority/women owned businesses, and disadvantaged business enterprises. The Board does not discriminate on the basis of race, color, religion, national origin, disability, sex, or age in the administration of contracts. The Board of County Commissioners reserves the right to waive irregularities in bids, to reject any or all bids for sound documented reasons, and to award the bid that it determines to be in the best interest of Santa Rosa County. By order of the Board of County Commissioners of Santa Rosa County, Florida. Bid Pricing Schedule The CONTRACTOR shall provide firm, all-inclusive unit prices for concrete crushing and processing services at the Santa Rosa County Central Landfill. Unit prices shall include all labor, equipment, mobilization, demobilization, fuel, transportation, material handling, crushing, screening, metal separation, dust suppression, environmental compliance, and finished material stockpiling necessary to complete the work described in this Invitation to Bid. No additional mobilization fees, fuel surcharges, equipment charges, or other expenses shall be paid unless specifically authorized in writing by the County. Basis of Award: The County intends to award the contract to the lowest responsive and responsible bidder based solely on the unit price submitted for Item 1 – Routine Concrete Crushing and Processing (Per Ton). The County does not guarantee any minimum quantity of material, number of crushing events, or annual expenditure. All processed materials shall remain the property of Santa Rosa County. Payment shall be based on eligible tonnage established in accordance with Section 1.13 – Measurement and Payment. Routine Concrete Crushing and Processing (Required) – Per Ton Scope of Work General Requirements The CONTRACTOR shall provide all labor, equipment, materials, fuel, supervision, transportation, and incidentals necessary to perform concrete crushing and processing services for Santa Rosa County on an as-needed basis. Services shall be performed at the Santa Rosa County Central Landfill, 6337 Da Lisa Road, Milton, Florida, within the designated concrete and masonry processing area, unless otherwise approved in writing by the Environmental Manager. The CONTRACTOR shall mobilize, operate, and demobilize all equipment necessary to crush accumulated concrete and masonry into reusable aggregate. All finished material shall remain the property of Santa Rosa County and shall be stockpiled in locations designated by the County. The County does not guarantee the availability of utilities, lighting, water, fuel, or equipment for the CONTRACTOR's use unless expressly authorized in writing. Acceptable Materials Materials authorized for processing include clean concrete, reinforced concrete, concrete block, brick, masonry, hardened mortar and grout, asphalt pavement, loose aggregate, and natural stone. The CONTRACTOR shall process only materials authorized by the County. Materials containing excessive contamination, household waste, wood, plastics, or other unsuitable materials shall not be crushed. The County generally inspects and separates incoming material before stockpiling. However, the CONTRACTOR shall be responsible for identifying and separating unsuitable materials encountered during crushing operations. The County does not impose maximum size or dimensional restrictions on incoming concrete and masonry materials. Stockpiled materials may include large concrete slabs, structural components, bridge piers, foundations, and other oversized pieces that may require additional breaking or preparation prior to crushing. Material Handling and Processing The CONTRACTOR shall provide all equipment and personnel necessary to load, handle, move, crush, screen, and stockpile concrete and masonry materials within the designated processing area. The CONTRACTOR shall be responsible for feeding materials into the crushing equipment, separating reinforcement steel, wire mesh, and other unsuitable materials, and maintaining separation between processed and unprocessed materials. The CONTRACTOR shall be responsible for the handling and preparation of oversized concrete and masonry materials that can reasonably be processed using its equipment. Exceptionally oversized or heavily reinforced structural components requiring specialized demolition or breaking equipment may be excluded from a crushing event at the discretion of the Environmental Manager or designee. Any excluded materials shall be separated and placed in an area designated by the County. Such materials shall be reweighed using the County's certified landfill scales, and their recorded weight shall be deducted from the payable tonnage for that crushing event. The County shall determine the final disposition of excluded materials. The CONTRACTOR shall move and stockpile all finished aggregate at locations designated by the Environmental Manager or designee, in accordance with the stockpiling distance requirements established in Section 1.4. All material handling, loading, processing, screening, metal separation, and stockpiling shall be performed by the CONTRACTOR using its own equipment and personnel. County personnel and equipment shall not be provided to assist with these activities. Finished Material Specifications The CONTRACTOR shall crush and screen all eligible material to produce aggregate suitable for use as a rudimentary road base material, with an approximate target size of 1½ inches. At least 95% of the processed material shall pass through a 3-inch round-hole screen. The County reserves the right to inspect finished material for compliance with these specifications. Material not meeting the required size shall be reprocessed by the CONTRACTOR at no additional cost to the County. All finished material shall be stockpiled separately from unprocessed material at locations designated by the Environmental Manager or designee, within a maximum distance of 300 feet from the crushing operation, unless otherwise mutually agreed upon. Scheduling and Mobilization Crushing events shall be performed on an as-needed basis as directed by Santa Rosa County. Upon request by the CONTRACTOR, the County may provide an estimated quantity of material available for processing, based on landfill scale records or an on-site assessment. This estimate is for planning purposes only and shall not constitute a guaranteed quantity or final payable tonnage. Providing an estimated quantity is not required for the County's notification to proceed to be valid. Upon notification by the County, the CONTRACTOR shall acknowledge the request and confirm availability within seventy-two (72) hours. Mobilization to the designated processing area shall be scheduled to occur within thirty (30) calendar days of County notification unless otherwise approved in writing by the Environmental Manager. Once mobilized, the CONTRACTOR shall provide sufficient equipment and personnel to complete crushing of all material designated for that event and shall remain mobilized until the authorized stockpile has been fully processed. The CONTRACTOR shall complete each crushing event within twenty-one (21) calendar days following mobilization unless an extension is approved in writing by the Environmental Manager. Equipment breakdowns, maintenance issues, staffing shortages, and other operational difficulties shall not automatically relieve the CONTRACTOR of scheduling or completion requirements. The Environmental Manager reserves the right to approve scheduling adjustments, extensions, or modifications based on operational needs, weather conditions, emergencies, or other circumstances. Hours of Operation All crushing operations, equipment maintenance, material handling, and other CONTRACTOR activities shall be conducted Monday through Saturday, between 7:00 a.m. and 5:00 p.m. Central Time. The CONTRACTOR shall ensure all personnel have exited County property and all equipment is secured before the landfill gates are locked at 5:00 p.m. No CONTRACTOR personnel shall access or remain on County property outside the established operating hours without prior written authorization from the Environmental Manager. Equipment and Personnel The CONTRACTOR shall furnish all crushers, screens, loaders, excavators, conveyors, magnets, water trucks, and other equipment necessary to perform the work. All equipment shall be maintained in safe operating condition and operated by qualified personnel. Required safety devices and manufacturer-installed protective equipment shall remain functional. The CONTRACTOR shall provide a knowledgeable on-site supervisor during all crushing operations who is authorized to direct personnel, coordinate with County staff, and address operational or safety concerns. The CONTRACTOR shall furnish all necessary spare parts, maintenance supplies, and replacement equipment to minimize interruptions. Equipment shall be removed following completion of each crushing event unless continued storage is approved in writing by the Environmental Manager. Dust Control The CONTRACTOR shall conduct crushing, screening, loading, and stockpiling operations in a manner that minimizes dust generation and prevents excessive airborne dust from affecting landfill operations, employees, customers, and surrounding areas. The CONTRACTOR shall be solely responsible for providing, installing, operating, and maintaining effective dust suppression measures, including water application, misting systems, or other appropriate methods. All dust control measures shall be provided at no additional cost to the County. The CONTRACTOR shall comply with applicable air quality requirements and implement appropriate worker protection measures for exposure to respirable crystalline silica and other airborne hazards. The County reserves the right to suspend crushing operations if dust control measures are determined to be inadequate. Operations shall not resume until corrective measures have been implemented and approved by the Environmental Manager or designee. The County has an existing water connection equipped with a 2-inch quick-connect cam-lock fitting located approximately 150 yards from the concrete processing area, on the opposite side of the access road. The CONTRACTOR may utilize this connection on a shared, nonexclusive basis to fill water trucks or portable tanks when available. The connection is not intended to provide a continuous piped water supply to crushing equipment. The County does not guarantee water availability, flow rate, pressure, or uninterrupted access due to maintenance, system failures, shutdowns, or operational needs. The CONTRACTOR shall be responsible for providing all necessary water trucks, tanks, hoses, fittings, and other equipment and for obtaining an alternate water supply when necessary, at no additional cost to the County. Environmental Compliance and FDEP Notifications The CONTRACTOR shall comply with all applicable federal, state, and local environmental regulations, including Florida Department of Environmental Protection (FDEP) air permitting requirements and applicable landfill permit conditions. The CONTRACTOR shall be solely responsible for obtaining, maintaining, and complying with all permits, registrations, authorizations, and notifications required for its equipment and crushing operations, including any required equipment relocation notifications to FDEP. The CONTRACTOR shall be responsible for meeting all applicable regulatory deadlines and shall not mobilize equipment or commence crushing operations without satisfying the applicable permitting and notification requirements. Santa Rosa County shall not be responsible for preparing, submitting, reviewing, or managing the CONTRACTOR's permits or regulatory notifications. The CONTRACTOR shall be solely responsible for maintaining compliance with applicable air quality requirements, including effective dust suppression during crushing, screening, loading, and stockpiling activities. Any regulatory violations, penalties, corrective actions, or associated costs resulting from the CONTRACTOR's equipment or operations shall be the responsibility of the CONTRACTOR, to the extent permitted by law. The County reserves the right to suspend operations when unsafe conditions, excessive dust, or apparent regulatory noncompliance are observed. Such suspension shall not relieve the CONTRACTOR of its compliance responsibilities. Site Safety and Traffic Control The CONTRACTOR shall comply with all applicable OSHA requirements, County safety policies, and the Santa Rosa County Central Landfill Concrete and Masonry Crushing Operations Plan (Attachment B). The CONTRACTOR shall be responsible for maintaining a safe working environment for its employees and for protecting County personnel, customers, and other individuals who may be present near the crushing operation. The CONTRACTOR shall maintain a site-specific safety plan, acknowledged by all employees assigned to the project, and make the plan available to the County upon request. The CONTRACTOR shall provide all necessary safety equipment, signage, barricades, and traffic control measures to maintain a safe work area. All crushing activities shall remain within the designated processing area. The CONTRACTOR shall coordinate equipment movements and material handling activities with County personnel to avoid obstructing landfill roads or interfering with normal landfill operations. Contaminants and Equipment Damage The County utilizes trained and certified personnel to inspect incoming waste loads and identify prohibited materials. However, the County does not guarantee that stockpiled concrete and masonry materials are free of embedded reinforcement, metal, or other potentially damaging materials. The CONTRACTOR shall be responsible for inspecting material prior to processing and identifying, separating, and removing reinforcement steel, wire mesh, oversized metal, and other unsuitable or potentially damaging materials before they enter the crushing equipment. The CONTRACTOR shall assume all risk of damage to its equipment resulting from foreign objects, contaminants, embedded materials, or other unsuitable materials encountered during crushing operations, including damage resulting in equipment failure or extended downtime. The County shall not be responsible for equipment repairs, replacement parts, lost production, downtime, or any additional costs resulting from such damage. No additional compensation or adjustment to the CONTRACTOR's unit prices shall be permitted for these circumstances. Materials separated and rejected by the CONTRACTOR shall be placed in a designated area for disposal by the County. Spill Prevention and Housekeeping The CONTRACTOR shall maintain all equipment in good working condition and take appropriate measures to prevent fuel, oil, hydraulic fluid, and other hazardous material spills or releases during crushing operations. The CONTRACTOR shall provide and maintain adequate spill containment and cleanup equipment on-site throughout each crushing event, capable of containing the largest reasonably foreseeable spill associated with its equipment, fuel storage, or operations. All spill response equipment and materials shall be provided at no additional cost to the County. Any portable fuel storage tanks or fueling equipment brought onto County property shall comply with all applicable federal, state, and local regulations. Fuel storage tanks shall be double-walled and equipped with appropriate secondary containment, spill prevention, and overfill protection measures. Fueling operations shall be conducted in a manner that prevents releases to soil, surface water, and stormwater drainage systems. The CONTRACTOR shall be solely responsible for immediately containing, reporting, cleaning up, and properly disposing of any spills or releases resulting from its equipment or operations, including all associated remediation costs and regulatory requirements. The CONTRACTOR shall maintain the processing area in a clean and orderly condition, properly manage waste materials, and remove all equipment, supplies, and debris associated with its operations upon completion of each crushing event. Measurement and Payment Payment for routine concrete crushing services shall be based on the tonnage of eligible concrete and masonry received and recorded through the County's certified landfill scales during the applicable accumulation period. The County's scale records shall serve as the primary basis for determining payable quantities. The accumulation period shall generally begin following the previous crushing event and end at the beginning of the next scheduled crushing event. The CONTRACTOR may provide crushing equipment scale records for comparison or verification purposes. However, quantities recorded by the CONTRACTOR's equipment shall not automatically establish the amount eligible for payment, as such measurements may include incidental soil, previously processed material, or material passing through the equipment more than once. In the event of a discrepancy between the County's certified scale records and the CONTRACTOR's equipment measurements, the County and CONTRACTOR may review the records and mutually agree to an adjusted payable quantity, including averaging the two measurements when appropriate. Any adjustment shall require approval by the Environmental Manager or designee. Material previously paid for, excluded from processing, or not processed during the authorized crushing event shall not be included in the payable quantity. Alternative measurement procedures for emergency or special crushing events shall be governed by Section 1.14. The CONTRACTOR's unit prices shall include all costs associated with mobilization, demobilization, equipment, fuel, labor, dust control, environmental compliance, material handling, crushing, screening, metal separation, and finished material stockpiling. No additional compensation shall be provided unless specifically authorized in writing by the County. Emergency or Special Crushing Events – Alternative Measurement In the unlikely event that certified landfill scale records are unavailable or unsuitable for determining payable quantities during an emergency or special crushing event, the County may authorize an alternative method of measurement. This provision is intended solely for unusual circumstances and shall not apply to concrete and masonry materials routinely received, weighed, and stockpiled at the Central Landfill as part of normal operations. Routine cr Source: OpenGov https://procurement.opengov.com/portal/santarosafl/projects/322815 Canonical URL: https://govcontractfinder.com/contracts/clean-concrete-masonry-crushing-services-opengov-4576-project-322815