Construction Manager at Risk (CMAR) Agreement for Greenwood Lakes Water Reclamation Facility Critical Storm Vulnerability and Class I Reliability Improve Projects State and local opportunity open Seminole County PS-7464-26/HSM Posted: 2026-11-17T17:00:01.559Z Response deadline: 2026-12-16T19:00:00.000Z The County is soliciting proposals from qualified Construction Manager at Risk (CMAR) firms to provide preconstruction and construction management services for the Greenwood Lakes Water Reclamation Facility Critical Storm Vulnerability and Reliability Improvements projects (Projects). The operational facility receives wastewater from the County’s Northeast Service Area, as well as portions of Longwood and Lake Mary, and is rated to treat 3.0 million gallons per day, annual average daily flow. Scope of Work The County will select a single Consultant in accordance with the provisions of the Consultants’ Competitive Negotiation Act (CCNA), Section 287.055, Florida Statutes. Authorization for performance of professional services by a single Consultant under this project will be in the form of a written Work Order issued by the County. Description of Services The County is soliciting proposals from qualified CMAR firms to provide preconstruction and construction management services for two projects: the Critical Storm Vulnerability Improvement Project and the Class I Reliability Project. Project 1 and Project 2 are separate and distinct projects. The successful respondent(s) shall treat both projects as separate, unequal projects. The successful respondent(s) shall use an open book approach to both Project 1 and Project 2, providing separate Guaranteed Maximum Price (GMP) quotes at the times required by the County, each of which is known as a project “Bidding Budget.” These will become the fixed cost for the completion of the construction for the project with full disclosure of actual costs to the County. Pending a technical evaluation by the Engineer(s) of Record (EOR), the projects may include the following elements but are subject to change: Project 1 Critical Storm Vulnerability Improvements Project 1 will be partially funded through the 2025 Clean Water State Revolving Fund Supplemental Appropriation for Hurricanes Helene and Milton (Agreement to be provided when available) and therefore subject to certain federal provisions, such as American Iron and Steel, Davis Bacon, and completion deadlines. Primary Components: Replace equalization tank and pumping station. Replace backup generator Ancillary improvements such as electrical, instrumentation, control and site work. Replace pretreatment structure (including grit removal and coarse screening) Demolition of existing structures. Schedule: All reimbursable Project 1 activities must be completed by December 15, 2029 with reimbursement requests submitted to the FDEP no later than 1/31/2030. This will require that all pay requests be submitted to the County staff no later than 1/15/2030. It is anticipated that an engineer of record (EOR) will complete 30% design by March of 2027 at which time CMAR will initiate preconstruction services. In order to meet the final completion schedule for this funding, bidding documents must be submitted to FDEP in December of 2027. Project 2 Class I Reliability Improvements Primary Components: Construct a secondary clarifier. Construct a belt filter press. Construct a compact disk filter unit. Construct a chlorine contact chamber (CCC). Construct sludge holding tanks. Schedule: Project 2 will be initiated after Project 1 and will not be subject to federal funding requirements. It is anticipated that the pre-construction duration will last 12-18 months with final construction expected to be 18-20 months. General The selected CMAR shall coordinate with County staff and the EOR(s) in confirming requirements of each project, evaluating constructability during design phase, and preparing cost and schedule information. Preconstruction services are expected to include: Pre-bid conferences and pre-award meetings Constructability reviews Cost estimating Schedule development Value engineering Risk mitigation Site logistics planning Subcontractor procurement Bid package development Coordination of Owner-supplied materials and equipment Preparation of open-book GMP’s as requested by the County Meeting with neighboring community During construction, the CMAR will: Coordinate with County’s plant operations Manage all on-site construction activities including means, methods, techniques, sequences and procedures Construct the Work per the approved construction Contract documents and applicable laws Follow project procedures to track, expedite, and process all submittals Receive and manage equipment and materials Construction of temporary facilities and utilities if needed Conduct construction progress meetings Project Surveying Field locate all utilities in the immediate area of proposed work using subsurface utility engineering (SUE) methods Manage stormwater and airborne particulate Coordinate trade contractors Maintain project cost and schedule controls using generally accepted accounting principles and FDEP and SRF requirements, if any Obtain construction-related permits as required, and coordinate and schedule the requisite inspections Oversee safety and quality control, as well as site security Maintain project records and as-built documentation Traffic Maintenance and any required MOT Correct deficiencies Ensure compliance with federal provisions where applicable Complete all construction phase services and work and conduct startup, commissioning, and performance testing Provide closeout documentation through final project completion including pre and post construction, as well as progress photos and video It should be noted that pay requests for Project 1 may require the itemized statements of values for pay requests. The selected CMAR, who must be a licensed general contractor, will work in close collaboration with County, the EOR(s) and key stakeholders to deliver the facility improvements without adversely impacting the active wastewater treatment operation. Proposals must clearly demonstrate the qualifications and relevant experience of both the firm and the proposed construction management team, with an emphasis on successful delivery of comparable utilities treatment plant projects using the Construction Manager at Risk delivery method. All portions of the Projects shall be competitively bid. The CMAR shall obtain sealed bids from subcontractors, vendors, consultants and suppliers. The bids will be opened by the CMAR in the presence of County staff. The CMAR shall submit to the County a written “Construction Market Analysis and Prospective Bidders Report” setting out recommendations and providing information as to prospective bidders. Prior to submission to bidders, as various bid packages are prepared for bidding, the CMAR shall submit to the County and EOR a list of potential bidders. The CMAR shall stimulate bidder’s interest in the local marketplace and identify and encourage bidding competition. The County reserves Introduction Summary Background Contact Information Timeline Instructions to Proposers Contact All prospective Proposers are hereby instructed not to contact any member of the Seminole County Board of County Commissioners, the County Manager or Deputy Manager, or any Seminole County Staff members other than the noted Purchasing & Contracts Division (herein referred to as ‘PCD’) Contact Person, PCD ADMIN , regarding this PS or their written proposal at any time prior to the posting on the COUNTY’s Website of the recommendation and intent to award by County staff for this project. Any such contact shall be cause for rejection of your proposal. Interpretation of this clause will be solely at the discretion of the County. Pre-Proposal Conference There will not be a Pre-Proposal Conference for this solicitation. Public Opening Electronic submittals shall be received by PCD online in accordance with the instructions in this solicitation document, unless otherwise revised via posted Addenda. Persons with disabilities needing assistance to participate in the Public Opening should call the noted PCD Contact Person at least forty-eight (48) hours in advance of the Public Opening at (407) 665-7116 . Delays The COUNTY, at its sole discretion, may delay the scheduled due date and time for submission if it is to the advantage of the COUNTY to do so. The COUNTY will post all changes in the scheduled due date and time for submission by written addendum posted to the COUNTY’s Website: https://secure.procurenow.com/portal/seminolefl Proposal Submission and Withdrawal The COUNTY will accept submittals electronically via the COUNTY’s e-Procurement Portal until 2:00 pm on Wednesday, December 16, 2026 . Proposals received after the scheduled due date and time for submission shall not be considered. Proposals submitted in any other format other than via the COUNTY’S e-Procurement Portal, including but not limited to, hard copy (mailed or hand delivered), facsimile, or emailed submittals, will not be accepted or considered. The scheduled due date and time for submission will be scrupulously observed. Companies shall register on the COUNTY’S e-Procurement Portal. Once registered, Companies may view and click "Follow" to be a prospective bidder for this solicitation and will appear on the Follower’s list. Companies that fail to Follow this project will not receive automatic addenda notifications, nor will they be able to draft a response in the COUNTY’S e-Procurement Portal, and therefore will be unable to participate or be considered for this PS. If a Proposer encounters technical difficulties using the COUNTY’S e-Procurement Portal, or needs assistance using the Portal, Proposers may access the Help Center for vendor training guides provided by OpenGov-Procurement, the Software Administrator. Proposers may also contact the Software Administrator using the real-time chat function on the COUNTY’S e-Procurement Portal (located in lower right-hand corner of the screen), or via email at support@procurenow.com for support. The COUNTY will not be responsible for untimely submissions due to personal or company internet or hardware limitations, settings or restrictions, internet speed, power outage, network connection, or use of a malfunctioning electronic device, or the like, neither the COUNTY, nor the Software Administrator, will be held responsible. Companies shall be solely responsible for ensuring the capability of their computer system while responding to this solicitation, and for the stability of their internet service. Uploading large documents may take significant time depending on the size of the file(s) and the Internet connection speed that the Respondent representative is using to submit a response. Failure of the Respondent to successfully submit an electronic proposal before the deadline indicated herein shall be at the Respondent’s sole risk, and no relief will be given for late and/or improperly submitted proposals. Once file(s) have been uploaded and the Submission Status shows as “Submitted” the submission is complete. At that point, the Respondent representative who is registered with the COUNTY will also receive an email confirmation from the COUNTY’s e-Procurement Portal. Telephone confirmation of timely receipt of any submittal should be made by calling (407) 665-7116 , before the 2:00 pm deadline. The Proposer is required to submit ONE (1) ELECTRONIC FORMATTED file of their complete written submittal. Proposers may withdraw their submittal electronically via the COUNTY’S e-Procurement Portal at any time prior to the scheduled due date and time for submission. Inquiries All Proposers should carefully examine the PS documents. Any ambiguities or inconsistencies shall be brought to the attention of PCD Contact Person in writing via the Q&A tab in the COUNTY’S e-Procurement Portal prior to the scheduled due date and time for submission. Failure to do so, on the part of the Proposer, shall constitute an acceptance by the Proposer of any subsequent decision made by the COUNTY. Any questions concerning the intent, meaning and interpretations of the PS documents including the attached Draft Agreement , shall be requested in writing, and received no later than 5:00 pm on Monday, December 7, 2026 . Written requests shall be submitted via the COUNTY’S e-Procurement Platform The COUNTY will not be responsible for oral instructions made by employees of the COUNTY or its authorized representatives in regard to this PS. If the Q&A deadline has passed, a Proposer may contact the COUNTY directly if necessary at pcdadmin@seminolecountyfl.gov . The COUNTY reserves the right to reject any questions sent after the Q&A deadline . Addenda Should revisions to the PS documents become necessary, the COUNTY will post Addenda information on the COUNTY's e-Procurement Portal. The COUNTY’s e-Procurement Portal will issue an automated email notification to all “Followers” on the PS’s Followers list. All Proposers should check the COUNTY's Website or notify PCD ADMIN to verify information regarding Addenda. Failure to do so may result in rejection of the Proposer’s submitted proposal and a determination as “Non-Responsive”. By execution of the Formal Notice for this PS, the Proposer acknowledges receipt of all Addenda issued under this solicitation. Addenda information will be posted on the COUNTY’s Website ( https://secure.procurenow.com/portal/seminolefl ). It is the sole responsibility of the Proposer to ensure that they obtain information related to any Addenda. Selection Process and Award All proposals will be reviewed by personnel as designated by the COUNTY staff in accordance with the qualification/evaluation criteria set forth in the PS documents. The qualifications of the Proposers are rated and ranked in order of preference, based on their qualifications and evaluation criteria. Interviews and/or presentations will be part of the evaluation process. Presentations and interviews must comply with the State of Florida’s Sunshine and Public Records Laws (Section 286.0113, Florida Statutes). The COUNTY will not be liable for any costs incurred by the Proposer in connection with such presentations. The County will award a contract based on the proposal that bests meets the County's requirements, that would provide the best service to the public, and would provide a high return to the County. The Proposer understands that this PS does not constitute an agreement with the Proposer. The COUNTY reserves the right to reject all proposals, make multiple awards (award to more than one vendor), to waive formalities, to re-solicit and advertise for new proposals, or to cancel the project in its entirety. Proposal Preparation Costs Neither the COUNTY nor its representatives shall be liable for any expenses incurred in connection with preparation of a response to this PS. Proposers should prepare their proposals simply and economically, providing a straightforward and concise description of the Proposer's ability to meet the requirements of this PS. Accuracy of Proposal Information By submission of a proposal, Proposer acknowledges that they have carefully examined the Request for Professional Services documents and agrees to furnish the services specified in the solicitation as proposed. Proposers agree that their proposal will remain firm for a period of up to one hundred twenty (120) days to allow the County adequate time to evaluate the submittals. By submission of a proposal, Proposer agrees to abide by all conditions of this proposal and understands that a background investigation may be conducted by the Seminole County Sheriff’s Department prior to award. Proposer certifies that all information contained in their proposal is truthful to the best of their knowledge and belief. Proposer further certifies that they are duly authorized to submit this proposal on behalf of the vendor/Proposer as its act and deed and that the vendor/Proposer is ready, willing and able to perform if selected. Insurance A misstatement or omission of a material fact, whether intentional or not, regarding the Proposer's insurance coverage, policies or capabilities may be grounds for rejection of the Proposer’s submitted proposal and rescission of any ensuing Award Agreement. The COUNTY recommends that all Proposers review the insurance requirements listed within the Draft Agreement with their insurance carriers. A copy of the insurance certificate shall be furnished to the COUNTY prior to the final execution of the COUNTY’s Award Agreement. The COUNTY reserves the right to reject the award to any Proposer that fails to provide the insurance as required within the COUNTY’s Award Agreement. Licenses Proposers, both corporate and individual, must be fully licensed and certified for the type of work to be performed in the State of Florida at the time of submittal under this PS. Failure of the Proposer to be fully licensed and certified, will result in rejection of the Proposer’s submitted proposal and will be considered “Non-Responsive”. Any permits, licenses, or fees required shall be the responsibility of the Proposer. No separate or additional payment will be made for these costs. Adherence to all applicable code regulations, Federal, State, County, City, etc., is the responsibility of the Proposer. All final plans and documents prepared by the Consultant must bear the endorsement of a person that is full employ of the Consultant and currently registered as a professional for the services in the State of Florida. Posting of the Recommendation and Intent to Award for the PS The recommendation and intent to award for this PS will be posted on the COUNTY’s Website https://secure.procurenow.com/portal/seminolefl . Failure to file a protest with the COUNTY’s Purchasing & Contracts Manager within the time prescribed in the COUNTY's Purchasing Code, Policies and Procedures shall constitute a waiver of proceedings. Public Records Upon recommendation and intent to award this PS as posted to the COUNTY’s website or thirty (30) calendar days after closing, proposals are considered “public records" and shall be subject to the public disclosure regulations consistent with Chapter 119, Florida Statutes. Proposers must invoke the exemptions to disclosure provided by law in their response to the solicitation and must identify the data or other materials to be protected by uploading any information deemed confidential separately under “Confidential Files," and must state the reasons why such exclusion from public disclosure is necessary pursuant to the COUNTY’s, “Compliance With Public Records Law” Form, which is required as part of the PS documents. Ownership of all data, material, and documentation originated and prepared for the County pursuant to the PS shall belong exclusively to the County and be subject to public inspection in accordance with the Public Records Law. Trade secrets or proprietary information submitted by a Proposer shall not be subject to public disclosure under the Public Records Law; however, the Proposer must invoke the protection of this section prior to or upon submission of the data or other materials and must identify the data or other materials to be protected and state the reasons why protection is necessary. By executing this Contract, the Contractor hereby certifies that it understands and agrees that all books, records, and accounts related to the performance of this Contract shall be subject to the applicable public records provisions of Chapter 119, Florida Statutes. As such, all books, records, and accounts created by the Contractor, or provided to the Contractor pursuant to this Contract, are public records and the Contractor agrees to assist the County in compliance with any request for such public records made in accordance with Chapter 119, Florida Statutes. IF T Source: OpenGov https://procurement.opengov.com/portal/seminolefl/projects/322235 Canonical URL: https://govcontractfinder.com/contracts/construction-manager-at-risk-cmar-agreement-for-greenwood-la-opengov-4072-project-322235