Construction Manager at Risk (CMAR) for Projects less than $4 Million State and local opportunity open City of Cape Coral, FL 2026-RFP-PW-061-KR Posted: 2026-10-26T11:30:01.115Z Response deadline: 2026-12-09T19:00:00.000Z The City of Cape Coral was incorporated in 1970 and operates under the Council/City Manager form of government. The City Council has eight members consisting of the mayor and seven members all elected at large on a nonpartisan basis. City Council is responsible for all policy-making functions of the government and retains the services of a City Attorney, City Auditor and City Manager. The City Manager is responsible for all administration of the City, which provides a comprehensive range of municipal services including general government, public safety, community services, public works, planning, utilities, and parks and recreation. Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. Technical Specification or Scope of Work Scope of Work The City is requesting Proposals from interested firms to provide Construction Manager at Risk (CMAR) services, for various types of projects less than $4,000,000.00 in construction cost on an as-needed basis. The City intends to select a pool of Construction Managers for the contract(s); however, there is NO guarantee that all will receive work. The types of projects are: new construction, renovation, demolition, site work, interior/exterior renovations, underground utility projects, road construction and mitigation projects. If awarded, the City intends to award projects individually to the applicable selected firm or firms based on experience, availability and license(s) to perform the work in accordance with Florida Statues. The CMAR will be required to have the licensing to perform one or more of these types of projects. During the Pre-construction Phase the CMAR will assist the City and design professional(s) to determine buildability, provide input, value engineering, and advise means or methods of potential cost savings to the City. The CMAR will complete the Construction Phase by the utilization of subcontractor’s qualified, experienced and licensed companies/contractors who specialize in the various areas covered in the scope of the project. The Construction Phase will be inclusive of obtaining necessary permits, the selection and subcontracting of companies/contractors for goods and services that bring quality, economic benefits and value engineering to the City. NOTE: For projects with an estimated value exceeding $1,000,000, the City reserves the right, at its sole discretion, to solicit proposals from multiple firms within the pool. Section 1. TERM OF AWARD Award will be made to the most responsible and responsive proposer(s) based on the evaluation criteria. The City intends to award a pool of proposers. If awarded, the terms of this solicitation shall be in effect for two (2) years with three (3) one (l) year renewal periods upon mutual written agreement of both parties. Section 2. PROJECT MANAGEMENT INFORMATION SYSTEMS (PIMS) The CMAR shall use its own PMIS to collect, organize, and distribute project information (including schedules, submittals, RFIs, daily reports, change orders, and pay applications). The City will not select, purchase, or pay for the CMAR's PMIS or any user licenses, subscriptions, or training. The CMAR shall give the City Representative and designated City staff full viewing access at no cost for the life of the project. At Final Completion, the CMAR shall deliver a complete project record in PDF and native format, including closeout documents, as-builts, warranties, and a final schedule. Section 3. OTHER RESPONSIBILITIES Other responsibilities include, but are not limited to: value engineering, construction reviews, advertising/bidding projects, pre-bid conferences, pre-construction meetings and other phases of the procurement process. The CMAR shall provide professional staff for construction oversight, superintendents, inspectors, and other supervisory and office support staff throughout the completion of project(s). Project may not exceed $4,000,000 in construction. Construction Manager may be engaged for the project during the design phase. Some projects may require security clearance at the awarded Contractor’s expense. Section 4. PROJECT OBJECTIVE 4.1 In selecting a Construction Manager at Risk (CMAR), the City will place emphasis on the experience of the Proposer and its assigned personnel in providing services on projects of similar nature and size. 4.2 During the Pre-construction Phase, the selected Proposer shall cooperate with City staff, and the Design Professional teams: 4.2.1 To develop an optimum, minimum risk, and buildable design for the Project(s); 4.2.2 To review and evaluate throughout this phase the design, as necessary, for constructability; 4.2.3 Value engineering, as necessary, of the construction documents to ensure that the cost to construct will be achieved within the available construction budget; 4.2.4 Develop Guaranteed Maximum Price based on the final permitted construction documents and specifications. 4.3 During the Construction Phase, the CMAR shall: 4.3.1 Successfully complete the Project in accordance with the Construction Contract Documents and within the Guaranteed Maximum Price (GMP); 4.3.2 Provide and maintain adequate staff to oversee and manage the construction throughout the construction phase of these projects; Provide a construction team for each site (at a minimum: Project Manager, Superintendent) 4.3.3 Successfully complete the construction within the approved construction schedule; 4.3.4 Comply with the CMAR contract documents and its general conditions. 4.4 Phases: This project will consist of two phases. Pre-Construction Phase and Construction Phase 4.5 Pre-construction Phase: 4.5.1 Prime Goal: During the Pre-construction Phase, the CMAR shall assist the City and the Design Professional (DP) in developing an optimum, minimum risk and buildable design for the Project(s). During the Pre-construction Phase, the CMAR shall assist the City and the DP in developing a buildable design for the Project that meets the City's needs and is within the portion of the City's Project Budget available for construction. During the Pre-construction Phase, the CMAR may be paid a Preconstruction Phase Services Fee. 4.5.2 Services: The CMAR shall meet with the City to determine the schedule of meetings and the work required to provide value engineering. Services provided during the Preconstruction Phase of the project should include, but not limited to: a. Consulting with, advising, assisting, and making recommendations to the City and the DP. b. Reviewing all plans and specifications as they are being developed and making recommendations with respect to construction feasibility, availability of material and labor, and time requirements for procurement and construction. c. Projected costs; developing, reviewi Legal Notice- RFP - CCNA The City of Cape Coral, Florida, using a Qualified based selection process, is seeking proposals for Construction Manager at Risk (CMAR) for Projects less than $4 Million , in accordance with 2026-RFP-PW-061-KR , in the State of Florida. A copy of the Request for Proposal (RFP) Documents may be obtained online at https://procurement.opengov.com/portal/capecoralfl . Register to receive notifications of future opportunities and to view current solicitations. This Competitive Solicitation closes on Wednesday, December 9, 2026 , at 2:00 pm . The time indicated on the OpenGov System is considered the official time. Once the Due Date and “Time Remaining" count down has expired, OpenGov will no longer permit responses to be submitted. It is the responsibility of the Supplier to ensure all responses are submitted on time, through the OpenGov System, by the Due Date. The City reserves the right to reject any or all proposals, award in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. The Legal Entity Name of proposer must be provided on the proposal submittal and all proposal form documents that are being submitted for the proposed goods or services requested in this solicitation. The Legal Entity Name will be used when creating the proposed goods or services contract between the Awarded Firm and the City. Pursuant to Florida State Statute 119.071 (2) Sealed bids, proposals or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.071(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of intended decision or until 30 days after opening the bids, proposals, or final replies, whichever is earlier. All proposals are to be submitted through the OpenGov System at the following link: https://procurement.opengov.com/portal/capecoralfl By Order of the City Manager Kimberly Bruns, City Clerk MMC Released Date: Monday, October 26, 2026 Definitions Included in this section is a list of all definitions utilized by the City. Not all definitions will be utilized or apply to every solicitation issued. Definitions Addenda are issued electronically prior to the closing of solicitations which clarify, correct, or change the solicitation Requirements of the Contract Documents. Additional Services : The term “Additional Services” shall refer to such services as the City may request and authorize, in writing, that the Supplier or Program Manager (PM) perform relative to an Agreement which has not been identified in the original Scope of Services. Additional services shall be authorized by the execution of both Parties of an Agreement as a "Change Order", "Amendment" or "Work Authorization" when Work Authorizations apply. Agreement : The written contract between City and Contractor covering the work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. City Design Professional for this solicitation shall hereafter refer to City and/or City’s Engineering staff. Change Order : A written document recommended by the City Representative and signed by the City and the CMAR that authorizes an addition, deletion, or revision in the work, or an adjustment in the GMP or Contract Time. City: Shall be understood as referring to the City of Cape Coral, Florida. City Representative : The term “City Representative” shall mean the person designated by the City (or their designee) to act on the City’s behalf with respect to the Program or Project and be the primary point of contact. Construction Documents : The term “Construction Documents” shall mean the written specifications, design drawings and other specified documents that provide the requirements of construction provided under an agreement or Work Authorization. Construction Manager at Risk: Provider of Services, can also be referred to as Consultant, Proposer, FIRM, Consultant, Contractor or Awarded Firm. Contract Administrator : Wherever in the Contract the word “Contract Administrator” is used it shall be understood as referring to the Contract Administrator of the Owner, acting personally or through any assistants duly authorized in writing for such by the Owner. Contract Documents are the agreement, Addenda, Contractor’s response, except when it conflicts with any other contractual provision, the Notice to Proceed, the Bonds, this solicitation Package, these General Conditions, the Specification and Drawings, any Special Conditions, together with all Written Amendments, Change Orders, Work Change Directives or Field Orders. Contract Duration : The term “Contract Duration” shall mean the for agreed upon calendar days that are specified in the agreement or Work Authorizations. Can also be referred to as “Contract Time”. Contract Price is the monies payable by the City to the Contractor for completion of the work in accordance with the Contract Documents as stated in the Agreement or Work Authorization. Contract Time is the number of calendar days or the dates stated in the Agreement or Work Authorization. Contractor: Shall be understood as referring to the individual, corporation, or partnership whose name appears on the Contract. Days : As used in this Agreement, the term “days” means calendar day unless expressly stated otherwise Effective Date of the Agreement is the date indicated in the Agreement or Work Authorization on which it becomes effective, but if no such date is indicated it means the date on which the Agreement or Work Authorization is signed by the last party. Facility : The term “Facility” is defined as any City owned property. Final Completion : The term “Final Completion” is defined as the point when the full scope of work associated with any agreement or Work Authorization (WA) has been fully completed. Guaranteed Maximum Price : The term “Guaranteed Maximum Price (GMP)” is defined as the maximum amount the City will pay for the Cost of the Work, the CM Fee, and the contingency for a Work Authorization, as proposed by the CMAR and accepted by the City in writing. MBE/WBE/SBE: Minority Business Enterprise/Women Business Enterprise/Small Business Enterprise. A certified minority business enterprise is defined by Florida Small and Minority Business Assistance Act of 1985. If applicable, the primary proposing firm should submit the Certified Minority Business (MBE – Minority Business Enterprise/WBE - Women Business Enterprise/ SBE – Small Business Enterprise) certification documentation. Notice to Proceed : The term “Notice to Proceed (NTP)” is defined as written notification by the owner or representative to start work and establishes the commencement of time for the agreement or Work Authorization (WA). Owner : Wherever in the Contract Documents the word “ Owner ” is used it shall be understood as referring to the City. Quote: The offer or proposal of the quoter setting forth the prices for the work to be performed or goods to be purchased. Also referred to as “e-bid” or electronic quote. Respondent or Responder: The term "Respondent" or "Responder" refers to the submitting party that submits a bid, proposal or quote in response to a solicitation. Response: The term "Response" shall refer to the submitting party's reply to the solicitation issued. RFP: Request for Proposal. Services : The term “Services” refers to the scope of work listed in the Contract Documents and Exhibits. Solicitation: The term "Solicitation" shall refer to an Invitation to Bid, a Request for Proposal, a Request for Qualifications, a Formal Quote, or any other request that is issued through the OpenGov system. Subcontractor : as employed herein, includes only those that have a direct contract with the Consultant or Contractor and it includes one who furnishes material worked to a special design according to the plans and specifications of this work, but does not include one who merely furnishes material not so wor General Terms & Conditions LEGAL ENTITY The Legal Entity Name of the Respondent must be provided on the respondent's submittal and all documents that are being submitted for the proposed goods or services requested in this solicitation. The Legal Entity Name will be used when creating the proposed goods or services contract between the Awarded Firm and the City. SOLICITATION OVERVIEW NOTICE IS HEREBY GIVEN that the City of Cape Coral, Florida is issuing this Solicitation through its electronic procurement system. All documents and items included in the electronic Solicitation are incorporated herein by reference. B y submitting a response, the Respondent agrees to comply with all Terms and Conditions contained herein. In the event of a conflict between this Solicitation and City ordinances or applicable law, such ordinances and laws shall prevail. The Legal Entity Name of the Respondent must be provided on all submission documents and will be used in any resulting contract. TERM The term of any agreement resulting from this Solicitation. Unless otherwise stated, shall remain in effect until the agreed upon final completion and fulfillment of all contractual obligations. CONTRACT The City of Cape Coral will require the awarded firm (s) to execute written contract (s) prior to the issuance of a purchase order. A Sample Agreement has been included for reference and is subject to change. PROPOSAL REQUIREMENTS AND REVIEW CRITERIA Respondents shall submit their responses to this solicitation via the electronic procurement portal (OpenGov). Responses must be submitted electronically by the time and date in the Solicitation. Proposals must be submitted by an authorized representative of the firm. The person submitting this proposal represents and warrants that he or she is duly authorized and has legal capacity to do so on the company’s behalf. All information requested must be submitted. Failure to submit all information may result in a lower evaluation of the proposal. Submittals which are substantially incomplete or lack key information may be rejected at the CITY’s discretion. The selection of short-listed firms will be based on the information provided in the submittal. Information submitted should include documentation to demonstrate your firm’s qualifications and abilities to provide the scope of services. The submittal should include sufficient information to present a clear understanding of this project and of similar past projects, staff experience and abilities, and any other additional, pertinent details to describe the team’s capabilities. Submittal should follow the format as described in the Evaluation Criteria of the Specification. INTERPRETATIONS/QUESTIONS All questions about the meaning or intent of the Solicitation Documents shall be submitted through the City’s designated electronic procurement portal (OpenGov) by the date and time stated in the solicitation. Interpretations or clarifications of the Solicitation Documents shall be issued by written addendum only and posted through the electronic procurement portal. Respondents may rely only on written addenda issued by the City. By submitting a response, the Respondent acknowledges receipt of and responsibility to review all addenda related to the Solicitation. NO ADDENDA WILL BE ISSUED WITHIN FIVE (5) BUSINESS DAYS PRIOR TO THE SUBMISSION DEADLINE, UNLESS AN ADDENDUM HAS BEEN ISSUED EXTENDING THE DEADLINE. LOBBYING All firms and their agents who intend to submit, or who have submitted, responses for this project are hereby placed on formal notice that neither City Council Members, candidates for City Council, members of the Selection Advisory Committee (SAC), nor any employee of the City of Cape Coral are to be lobbied either individually or collectively concerning this project. Contact should only be made through regularly scheduled Council meetings, SAC meetings scheduled for interviews and/or negotiations, or meetings scheduled through the Procurement Division, which are for the purposes of obtaining additional, or clarifying information. Any action, to include dinner or lunch invitations, by a submitting firm that may be interpreted as being within the purview of this requirement shall result in an immediate disqualification from further consideration in this project EXAMINATION OF SOLICITATION DOCUMENTS Before submitting a response, each Respondent shall carefully examine the Solicitation Documents and become familiar with all requirements that may affect cost, schedule, or performance. Resp Source: OpenGov https://procurement.opengov.com/portal/capecoralfl/projects/300122 Canonical URL: https://govcontractfinder.com/contracts/construction-manager-at-risk-cmar-for-projects-less-than-4-m-opengov-658933915-project-300122