Construction of the Washington Street Roadway Improvements FPID NO. 447711-1-54-01 State and local opportunity open City of New Smyrna Beach 04-26-ENG Posted: 2026-10-16T12:00:22.991Z Response deadline: 2027-01-13T19:00:07.334Z The City of New Smyrna Beach, in conjunction with New Smyrna Beach Utility (NSBU), is seeking sealed bids from qualified and licensed Contractors for the Construction of the Washington Street Roadway Improvements FPID NO. 447711-1-54-01 . Additional information is provided in Section IV of this document. All required documents shall be completed and submitted through the City's eProcurement Portal. Project Specific: Roadway Improvements Project Description The City of New Smyrna Beach, Florida is soliciting 04-26-ENG , Construction of the Washington Street Roadway Improvements FPID NO. 447711-1-54-01 to select a qualified Contractor for the proposed roadway, drainage, utilities, and streetscape improvements. This project involves renovating a section of Washington Street between US 1 (N. Dixie Freeway) and Riverside Drive in New Smyrna Beach limits for approximately 1,766 LF. The improvements consist of roadway milling & resurfacing along Washington Street and adjacent side streets, new stormwater inlets and pipes, 7-foot wide sidewalks on both sides with ADA curb ramps, driveway reconstruction for residential and businesses, curb & gutter, signage & striping, street lighting, landscaping and streetscape items to enhance the corridor appeal. One traffic loop (Volusia County) must be reconstructed on the west end at the US 1 (N. Dixie Freeway) intersection. Additional parallel parking spaces will be added at the east end of the project, near the intersection of Riverview Drive. Utilities work to include construction of approximately 2,135 linear feet of 8" water main, 180 linear feet of 10" water main, removing the overhead power and communication lines, and installing power and communication conduits underground along Washington Street. The work will be performed within the existing Washington Street right-of-way. The City has executed permanent Easements and Right-of-entry (ROE) agreements for construction access with the adjacent property owners, allowing for minor grading to secure slope tie-downs and back of sidewalk drainage pipes at two locations. The Contractor’s implementation of Maintenance of Traffic (MOT) phasing will be critical during construction to minimize the impact on existing residents and local traffic. Washington Street corridor is one of two major connector roads to the beachside community and serves as a hurricane evacuation route. The other is State Road 44 to the South. Scope of Work The Contractor will be responsible for construction of the proposed roadway improvements in accordance with latest FDOT Standard Plans Indexes and Roads & Bridge Specifications, MUTCD & ATSSA guidelines, for MOT, material testing, drainage improvements, maintaining stormwater pollution prevention devices, pavement markings & signage, site restoration work, and NSBU Utilities Standards. The Contractor will also be required to provide administrative services including reports with ongoing project schedule updates, adherence to all agency permit conditions included within the bid documents, secure and coordinate all laydown/storage areas needed to facilitate deliveries and extended storage of materials, setup utility accounts and pay for temporary water/electric services, obtain and pay for City permits, either perform or retain a Geotechnical Engineer for vibration monitoring, submit all required FDOT documents within the specifications, submit and attain shop drawing approval for all roadway and utilities components, abide by OSHA requirements for construction workers, and provide close out documentation such as record drawings and certification of completion. Commencement of Work The bidder agrees to commence work within TEN (10) CALENDAR DAYS after the date of the Notice to Proceed letter and shall complete the work within FOUR HUNDRED FIVE (405) DAYS thereafter. The City understands that lead times are becoming an issue throughout the construction industry. Consideration for extensions will be made for documented delays on purchase orders and substantiated lead time provided by suppliers. Drawings Drawings are provided in the Attachment Section of this document and are incorporated by reference to the awarded agreement, which contains technical specifications for the work to be completed, in addition to drawings and other terms and conditions with which Contractor shall comply. The general character and scope of the work are illustrated by the drawings titled as follows: 04-26-ENG , Construction of the Washington Street Roadway Improvements FPID NO. 447711-1-54-01 CITY OF NEW SMYRNA BEACH, FLORIDA Checking of Drawings and Dimensions: The Contractor shall check all drawings and specifications immediately upon their receipt and shall promptly notify the Owner, in writing, of any discrepancies. The Contractor shall compare all drawings and verify the figures before laying out the work and shall be responsible for any errors, which might have been reasonably avoided thereby. When the type of equipment selected affects dimensions on the drawings, the Contractor shall adjust such dimensions as conditions may require to achieve the intent of the bid specifications. Copies of Drawings and Specifications Furnished: The Owner shall furnish to the Contractor an electronic file of drawings and specifications necessary for the execution of the work. One complete set of all drawings and specifications shall be maintained at the job site and shall be available to the Engineer at all times. Changes Compliance with Specifications and Drawings: All specifications and drawings and terms of the Contract shall be strictly complied with by the Contractor except as specifically provided in these Contract Documents. Changes in the Work: The Owner, without invalidating the Contract, may order extra work or make changes by altering, adding to, or deducting from the work. If applicable, the Contract total amount will be adjusted accordingly. All such work shall be executed under the conditions of the original Contract except that any claim for extensions of time caused thereby shall be adjusted at the time of ordering such changes. The value of any such extra work or change shall be determined in one or more of the following ways: (a) by contract unit prices or (b) by the actual cost of the extra work including revenue. As a result of the preceding requirements, a Change Order shall be prepared in a form to be approved by the Owner. The value of the extra work or change shall be determined at the time that the Change Order is authorized and agreed upon. In the event that the Change Order is of such nature as to fall under a Contract unit price, the Contract unit price shall be the value of such extra work, whether representing a deletion, or an addition, and method (b) or (c) shall be employed only if there is not an applicable Contract unit price. To the cost under (c), there shall be added a fixed fee to be agreed upon, but not to exceed fifteen percent (15%) of the actual cost of the work. The fee shall be compensation to cover the cost of supervision, overhead, bond, profit, and any other general expenses. It is the Contractor’s responsibility to notify this Surety of any changes affecting the general scope of the work or change in the Contact Price and the amount of the applicable Bonds shall be adjusted accordingly. The Contractor shall furnish proof of such adjustment to the Owner. No change orders that are a result of the Contractor's failure to reasonably anticipate any difficulties or complexities in the Project shall be the responsibility of Owner to pay. Clean-up The Contractor shall keep the construction site free of rubbish and waste materials and shall restore to it to its original condition or better those portions of the site disrupted by the construction. Clean-up and restoration shall be accomplished on a continuing basis throughout the contract period and in such a manner as to maintain a minimum of nuisance and interference to the Owner, residents, and works at or adjacent to the project site. The Contractor shall also remove, when no longer needed, all temporary structures and equipment used in his operations. It is the intent of this specification that the construction areas and those other areas not designed for alteration by the contract documents shall be restored to their original condition as nearly as possible. Existing Underground Utilities Representation of underground utilities is shown from information received from the various utility owners. The locations or elevations of utilities are not represented to be exact and are shown for the convenience of the Contractor. The Contractor shall contact the utility owner concerned for any available additional information and coordinate his construction activities accordingly. The utilities known to exist are listed in the Supplemental General Conditions, along with a list of their Owners. Review the SPECIAL PROVISION - Existing Utilities for Contractor’s responsibilities for utilities. Any cost incurred for the protection of and/or damages to existing underground utilities shall be considered as part of the applicable Contract price for stage excavation and backfill and no additional compensation shall be paid to the Contractor. If, in the judgment of the Engineer, it is impossible to construct a given improvement in the location shown on the drawings as a result of underground utility or utilities, either the utility owner shall move the existing underground utility, or an appropriate Change Order shall be executed for the relocation of the utility by the Contractor. The following is a list of utilities, which may be located within the public rights-of-way of the City of New Smyrna Beach: Gas Mains – Florida Public Utilities Company Electric and Power Lines and Underground Cable - New Smyrna Beach Utilities Telephone Lines and Underground Cable - AT&T Water Mains and Sanitary Sewers - New Smyrna Beach Utilities Storm Sewers - City of New Smyrna Beach, Florida Cable TV and Underground Cable - Charter Communications Inspection and Testing of Materials and Equipment If applicable, the Contractor shall pay for all laboratory or environmental tests required at the project site or all laboratory tests required on material already delivered to the site. Copies of test or certifications on pipe, brick or other materials made at the factory shall be furnished in triplicate to the Engineer. The Engineer shall approve test reports on equipment before the equipment covered by the test is delivered to the project site. Test requirements are set out in the detailed specifications for the particular material. Bid Bond The bid response shall be accompanied by a Bid Security of no less than ten (10%) percent of the amount of the Bid Proposal. Failure of the Bidder to supply same, in the amount and type required, shall automatically render the Bidder as non-responsive resulting in the disqualification from further consideration of their bid response. The Bid Security Bond shall be submitted in the form of a Bid Bond in the amount of ten (10%) percent of the total Bid price, made payable to the City of New Smyrna Beach, issued by a surety firm and through a reputable and responsible surety bond agency licensed to do business in the State of Florida. The surety must be rated as "A” or better as to strength by Best’s Insurance Guide, published by A. M. Best Company, Inc., located at 1 Ambest Road, Oldwick, New Jersey 08858. For the latest ratings and Insurance Guide, access www.ambest.com . In lieu of a Bid Bond, the Bidder may submit cash (U.S. currency only), money order, certified or cashier’s check drawn from a national or state bank whose deposits are insured by the Federal Deposit Insurance Corporation (FDIC), in the amount of ten (10%) percent of the total Bid price. Money orders and checks must be made payable to the City of New Smyrna Beach. The terms of the ITB Security Bond shall be: The Bidder shall enter into an agreement if awarded to the Bidder; The surety (or alternate form of security forfeit) shall be responsible for the costs resulting from the failure of the Bidder to enter into an Agreement if awarded to the Bidder; including the increased costs associated with awarding to the next most responsive, responsible Bidder and costs associated with conducting the Bid process and letting the agreement; To promptly enter into an agreement to perform the work and furnish the required Performance and Payment Bond, if applicable; and Any interest earned as a result of the City depositing the accepted money order, certified or cashier’s check, or cash received as bid security bond into an interest-bearing account, shall be retained by the City. A copy of the bid bond must be uploaded with the proposal response in the form of a Bid bond, certified funds or an irrevocable letter of credit in a sum equal to the amount of ten (10%) percent of the amount of the bid proposal. The contractor shall guarantee the total proposal price for a period of 90 days from the date of the proposal opening. If the contractor selects to submit a cashiers’ check or cash bond it must be received by the City no later than 2:00 pm on Wednesday, January 13, 2027 . Please submit in a sealed envelope to the following address: City of New Smyrna Beach 210 Sam's Avenue New Smyrna Beach, Florida 32168 Attention: Purchasing Department Return of Bid Security Bond: As soon as the bid responses have been evaluated, the City may, at its sole discretion, return or release the bid security bonds accompanying such bid responses, which in its sole judgment, would not likely be considered for award. All other Bid Security Bonds will be held until award of this project and the agreement has been executed by the successful Bidder; after which any remaining Bid Security Bonds will be returned to the respective Bidders. It shall be the sole responsibility of the Bidder to request in writing from the City the return of the Bid Security Bond or alternative form of security used. Bid Security Bond or alternative form of security used shall not be returned unless requested by the Bidder in writing. Public Notice Public Notice The City of New Smyrna Beach, Florida, is soliciting 04-26-ENG , Construction of the Washington Street Roadway Improvements FPID NO. 447711-1-54-01 to select a qualified Contractor for the proposed roadway, drainage, utilities, and streetscape improvements as well as extensive overhead to underground electric conversion from primary connection points to customer service. This project involves renovating a section of Washington Street between US 1 (N. Dixie Freeway) and Riverside Drive in New Smyrna Beach, for approximately 1,766 LF. The improvements consist of roadway milling & re-surfacing along Washington Street and adjacent side streets crossings, new stormwater inlets and pipes, 7-foot wide sidewalks on both sides with ADA curb ramps, re-constructed driveways for residential and businesses, curb & gutter sections, signage & striping, street lighting, landscaping and streetscape items to enhance the corridor appeal. One traffic loop (Volusia County) must be reconstructed on the west end at the US 1 (N. Dixie Freeway) intersection. Additional parallel parking spaces will be added at the east end of the project, near the intersection of Riverside Drive. Utilities work to include construction of approximately 2,135 linear feet of 8" water main, 180 linear feet of 10" water main, removing the overhead power and communication lines, and installing power and communication conduits underground along Washington Street. There will also be extensive electrical work to underground existing overhead distribution that includes removing approximately 2,000' of existing overhead 23kV distribution line utilizing wood poles, including secondary, service drops and all equipment. Underground work will install 7 pad mounted transformers, 7,500' of conduit, 5,000' of I/0 primary conductor, 3,000' of 350MCM secondary conductor, 1000' of 4/0 Conductor, one three phase sectionalizing enclosure, secondary pedestals, and pullboxes. Overhead work will install 4 in-line distribution poles with fuses and primary risers and one overhead transformer and span secondary to service an existing roadway light. The work will be performed within the existing right-of-way on Washington Street and easements acquired for electrical improvements. The City has executed permanent Easements and Right-of-entry (ROE) agreements for construction access with the adjacent property owners, allowing for minor grading to secure slope tie-downs and back-of-sidewalk drainage pipes at two locations. The Contractor’s implementation of Maintenance of Traffic (MOT) phasing will be critical during the construction to minimize impact on existing residents and local traffic. Washington Street corridor is one of two major connector roads to the beachside community and serves as a hurricane evacuation route. The other is State Road 44 to the South. The City has retained the services of a consultant to perform CEI services to oversee the day-to-day operations, resolve field issues, perform utility inspections, approve MOT operations and general compliance with the contract documents, where NSBU will be inspecting the electric improvements associated with the underground conversion including transformers, conductors, sectionalizing enclosure, pedestals and other components. The electrical inspection will be provided by New Smyrna Beach Utilities (NSBU) internal staff. Sealed Proposals shall be received via the City's eProcurement Portal found at https://procurement.opengov.com/portal/cityofnsb . Proposals received after the designated time will not be allowed on the City's e-Procurement Portal. Introduction Thank you in advance for your interest in doing business with the City of New Smyrna Beach. If you are interested in preparing a response to this solicitation, please read the bid package in its entirety prior to submitting a bid response. Your response is considered a binding offer to perform in the manner described in the bid response and shall remain a firm offer for a period of ninety (90) days from public opening. All Bidders are advised that under Chapter 119, Florida Statutes, all responses to this solicitation are deemed a public record and are open to the public as provided for in said Statute. The successful Bidder(s) must demonstrate in their submittal to be the lowest, most responsible and responsive Bidder which best meets the specifications and serves the overall needs of the city. Bids should be prepared in accordance with the instructions herein, and all bid prices should be thoroughly rechecked. Failure to provide the response in the manner prescribed herein may be grounds for disqualification of the submittal. The city reserves the right to waive any and all technicalities, formalities and to reject any or all bid submittals or to re-advertise for bid submittals for these commodities/services. The city may withdraw all or part of this ITB at any time to protect the interests of the city. The awarded Contractor must be registered with the Florida Department of State and licensed to do business in the State of Florida. Summary Background Contact Information Timeline All dates are tentative. The City reserves the right to change scheduled dates. Due Dates Prebid Meeting There is a non-mandatory pre-bid meeting scheduled for 11:00 am on Thursday, October 29, 2026 . The meeting will be held in the City of New Smyrna Beach Commission Chambers located at 214 Sams Avenue, New Smyrna Beach, Florida 32168. Attendance is strongly encouraged to understand the requirements of the Scope of Work. Due Date for Questions To ensure fair consideration for all parties, the city prohibits communication to or with any department, division, employee, or city representative from the issuance date of thi Source: OpenGov https://procurement.opengov.com/portal/cityofnsb/projects/202297 Canonical URL: https://govcontractfinder.com/contracts/construction-of-the-washington-street-roadway-improvements-f-opengov-387-project-202297