Construction of Traffic Signals at the Intersection of Becker RD /Limpkin LN AND Village Parkway Destination Way (Southern Grove) State and local opportunity open City of Port St. Lucie 20260342 Posted: 2026-11-18T18:00:01.095Z Response deadline: 2027-01-05T19:00:00.000Z Pursuant to the Port St. Lucie City Code of Ordinance 35.07, this electronic Invitation for Bids (IFB) is being issued to establish a contract with a qualified proposer who will provide Construction of Traffic Signals at the Intersection of Becker RD /Limpkin LN AND Village Parkway Destination Way (Southern Grove) to the City of Port St. Lucie (hereinafter, “City”) as further described in this IF B. Scope of Work Scope of Work Construction Services for traffic signal installation at two intersections; Becker Road & Limpkin Lane and at Village Parkway & Destination Way. The project consists of removal of existing concrete, milling and resurfacing, concrete Type F and Type D curb, 4” thick Sidewalk, Detectable Warning Mats, Signing and Pavement Markings, Steel Mast Arms and appurtenances at the two intersections mentioned above. Contractor to provide all materials, supplies, labor, and equipment necessary for a complete project based on all technical specifications, construction plans, and any Contract amendments that may be deemed necessary. All work shall be in accordance with the following: South Grove Signal Design Construction Plans prepared by DRMP, Inc. consisting of pages 1 through 31 (Attachment A). Please note that no underground borings shall occur on Fridays, Saturdays or Sundays. All submittals shall be sent to the CEI for review and approval to be coordinated with city staff. All work shall conform to the "Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction” (FY 2026-27), City of Port St Lucie Public Works and City of Port St Lucie Utilities Standards unless stated otherwise. Any reference in the FDOT and City Standard Specifications to the "Engineer" shall mean the Engineer on this Project and any reference to the "Department" shall mean the City. Specific references are made to certain portions of the FDOT and City Standard Specifications to facilitate the Contractor. Any reference to "FDOT Standard Indexes" shall mean the FDOT Standard Plans (FY 2026-27) and Interims. The City Standard Specifications can be found on the Public Works website. Website: https://www.cityofpsl.com/Government/Your-City-Government/Departments/Public-Works/Commercial-Residential-Review-Permitting PDF link: https://www.cityofpsl.com/files/assets/public/v/3/departments/public-works/documents/engineering_standards_for_land_development_final_2026.pdf CERTIFICATION REQUIREMENTS Selected Vendor must have a State of Florida General Contractor License . Introduction Purpose of Procurement Pursuant to the City of Port St. Lucie Code of Ordinances, Section 35.07 , this electronic Invitation for Bids (“IFB”) is being issued to establish a Contract with one (1) qualified Contractor who will provide Construction of Traffic Signals at the Intersection of Becker RD /Limpkin LN AND Village Parkway Destination Way (Southern Grove) to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB. A descriptive overview of the City can be found at https://www.cityofpsl.com/discover-us/about-psl . Please visit the City’s website to familiarize yourself with how our city is structured and operates. Please contact the Issuing Officer with any questions. Overview of the IFB Process The objective of the IFB is to select one (1) or more qualified Contractor (as defined by Section 1 – “Purpose of Procurement”) to provide the goods and/or services outlined in this IFB to the City. This IFB process will be conducted to gather and evaluate responses from Contractors for potential award. All qualified Contractors are invited to participate by submitting responses, as further defined below. After evaluating all Contractor’s responses received prior to the closing date of this IFB and resolution of any Contract exceptions, the preliminary results of the IFB process will be publicly announced, including the names of all participating Contractors and the evaluation results. Subject to the protest process, final Contract award(s) will be publicly announced thereafter. NOTE TO CONTRACTORS: The general instructions and provisions of this document have been drafted with the expectation that the City may desire to make one award or multiple awards. For example, this document contains phrases such as “contract(s)” and “award(s)”. Please refer to Section 1 – “Purpose of Procurement” and Section 9 – “Evaluation and Award,” for information concerning the number of Contract awards expected. Schedule of Events The Schedule of Events set out herein represents the City’s best estimate of the schedule that will be followed. However, delays to the procurement process may occur, which may necessitate adjustments to the proposed schedule. If a component of this schedule, such as the close date, is delayed, the rest of the schedule may be shifted as appropriate. Any changes to the dates up to the closing date of the IFB will be publicly posted prior to the closing date of this IFB. After the close of the IFB, the City reserves the right to adjust the remainder of the proposed dates, including the dates for evaluation, negotiations, award, and the Contract term, on an as-needed basis, with or without notice. Release of IFB: November 18, 2026 Question Submission Deadline: December 18, 2026, 5:00pm Response Submission Deadline: January 5, 2027, 2:00pm Teams link: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2750372263378826?p=opCFezuRCswIloTMYx Meeting ID: 275 037 226 337 882 6 Passcode: hW6VL6TC The City reserves the right to proceed to award without further discussions after receipt of the initial proposals, in which case, evaluation committee reviews, negotiations, and proposal revisions may not be required. Official Issuing Officer (Procuring Agent) Robyn Holder , Sr. Procurement Contracting Officer C. 772-281-9284 rholder@cityofpsl.com Definition of Terms Please review the following terms: - Contractor(s) – companies desiring to do business with the City (Also called “Bidder,” “Proposer,” or “Offeror.”) - City of Port St. Lucie (“City”) – the governmental entity identified in “Purpose of Procurement,” of this IFB. - Immaterial Deviation – does not give the Contractor a substantial advantage over other Contractors. - Material Deviation – gives the Contractor a substantial advantage over other Contractors and thereby restricts or prevents competition. - Procurement Management Division (“PMD”) – the City department that is responsible for the review and possible sourcing of all publicly sourced solicitations. - Responsible – means the Contractor, whether a company or an individual, has the financial and technical capacity to perform the requirements of the solicitation and subsequent Contract which will assure good faith performance of the Contract. - Responsive – means the Contractor, whether a company or an individual, has submitted a bid which conforms in all material respects to the requirements set forth in the solicitation. - Sourcing Platform/Electronic Bidding System - OpenGov. - Electronic Bid Bond ("eBond") – a digitally executed surety bond submitted through an approved electronic surety platform (Surety2000), carrying the same legal standing as a traditional bond and subject to all requirements in Section 5.1. Any special terms or words which are not identified in this IFB may be identified separately in one or more attachments to the IFB. Contract Term The Initial term of the contract(s) is f or three hundred sixty five (365) calendar days from t he execution date . In the event that the Contract(s), if any, resulting from the award of this IFB shall terminate or be likely to terminate prior to the making of an award for a new Contract for the identified products and/or services, the City may, with the written consent of the awarded Contractor(s), extend the Contract(s) for such period of time as may be necessary to permit the City’s continued supply of the identified products and/or services. The Contract(s) may be amended in writing from time to time by mutual consent of the parties. Unless this IFB states otherwise, the resulting award of the Contract(s) does not guarantee volume or a commitment of funds. 1.6.1 Hours of Service The standard hours of work allowed in the City’s rights-of-way are from 7:00 a.m. to sundown Monday through Friday. Any work performed by the Contractor outside of the aforementioned time limit requires special authorization by the City and requires that the Contractor obtain a noise permit from the Port St. Lucie Police Department (PSLPD). All equipment operated at night shall comply with the noise levels established by the City of Port St. Lucie noise ordinance. Any additional costs associated with work outside of the hours of work allowed shall be borne by the Contractor. This shall include, but is not limited to, costs of inspection, testing, police assistance, and construction administration. All night, Saturday, Sunday, and/or Holiday work must be authorized by the City and requires that the Contractor obtain a noise permit from the PSLPD. All night work within the City’s rights-of-way requires a minimum forty-eight (48) hour prior notice to the City. This clause shall not pertain to crews organized to perform maintenance work on equipment or to operate and maintain special equipment such as dewatering pumps, which may be required to work twenty-four (24) hours per day. Instructions to Contractors This section contains general business requirements. By submitting a response, the Contractor is certifying its agreement to comply with all the identified requirements of this section and that all costs for complying with these general business requirements are included in the Contractor’s submitted pricing. By submitting a response to the IFB, the Contractor is acknowledging that the Contractor: Has read the information and instructions, and Agrees to comply with the information and instructions contained herein. General Information and Instructions 3.1.1 Familiarity with Laws and Regulations It is the responsibility of responding Contractors to be familiar with all Federal, State, and local laws, ordinances, rules, and regulations, that may affect the work. Ignorance on the part of the Awarded Contractor will in no way relieve it from Contract responsibility. 3.1.2 Restrictions on Communicating with Staff/ Cone of Silence From the issue date of this IFB until the time of City Council's approval of the award or the City Manager's approval when proposal amount is below the required formal solicitation threshold (or the IFB is officially canceled), Contractors are not allowed to communicate for any reason with any City staff or elected officials except through the Issuing Officer named herein, during the Bidders'/Offerors’ conference (if any), as defined in this IFB, or as provided by existing work agreement(s). This is commonly known as a Cone of Silence during the procurement process as identified in the City Code of Ordinances, Section 35.13 . Prohibited communication includes all contact or interaction, including but not limited to, telephonic communications, emails, faxes, letters, or personal meetings, such as lunch, entertainment, or otherwise. The City reserves the right to reject the response of any Contractor violating this provision. Further information on this topic can be found on the Cone of Silence and IFB Communication Document. 3.1.3 Submitting Questions All questions concerning this IFB must be submitted in writing on the OpenGov Platform during the Question and Answer open period. Please select the Question and Answer tab in the IFB project and click the "Ask Question" option. Once the question has been entered, select the "Submit Question" button. Enter a subject in the Subject field and then type the question in the Question field below. Once finished, select "Submit." No questions other than written will be accepted. No response other than written will be binding upon the City. All Contractors must submit questions by the deadline identified in the Schedule of Events for submitting questions. Contractors are cautioned that the City may or may not elect to entertain late questions or questions submitted by any other method than as directed by this section. 3.1.4 Attending Bidders'/Offerors' Conference The Bidders'/Offerors’ Conference or any other information session (if indicated in the Schedule of Events) will be held at the locations referred to in “Schedule of Events,” of this IFB. Unless indicated otherwise, attendance is not mandatory, although Contractors are strongly encouraged to attend. However, in the event the conference has been identified as mandatory, then a representative of the Contractor must attend the conference in its entirety to be considered eligible for Contract award. The Contractor is strongly encouraged to allow ample travel time to ensure arrival in the conference meeting room prior to the beginning of any mandatory conference. The City reserves the right to consider any representative arriving late to be “not in attendance.” Therefore, all Contractors are strongly encouraged to arrive early to allow for unexpected travel contingencies. 3.1.5 The City's Right to Request Additional Information- Contractor's Responsibility Prior to Contract award, the City must be assured that the selected Contractor has all the resources to successfully perform under the Contract. This includes, but is not limited to, adequate number of personnel with required skills, availability of appropriate equipment in sufficient quantity to meet the on-going needs of the City, financial resources sufficient to complete performance under the Contract, and experience in similar endeavors. If, during the evaluation process, the City is unable to assure itself of the Contractor’s ability to perform, if awarded, the City has the option of requesting from the Contractor any information deemed necessary to determine the Contractor’s responsibility. If such information is required, the Contractor will be notified and will be permitted approximately ten (10) business days to submit the information requested. 3.1.6 Failing to Comply with Submission Instructions Responses received after the identified due date and time or submitted by any other means than those expressly permitted by the IFB will not be considered. Contractor's response must be complete in all respects, as required in each section of this IFB. 3.1.7 Rejection of Proposals; The City's Right to Waive Immaterial Deviation The City reserves the right to reject any or all responses, to waive any irregularity or informality in a Contractor’s response, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City. The City reserves the right to waive mandatory requirements, provided that, all the otherwise Responsive proposals failed to meet the mandatory requirements and/or doing so does not otherwise materially affect the procurement of requested commodities and/or services. It is also within the right of the City to reject responses that do not contain all elements and information requested in this IFB. A Contractor’s response will be rejected if the response contains any defect or irregularity and such defect or irregularity constitutes a Material Deviation from the IFB requirements, which determination will be made by the City in its sole discretion and on a case-by-case basis. NOTE: The City reserves the right to reject the Bid of any Contractor who has previously failed in the performance of an award, to deliver contracts of a similar nature on time, or who is not in a position to perform properly under this award. This includes the firm, employees, and financial or legal interests. The City will not enter into a contract or conduct business with any firm or any personnel that is listed on the Federal, State, or other local government agencies' Exclude Submittal Instructions Submittal Instructions to Electronic Bidding System Listed below are key action items related to this IFB. The Schedule of Events Section identifies the dates and time for these key action items. This portion of the IFB provides high-level instructions regarding the process for reviewing the IFB, preparing a response to the IFB, and submitting a response to the IFB. 3.2.1 IFB Released The release of the IFB is through the posting of this project in OpenGov, the City's Electronic Bidding System. Each Contractor interested in competing to win a Contract award must complete and submit a response to this IFB in OpenGov. Therefore, each Contractor MUST carefully review the submittal instructions. 3.2.2 IFB Review The IFB 20260342 consists of the following: this document, entitled “ Construction of Traffic Signals at the Intersection of Becker RD /Limpkin LN AND Village Parkway Destination Way (Southern Grove) ,” and any and all information included in the IFB, as posted to OpenGov, including any and all documents provided by the City as attachments to the IFB or links contained within the IFB or its attached documents. Please carefully review all information, including all documents available as attachments or available through links. Any difficulty accessing or opening provided links or documents should be reported immediately to the Issuing Officer. 3.2.3 Preparing a Response When preparing a response, the Contractor must consider the following instructions: Use the provided Cost Table to prepare your response. Enter your responses directly into the Cost Table. Unless otherwise directed, do not insert “see attached file” (or similar statements) in the worksheet to reference separate documents. Answer each question in sufficient detail for evaluation while using judgment with regards to the length of response. Proofread your response and make sure it is accurate and readily understandable. Label any and all uploaded files using the corresponding section numbers of the IFB as specified by the City. Use caution in creating electronic files to be uploaded. If the City is unable to open an electronic file due to a virus or because the file has become corrupted, the Contractor’s response may be considered incomplete and disqualified from further consideration. Use commonly accepted software programs to create electronic files. The City has the capability of viewing documents submitted in the following formats: Microsoft Office and portable document format file (PDF). Unless the IFB specifically requests the use of another type of software or file format than those listed above, please contact the Issuing Officer, Robyn Holder , prior to utilizing another type of software and/or file format. In the event that the City is unable to open an electronic file because the City does not have ready access to the software utilized by the Contractor, the Contractor’s response will be considered incomplete and disqualified from further consideration. 3.2.4 Reviewing, Revising, or Withdrawing a Submitted Response After the response has been submitted, the Contractor may view and/or revise its response by logging into OpenGov. Please take note of the following: A. BID SUBMISSION . All bids shall be submitted by completing and uploading all required documents. All submittals are required to be electronic. No hard copies will be accepted. The Cost Worksheet shall be completed through the Cost Table in OpenGov (see Section 7 – Cost Table ). To ensure a complete submission, vendors must follow the requirements outlined in: Section 11 – List of IFB Documents , and Section 12 – Vendor Submis Source: OpenGov https://procurement.opengov.com/portal/cityofpsl/projects/300410 Canonical URL: https://govcontractfinder.com/contracts/construction-of-traffic-signals-at-the-intersection-of-becke-opengov-9427771-project-300410