Consultant Services to Develop, Conduct, and Manage the Sound Insulation Program (SIP) State and local opportunity evaluation County of Dane 326022 Posted: 2026-10-21T19:00:00.989Z Response deadline: 2026-11-20T20:00:00.000Z In accordance with the FAA Order 5100.38D, “Airport Improvement Program ( AIP) Handbook” and Advisory Circular (AC)s 150/5100-14E (Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects), AC 150/5020-1 (Noise Control and Compatibility Planning), and 150/5000-9B (Guidelines for Sound Insulation of Structures Exposed to Aircraft Noise), and Dane County policies and procedures, Dane County is seeking Statement of Qualifications (SOQ) from qualified firms to provide Consultant Services to Develop, Conduct, and Manage the Sound Insulation Program (SIP) , located at Dane County Regional Airport (MSN) . The request for professional consultant services will be performed under a negotiated professional services agreement. The contract term will be up to a five-year period, with an agreement in-place for each year of the program. Interested respondents should have demonstrated experience in conducting and managing a Sound Insulation Program (SIP) in conformance with AC 150/5020-1 (Noise Control and Compatibility Planning) and FAA AC 150/5000-9B (Guidelines for Sound Insulation of Structures Exposed to Aircraft Noise) 1 , [including but not limited to], conducting community outreach surveys, conducting property surveys, and acoustical testing of properties, developing design-bid packages, coordinating and managing avigation easements, and showing capacity to manage the program of similar scope and complexity from development to implementation in compliance with federal (i.e., FAA), state, and local standards, including the development of program materials supportive of the respective program. A pre-proposal site meeting will not be provided for this Request for Qualifications (RFQ). 1 FAA AC 150/5000-9B is intended for use by the Federal Aviation Administration (FAA), airport operators, airport sponsors, and airport consultants or contractors to develop and manage sound insulation programs (SIPs) established to mitigate noise impacts to structures exposed to aircraft noise around airports. Introduction Summary Background Contact Information Timeline The Project specific and estimated dates and times of events are below. Some of the events have specific completion dates. In the event that the Department of Administration- Public Works Engineering Division finds it necessary to change any of the specific dates and times in the calendar of events, it will do so by issuing an addendum to this RFP. There may or may not be a formal notification issued for changes in the estimated dates and times. RFQ Instructions All questions and inquiries concerning this Request for Qualifications (RFQ) must be submitted via the County's eProcurement Portal before 4:00 pm on Friday, November 6, 2026 . Respondents are expected to raise any questions, exceptions, or additions they have concerning the RFQ document at this point in the RFQ process. If a respondent discovers any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency in this RFQ, the respondent should immediately notify the contact person of such error and request modification or clarification of the RFQ document. Respondents are prohibited from communicating directly with any employee of Dane County, except as described herein. No County employee or representative other than those individuals listed as County contacts in this RFQ is authorized to provide any information or respond to any question or inquiry concerning this RFQ. General Solicitation Process Obtain RFQ documents from the procurement.opengov.com/portal/countyofdane web site. Soliciting company is responsible to check back regularly for Addenda. Interested Firms are required to register at the County's eProcurement Portal to submit a Statement of Qualifications (SOQ). Registration is free. Register by clicking “Sign Up” at https://procurement.opengov.com/login. Create a username, password, and activate an account. Select project categories that your company would like to receive future solicitation notifications for. Note: For projects similar to this Solicitation, a project category of 91200 [for public works projects] is assigned to it. Locate the solicitation by searching for the RFQ Project Number, Organization, or Proposal Title. Subscribe for “New Project Updates” to receive notifications about the solicitation. Message procurementsupport@opengov.com with any questions regarding account set up. If you need any additional information or have questions about this Request for Qualifications, please call Ryan Falch , Director of Planning and Development at (608) 279-0449 or send an email to falch.ryan@msnairport.com . Dane County is an Equal Opportunity Employer. Qualifications Submission Interested firms are required to follow the steps outlined below to submit an SOQ: Click on "Draft Response" to submit an SOQ. Upload all required documents and answer all questions in Section " Firm Questionnaire & Uploads ": Complete the Contact Information Questionnaire Complete the Addenda Questionnaire Complete the Question and Answer (Q&A) Questionnaire Complete the Fair Labor Practices Questionnaire Complete the Federal Provisions Questionnaire Complete the Disadvantaged Business Enterprise (DBE) Questionnaire Submit the SOQ Response Document(s) as outlined below with understanding Section “ RFQ Evaluation Criteria ”: Documents must include all relevant and pertinent information Documents must be saved in .pdf format The file name should include the RFQ #, Name of company submitting the Proposal Example: "RFQ # 326022 _[Vendor Name]". Upload SOQ in the following format: Cover Page: Include the project title, firm name, mailing address, primary contact name, phone number, email address, and the date. The cover page must be signed by an authorized representative of the Firm. Executive Summary: Provide a brief summary highlighting the firm’s qualifications, relevant experience, and key reasons for interest in the program. Table of Contents: Include an identification of material by Section and Page Number. Description of Organization Experience: Describe the firm’s background and relevant experience, particularly in developing and implementing sound insulation programs involving FAA AIP funding and requiring compliance conformity with FAA Orders and Advisory Circulars, such as the AIP Handbook (FAA Order 5100.38D), AC 150/5020-1 (Noise Control and Compatibility Planning) and FAA AC 150/5000-9B (Guidelines for Sound Insulation of Structures Exposed to Aircraft Noise). Include a list of comparable programs completed within the past ten (10) years. For each program, provide: A brief description of the scope and services provided The firm’s specific role and responsibilities Client name and contact information for reference Description of Program Team/Resumes: Identify the proposed program team, including any subconsultants. Provide: An organizational chart showing team structure and roles A one-page résumé for each key team member, including location A matrix or narrative identifying which firm or individual will be responsible for each major scope item A statement of availability and current workload capacity for the next 5 years Program Approach: Demonstrate your understanding of the program by outlining your proposed approach. Include: A description of anticipated challenges and strategies to address them A summary of the methodology and steps your team will use to complete the program (include any innovative practices, tools, or cost management platform) Schedule: Provide a high-level bar chart schedule showing the sequence, duration, and interrelationship of major tasks. Include: Key milestones and deliverables Anticipated Public Participation Elements A statement confirming your ability to meet the proposed schedule Upload any Supplemental Material (without exceeding page limit) Complete the Designation of Confidential and Proprietary Information Questionnaire Complete the Firms Limitations Questionnaire Confirm your SOQ is complete, complete Signature Affidavit, and select “Submit SOQ” Each SOQ must be limited to 30 single-sided pages (or 15 double-sided pages), inclusive of all required content and optional materials. SOQ's must be submitted electronically via the County's eProcurement Portal before 2:00 pm on Friday, November 20, 2026 . Late, faxed, mailed, hand-delivered, or incomplete submissions will be rejected unless otherwise specified. Dane County is not liable for any costs incurred by respondents in replying to this RFQ. Dane County is also requesting that firms submit up to six (6) hard-copies of their SOQ to the address below, but submission through County's eProcurement Portal will be the official response to the solicitation. Hard-copies shall be 8.5” x 11” in size and are required. 11” x 17” page size (folded to fit) is acceptable for use to include for graphical representation and considered “one” page towards the page limit. Front, back, and section dividers would not count towards the page limit for hard copy submittals. Hard-copies shall be delivered to the address below, with the firm's name and the following: MSN Airport SOQ - 326022 - Consultant Services to Develop, Conduct, and Manage the Sound Insulation Program (SIP) Ryan Falch, PE 4000 International Lane, Madison, WI 53704 Director of Planning and Development Falch.Ryan@msnairport.com Disadvantaged Business Enterprise (DBE) Program As of the date of this RFQ, the current federal DBE program has been suspended by the U.S. Department of Transportation pursuant to interim final rule (2025-19460 (90 FR 47969)). Following reestablishment of the federal DBE program requirement, Dane County will issue further DBE program requirements pursuant to the rule as required for contracts related to this solicitation. Given the broad range of professional disciplines required for this project, firms are encouraged to include additional subconsultants, including DBEs, as needed—subject to approval by airport management. It is the policy of Dane County to ensure that DBEs have the maximum opportunity to participate in contracts funded in whole or in part with federal funds. All firms must take necessary and reasonable steps, in accordance with 49 CFR Part 23, to ensure that DBEs can compete for and perform work without discrimination based on race, color, national origin, disability, or gender. Evaluation Dane County reserves the right to accept or reject any SOQ submitted. The evaluation will be based solely on qualifications. Do not include any cost information. Any SOQ submitted with cost information will be rejected. Dane County selection panel will review submitted SOQ and score each SOQ against the evaluation criteria of the selection process. Firms will be ranked according to how well they meet the evaluation criteria. The selection panel will consist of up to seven (7) members and up to three (3) non-scoring advisors, all of whom possess technical expertise and familiarity with the project scope and requirements. Dane County may select up to three (3) firms and schedule to appear before an interview panel for the second phase of the selection process. Those appearing for an interview must be prepared to discuss questions provided by MSN. The detailed instructions and questions will be shared with the firms after the evaluation of the written RFQs. The interviews will be required to be in-person at MSN. Award Dane County reserves the right to negotiate an Agreement after selecting the most qualified firm. Selection is only based on the SOQ submitted and subsequent interviews. If negotiations with the top-ranked firm are unsuccessful, Dane County reserves the right to initiate negotiations with the next highest-ranked firm. Contracting A sample Professional Services Agreement- Standard Terms & Conditions will be included in this solicitation via addendum. Firms must thoroughly review and clearly state any limitations or detail any conditions that the Firm may have and include as part of the RFQ Submission in Firm Questionnaire & Uploads. Contract Term The contract will be effective on the execution date indicated on the Professional Services Agreement (PSA). The contract term will have a period of performance of up to five (5) years, and will have an PSA for each year based on the County's intent to extend to the next year and on the Firm's scope of work/fee proposal. Scope of Services The following definitions and links are used throughout the RFQ: County : Dane County County Agency : Department/Division utilizing the service or product. Dane County Purchasing website : https://www.danepurchasing.com/ Proposer/Vendor/Firm/Contractor : a company submitting a Statement of Qualifications in response to this RFQ. General Overview The FIRM shall provide professional consultant services for the following phase: Develop, Conduct, and Manage the Sound Insulation Program (SIP) in accordance with federal, state, and local standards. Upon selection of the most qualified firm, a detailed scope of services and list of deliverables will be finalized during contract negotiations. An assigned COUNTY Project Manager will be the FIRM's contact in securing COUNTY direction and for arranging the necessary meetings with COUNTY or other County Departments and obtaining the approvals required by COUNTY. The term “written” or “in writing” may be either electronic or hard copy documentation, unless otherwise stated or directed by COUNTY. This project is anticipated to be funded through the FAA’s Airport Improvement Program (AIP). Funding for the project may be provided up to 90% by the FAA. However, MSN specific components may not qualify for reimbursement. Firm(s) shall be aware of delineating eligible and ineligible components in the contracting documents, which will be determined in collaboration with FAA/BOA . As such, all work must comply with applicable FAA Advisory Circulars (ACs), as well as relevant federal, state, and local regulations. These include, but are not limited to: AC 150/5000-9B (Guidelines for Sound Insulation of Structures Exposed to Aircraft Noise) AC 150/5020-1 (Noise Control and Compatibility Planning) Program Guidance Letter 12-09 FAA Order 5100.38D ("Airport Improvement Program (AIP) Handbook") Current Edition of International Energy Conservation Code (IECC) Current Edition International Building Code (IBC) All tasks must conform to the most current versions of these publications at the time of project scoping. COUNTY intends to submit multiple grant application over multiple years to the FAA and/or WisDOT-BOA to support the program. Please note that project elements, timelines, and funding are subject to change based on external factors Document Review and Submittals must be in PDF file format (.pdf) using Adobe Acrobat 2020, Bluebeam Revu 21, or previous compatible version. It is recommended to minimize the pdf file size by converting files from AutoCAD or other programs rather than scanning. Microsoft Word files (.doc) should be generated in Word 2016 or previous compatible version Microsoft Excel files (.xls) should be generated in Excel 2016 or previous compatible version Drawing files (.dwg) should be generated in AutoCAD 2019 or previous compatible version, and must include x-refs or base plan sheets, the Plot Style Table (ctp file) used to print drawings, and any external data from non-AutoCAD programs (e.g., Excel or Word) Documents must be delivered to Dane County electronically via email or SharePoint, and unless noted otherwise. Sound Insulation Program (SIP) The selected Firm will be expected to provide services typically associated with developing, conducting, and managing a Sound Insulation Program (SIP). The scope of work will include, but is not limited to: SIP Documentation Supporting development of all documentation for implementing a SIP in accordance with Chapters 3, 6 and 8 of the FAA AC 150/5000-9B Supporting all documentation for quarterly and annual reporting and program close out in accordance with Chapter 9 FAA AC,150/5000-9B. Data Review and Site Surveys Identification Review all relevant information ("Controlling Documents") from the 2025 Noise Compatibility Program (NCP), including identification of structures located within the 65dB DNL (or higher) noise exposure contours as shown in the FAA‑accepted Noise Exposure Map (NEM). Conduct a comprehensive community survey for all properties within the 2027 65dB, 70dB, and 75dB DNL contours. Categorize properties based on site surveys and document this in a database/spreadsheet to catalog all identified structures, including: size, number of floors, window and door counts, presence of central air conditioning, construction type, and date of original construction (with building permit documentation) (Refer to Chapter 8 of the FAA AC 150/5000-9B). Develop Stakeholder Outreach Tools including program website, outreach materials, mailing, etc. Develop SIP program processes and preconstruction activities, including coordination of avigation easements. Eligibility Verification and Acoustical Testing Conduct property surveys and acoustical pre‑testing to determine eligibility for sound insulation treatment in accordance with FAA Order 5100.38D. Use Phase 1 eligibility results to inform subsequent program phases based on the most recent FAA‑accepted NEM. Re-verification may occur in future years as NEM updates are completed/approved. Evaluate and Review Block Rounding and Neighborhood Equity at the onset of the Program, including coordination with FAA. Program Development and Administration Develop SIP implementation guidelines for use by MSN Airport Leadership and WisDOT-BOA including procedures for voluntary participation. Execute participation agreements with property owner(s). Track and respond to inquiries from property owner(s) regarding eligibility, program requirements, and prioritization. Establish and, if necessary, implement criteria for prioritizing properties. Develop an education/training program for local contractors to become qualified and be able to participate. Design, Costing, and Procurement Support Provide Architectural and Engineering (A/E) services for sound insulation improvements. Prepare Opinions of Probable Cost and conduct building code evaluations. Develop design and bid packages, including plans, elevations, sections, details, and specifications. Design and bid packages must include Buy-American preference and certifications, including 49 U.S.C. §50101, BABA, and other related Made in American Laws, U.S. Statutes, guidance and FAA polices. Prepare bidding documents and assist MSN/WisDOT-BOA with procurement and contractor selection. Construction Administration and Oversight Provide construction administration services throughout the program. Supply a full‑time, on‑site construction representative during the first year of implementation and periodic site representation in subsequent years. Coordinate all work with property owner(s). Monitor daily construction activities and lead weekly progress meetings. Perform acoustical post‑installation testing to confirm compliance with FAA performance requirements. Communications and Stakeholder Coordination Support coordination of external communications related to SIP implementation, including oversight of any third‑party services. Budgeting and Program Forecasting Prepare cost projections and budgets for ongoing and future SIP activities over the five‑year program period. SIP Data Management and GIS Integration Develop and maintain a web‑based RSIP database documenting all past, current, and future property treatments, including dates, types of improvements, and associated costs Ensure the database incorporates GIS mapping functionality and is fully compatible with Dane County’s GIS platfor Source: OpenGov https://procurement.opengov.com/portal/countyofdane/projects/267719 Canonical URL: https://govcontractfinder.com/contracts/consultant-services-to-develop-conduct-and-manage-the-sound-opengov-4044-project-267719