Cooling Tower Maintenance Services State and local opportunity open County of Orange 060-3159902-MB Posted: 2026-10-16T22:35:40.231Z Response deadline: 2026-12-16T00:00:00.000Z The County of Orange, Sheriff-Coroner , (hereinafter referred to as County) is requesting competitive bids from qualified vendors (hereinafter referred to as Bidder) for Cooling Tower Maintenance Services . The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. The awarded Contract, (hereinafter referred to as Contract) will be between the County and awarded Bidder, (hereinafter referred to as Contractor) in accordance with the model contract terms, conditions and scope of work. This is a fully electronic solicitation – only electronic bids submitted through the County’s online bidding system will be allowed; no other form of bid submittals will be accepted. Prior to submitting a bid, Bidders are advised to carefully read the instructions below, including the model contract and any solicitation attachments and/or exhibits. For assistance on uploading proposals via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/ . All questions or requests for interpretations must be received within this solicitation's Question & Answer section as specified in the solicitation. Respondents are not to contact other County personnel with any questions or clarifications concerning this solicitation. James A. Musick Facility Manufacturer - Marley Model - Unknown Quantity: 2 *Contractor shall quote fixed price for service to include all required and suggested manufacturer duties and tasks for equipment Semi Annual Preventive Maintenance in combination with all required and suggested manufacturer duties and tasks for equipment Annual Preventive Maintenance. ***Equipment and location are subject to additions, deletions, and modifications. Inspection Cost - Semi Annual Inspection Cost - Annual Theo Lacy Facility Manufacturer - Marley Model - NC212 Quantity: 2 *Contractor shall quote fixed price for service to include all required and suggested manufacturer duties and tasks for equipment Semi Annual Preventive Maintenance in combination with all required and suggested manufacturer duties and tasks for equipment Annual Preventive Maintenance. ***Equipment and location are subject to additions, deletions, and modifications. Inspection Cost - Semi Annual Inspection Cost - Annual Theo Lacy Facility Manufacturer - Marley Model - NC3222CS Quantity: 2 *Contractor shall quote fixed price for service to include all required and suggested manufacturer duties and tasks for equipment Semi Annual Preventive Maintenance in combination with all required and suggested manufacturer duties and tasks for equipment Annual Preventive Maintenance. ***Equipment and location are subject to additions, deletions, and modifications. Inspection Cost - Semi Annual Inspection Cost - Annual As-Needed Services The following rates shall apply to all quotes for additional services including corrective maintenance, new equipment, and part order. All quotes must contain detailed labor and material charges to be approved by authorized County project lead prior to any service. Labor hours shall be charged based on actual time spent on each job, not portal to portal basis, and shall be computed to the nearest one quarter (1/4) hour. Labor rates shall include all direct and indirect expenses including travel and overheard expenditures. After-hour rates shall not be paid on non-emergency response requests unless specifically authorized by County project lead. Monday thru Friday 7:00 a.m. to 5:00 p.m. Monday thru Friday 5:00 p.m. to 7:00 a.m. Saturday 12:00 a.m. to 11:59 p.m. Sunday 12:00 a.m. to 11:59 p.m. Holidays 12:00 a.m. to 11:59 p.m. Materials and Shipping a. Materials shall be charged at invoice cost plus mark-up. b. County reserves the right to purchase, for Contractor’s use, any parts and materials. c. Parts and material costs shall be paid based on actual invoice cost to the Contractor. d. All parts and material items used for each location shall be listed on the corresponding invoice. e. Copies of the actual purchase invoice for each item costing greater than $500 shall be attached to the invoice. County reserves the right to reject material costs not submitted with original purchase invoice. f. County shall reimburse contractor for freight and shipping charges at actual costs, no mark-up shall be reimbursed. g. In addition to standard freight and shipping cost, County may approve additional costs for rush, expedited and overnight shipping. All additional costs for expedited shipping shall be quoted and approved in writing prior, by an authorized County project lead. h. Expedited and overnight shipping shall be reimbursed to Contractor, at actual invoice cost, if approval in writing prior, by authorized County project lead. Permit Fees ***No mark-up will be accepted.** a. Permitting fees shall be charged at cost. No mark-up will be accepted. County reserves the right to provide permitting independently. b. Permit fees will be paid based on actual cost to the Contractor. c. All permit fees shall be listed on the corresponding invoice. d. Copies of the actual permit receipt shall be attached to the invoice. County reserves the right to reject material costs not submitted with original permit receipt. e. Expedited permitting shall be reimbursed to Contractor, at actual cost, if approval in writing prior, by authorized County project lead. Specialized Equipment Rental a. Project specific equipment rentals shall be reimbursed at invoice cost plus the percentage mark-up if required to perform service, based on individual physical characteristics of the facility and approved in writing prior, by authorized County project lead. b. Contractor shall submit to County the original invoice for all rental equipment. c. Contractor shall list all rental equipment on each corresponding invoice and attach the original equipment rental documentation. Scope of Work Purpose and Background The Orange County Sheriff’s Department has facilities requiring routine inspection, testing, cleaning, certification, service, corrective maintenance, chemical treatment, water quality management, and emergency services on cooling towers and associated equipment, including but not limited to cooling tower basins, fill media, drift eliminators, distribution systems, fans, motors, drives, heat exchangers, water treatment systems, and associated piping, valves, and controls. Minimum frequency and tasks to be in accordance with all manufacturer specifications and recommendations, County tasks and duties, State, Federal, and Local laws, and regulatory requirements, including California Health and Safety Code Section 116057 (Cooling Tower Water Treatment) and all applicable guidelines from the California Department of Public Health. In addition to routine scheduled service and planned corrective maintenance, Contractor shall be available for emergency services twenty-four (24) hours a day, seven (7) days a week, three-hundred sixty-five (365) days a year. Contractor shall perform scheduled and on-call tasks and duties at the following service locations and may respond to various other locations not listed below for as-needed services to include any current or future Sheriff maintained facility. Service Locations Orange County Sheriff’s Department Address Assigned to North Shop Theo Lacy Facility 501 The City South, Orange, CA 92868 Assigned to South Shop James A. Musick Facility 13420 Alton Pkwy, Irvine, CA 92618 Service Coordination Shop Personnel Phone Number North Shop Craft Supervisor Shop Planner 714-935-7006 (O) / 714-920-2622 (C) 714-935-8098 (O) / 657-492-3416 (C) Central Shop Craft Supervisor Shop Planner 714-647-6175 (O) / 714-920-1249 (C) 714-647-4556 (O) / 714-412-4099 (C) South Shop Craft Supervisor Shop Planner 949-249-5134 (O) / 714-920-0254 (C) 949-249-5135 (O) / 714-955-7636 (C) External Support Craft Supervisor Shop Planner 714-935-6671 (O) / 714-920-1431 (C) 714-935-6870 (O) / 714-920-0694 (C) Regulatory Compliance Shop Planner 714-935-6278 (O) / 714-681-4208 (C) Facilities Operations Service Desk / Afterhours Watch Commander Dispatch – (4:30 p.m. to 7:00 a.m.) 714-935-6606 Compliance Contractor shall ensure County cooling tower equipment remains in optimal operational condition and in compliance with all state, federal, and local laws, and regulatory agencies, including but not limited to ASHRAE Standard 188 (Legionellosis Risk Management), California Health and Safety Code Section 116057, OSHA, and applicable EPA guidelines for water treatment and Legionella prevention. Contractor shall perform all maintenance and service in accordance with all applicable state, federal, and local law, and regulatory requirements, including but not limited to ASHRAE Standard 188, ASHRAE Guideline 12-2000, CTI (Cooling Technology Institute) standards, California Health and Safety Code Section 116057, and OSHA. Service Requirements Contractor shall provide scheduled maintenance and corrective maintenance on County cooling towers and corresponding equipment, including but not limited to cooling tower basins, fill media, drift eliminators, distribution systems, nozzles, fans, motors, variable frequency drives (VFDs), gearboxes, belts, sheaves, water treatment chemical feed systems, biocide injection systems, conductivity controllers, bleed-off controls, float valves, makeup water assemblies, strainers, heat exchangers, associated piping, isolation valves, and instrumentation, to ensure optimal performance. Contractor shall perform full mechanical cleaning and disinfection of cooling tower basins, fill media, and associated surfaces no less than twice annually, or more frequently as required by the County. Contractor shall provide seasonal start up, shut down, layup, and winterization services for each cooling tower system, including draining, cleaning, and treatment of idle systems to prevent stagnation and microbial growth. Frequency shall be in accordance with manufacturer requirements, warranties, ASHRAE 188 Water Management Plan requirements, California Health and Safety Code requirements and County requirements. Contractor shall perform routine maintenance and service on equipment such that equipment and systems are preserved and restored to effective operational conditions and may be effectively used for its designated purpose. Contractor shall develop, implement, and maintain a site-specific Water Management Plan (WMP) in accordance with ASHRAE Standard 188, including all required hazard analysis, control measures, monitoring procedures, corrective actions, and verification records, for each cooling tower system. Contractor shall perform and document all required water quality testing, including but not limited to Legionella bacteria testing, conductivity, pH, biocide residual levels, corrosion inhibitor levels, and total dissolved solids (TDS), at frequencies required by California Health and Safety Code Section 116057, ASHRAE Standard 188, and the County-approved Water Management Plan. In the event water quality test result, including Legionella bacteria, exceed any regulatory or County established limits, Contractor shall immediately notify the County project lead, in writing, within two (2) hours of receipt of results, and shall implement corrective action, including remedial disinfection and/or shock treatment, in accordance with all regulatory agencies requirements and perform confirmatory retesting. Contractor shall assist County in registering and annually updating each cooling tower system with the California Department of Public Health (CDPH) registry, and any applicable local environmental health agency, as required under California Health and Safety Code Section 116057.5. Contractor, upon authorized County project lead approval, may provide engineering, design and fabrication services for new, inoperative, inadequate and/or failing County systems. All service, maintenance, service and chemical treatment shall be in strict accordance with all manufacturer specifications, recommendations and requirements, including, but not limited to, frequency, means, methods and consumable usage. Contractor may be required to work with other Contractors and County departments to ensure seamless system integration and operation of various County systems. Contractor shall provide sufficient, qualified, trained, experienced, certified if applicable, and background cleared personnel to service systems and equipment under the contract. Contractor shall provide, all labor, supplies, supervision, tools, transportation (including parking and travel), Personal Protection Equipment (PPE) and all necessary material and equipment to perform routine maintenance and service, including any special diagnostic or adjustment tools, equipment, instruments, and consumables required under manufactures maintenance specification, recommendations and County requirements. Contractor shall have readily available Safety Data Sheet (SDS) for any chemical or other potentially dangerous substances while performing any service on behalf of the County. Contractor shall provide and perform installation of software and firmware maintenance in accordance with manufacturer specifications and recommendations, as required. Contractor shall leave all equipment and software in unlocked condition. If passwords or access protection is required all control information shall be immediately documented and provided to authorized County project lead, at no additional cost. Contractor shall provide the County with a detailed proposed Scheduled Maintenance schedule for County approval, prior to commencement of work, including the number of hours per locations and number of technicians required to perform service under the terms of the contract. Under no condition, shall Contractor attempt to assign or subcontract any portion of maintenance or service under the contract without prior written approval, by authorized County project lead. Contractor shall provide detailed reporting on as-needed additional maintenance or service, to be coordinated with authorized County project lead. All quotes for additional services shall contain detailed labor and material charges and approved by County project lead prior to commencement of maintenance or service. At the request of the County, Contractor may respond to urgent corrective maintenance prior to submitting quotes for initial call out response. Contractor shall immediately notify authorized County project lead of any site conditions or changes affecting Contractor’s ability to perform services. Contractor Requirements Contractor shall prepare and submit all reports on inspections, testing, maintenance, and services as required by all regulatory agencies, within three (3) business days of service date, if applicable. Contractor shall make its best efforts to perform all activities in a manner to not impact or interrupt daily County operations. If such an impact or interruption is unavoidable, Contractor shall schedule and duly notify the authorized County project lead of pending disruption. Contractors shall plan all activities to minimize the number of times entering or exiting any facility and restrict all breaks to absolute minimums. Contractor shall maintain a minimum of two (2) cleared personnel at all times and available to perform maintenance and service throughout the County. Contractor shall not withhold emergency and/or any service relating to regulatory compliance, certification and/or is deemed critical to daily County operations for any reason during the term of the contract. All parts and materials shall be new commercial grade, meeting or exceeding the Original Equipment Manufacturers (OEM) specifications. Any part or material other than OEM shall be approved by County prior to being utilized. All parts and materials shall be available within seventy-two (72) hours upon service approval, by an authorized County project lead. Contractor shall maintain sufficient materials, PPE, consumables, and supplies available for immediate use to provide services under the terms of the contract. At all times Contractor shall keep on-hand spill containment equipment and kits sufficient to successfully mitigate spills and protect personnel and County property while performing any service. Contractor shall provide all barricades and warning devices to secure and protect work areas and sites. Contractor shall prevent unauthorized individuals from entering work area. Contractor shall perform all work in accordance with generally accepted industry standards and practices for safe and efficient operations unless a stricter standard is required by County project lead. County shall not provide any on-site storage of supplies, equipment, materials, or tools at any County facility, unless approved in writing by authorized County project lead. After completion of maintenance, or service Contractor shall provide County a Work Order report with details on work completed and any additional recommended work. Contractor shall keep all work areas clean and free from debris, rubbish, chemicals and hazardous waste and dispose of all waste off County property and in accordance with all State, Federal and Local laws and regulatory requirements. Contractor shall warrant all labor and materials for a minimum of ninety (90) days after completion of maintenance or service. Contractor shall extend to County the manufacturers’ full warranty period for all materials and replacement parts. Contractor shall repair, at no cost to the County, any and all damage caused by Contractor and shall report all accidents, injuries, spills, unusual conditions or activities, immediately to authorized County project lead, regardless of magnitude. License Requirement Contractor shall at all times, possess current applicable licenses, certifications and permits required by State, Federal and Local laws and regulatory agencies to perform tasks and duties under the contract. Contractor shall, for any relevant electrical work, possess current Valid C-10 Electrical Contractor License issued by the state of California and shall remain in good standing for the term of the contract. Contractor shall possess, or employ personnel with, current certifications in cooling tower maintenance, water treatment, and Legionella risk management. Contractor personnel shall be trained and compliant with the Cal/OSHA Aerosol Transmissible Diseases (ATD) standard, Title 8 CCR Section 5199. Contractor shall furnish all pertinent licenses, certifications, permits and fees necessary to perform work under the contract. Reserved Rights County reserves all rights to all information and data provided by Contractor, without further compensation. The County reserves the right to add, update, modify and improve equipment using the supplier of its choice. Contractor shall provide written comments, upon request by County, on any impact affecting Contractor’s ability to perform any tasks and duties under contract. Security, Safety and Personnel Contractor and employees performing services within secured facilities shall require to submit to background screening. No unscreened or unauthorized personnel shall be allowed to perform any task or duty under the contract. Contractors’ personnel shall renew background screening every two (2) years, or at the request of the County and immediately notify County of any potential changes affecting existing or future clearance. All Contractor personnel shall be identified by a distinctive Contractor logo, emblem or patch attached prominently on an outer garment. In the absence of uniforms, Contractor shall issue alternative identification. Acceptable forms include, but not limited to business cards, lanyards, or letter on Contractor letterhead. In addition to Contractors’ ID al Source: OpenGov https://procurement.opengov.com/portal/ocgov/projects/318158 Canonical URL: https://govcontractfinder.com/contracts/cooling-tower-maintenance-services-opengov-108-project-318158