County Road 220 Phase 2 – Milling and Resurfacing State and local opportunity open Clay County 25/26-119 Posted: 2026-10-16T13:32:05.537Z Response deadline: 2026-12-03T21:00:00.000Z Clay County Board of County Commissioners is requesting bids from qualified Contractors for CR 220 Phase 2 – Milling and Resurfacing. The project consists of a mill-and-fill operation along County Road 220, including milling approximately one and three-quarter inches (1.75") of existing asphalt pavement and resurfacing with two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C, in accordance with current Florida Department of Transportation (FDOT) Standards and Specifications. The project also includes maintenance of traffic, quality control, milling and resurfacing of designated turnouts, pavement markings, daily cleanup, and associated work necessary for a complete project. Work on CR 220 will be performed during nighttime hours between 7:00 p.m. and 5:30 a.m., with access maintained throughout construction. Bidders shall submit all inquiries regarding this RFB in the "Question and Answer" tab of the RFB. See "Inquiries/Questions" in the "Instructions to Bidders" below for more information. Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for Bids in any respect during the Request for Bid Period. The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final. The following exceptions exist to the no-contact rule: Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids; Pre-bid conferences provided for in the Request for Bids; and Formal presentations by Bidders to the designated Evaluation Committee or to the Board or any committee thereof specifically contemplated in the Request for Bids. The Board reserves the right and power to reject any and all Bids without cause and to waive technical and non-technical or non-material defects in the Request for Bids or submittal of any Bid, and in its discretion to re-advertise the Request for Bids. The Board reserves the right to award Request for Bids which would be in the Best Interest of the County. Interested vendors are advised that the Clay County Board of County Commissioners has a local preference policy and Buy American policy. The complete policy for both can be viewed at: https://www.claycountygov.com/government/purchasing/vendor-information. FOLLOWING THE BID OPENING AND TABULATION, A “NOTICE OF INTENT TO AWARD BID” OR A “NOTICE OF REJECTION OF ALL BIDS” WILL BE POSTED ON THE INTERNET AT: https://procurement.opengov.com/portal/claycounty?status=all. THIS WEBPAGE CAN ALSO BE ACCESSED FROM THE HOMEPAGE OF THE COUNTY’S WEBSITE AT: https://www.claycountygov.com/government/purchasing/formal-bid-solicitations PROSPECTIVE BIDDERS ARE NOTIFIED THAT THE FAILURE TO INCLUDE A PROPER BID BOND OR OTHER SECURITY APPROVED UNDER THE COUNTY’S PURCHASING POLICY, IF REQUIRED FOR THIS REQUEST, WILL RESULT IN REJECTION OF THE BID AND SHALL, AS WELL AS THE FAILURE TO FILE A WRITTEN NOTICE OF PROTEST AND TO FILE A WRITTEN PETITION INITIATING A FORMAL PROTEST PROCEEDING WITHIN THE TIMES AND IN THE MANNER PRESCRIBED IN CHAPTER 8, SECTION I OF THE COUNTY’S PURCHASING POLICY SHALL, CONSTITUTE A WAIVER OF THE RIGHT TO PROTEST THE BID REQUEST, ANY ADDENDUM THERETO, OR THE BID DECISION, AS APPLICABLE, AND TO INITIATE A FORMAL PROTEST PROCEEDING UNDER THE PURCHASING POLICY. THE COUNTY’S PURCHASING POLICY CAN BE VIEWED AT THE COUNTY’S WEBSITE BY FOLLOWING THE APPROPRIATE LINKS FROM THE HOMEPAGE ADDRESS SET FORTH ABOVE. IF A PROSPECTIVE BIDDER IS IN DOUBT WHETHER THIS REQUEST REQUIRES A BID BOND, SUCH PROSPECTIVE BIDDER IS SOLELY RESPONSIBLE FOR MAKING APPROPRIATE INQUIRY. THE BOARD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS WITHOUT CAUSE AND TO WAIVE TECHNICAL AND NON- TECHNICAL OR NON-MATERIAL DEFECTS IN THE REQUEST OR SUBMITTAL OF ANY BIDS. A PERSON OR AFFILIATE WHO HAS BEEN PLACED ON THE CONVICTED VENDOR LIST FOLLOWING A CONVICTION FOR A PUBLIC ENTITY CRIME MAY NOT SUBMIT A BID ON A CONTRACT TO PROVIDE ANY GOODS OR SERVICES TO A PUBLIC ENTITY, MAY NOT SUBMIT A BID ON A CONTRACT WITH A PUBLIC ENTITY FOR THE CONSTRUCTION OR REPAIR OF A PUBLIC BUILDING OR PUBLIC WORK, MAY NOT SUBMIT BIDS ON LEASES OF REAL PROPERTY TO A PUBLIC ENTITY, MAY NOT BE AWARDED OR PERFORM WORK AS A CONTRACTOR, SUPPLIER, SUBCONTRACTOR, OR CONSULTANT UNDER A CONTRACT WITH ANY PUBLIC ENTITY, AND MAY NOT TRANSACT BUSINESS WITH ANY PUBLIC ENTITY IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO FOR A PERIOD OF 36 MONTHS FROM THE DATE OF BEING PLACED ON THE CONVICTED VENDOR LIST. General Project Requirements Mobilization Maintenance of Traffic (MOT) Railroad Flagging Coordinator/Inspector and Associated CSX Requirements County Road 220 The limits of milling and resurfacing shall be as established in Section 3.2 – Project Location and Limits of Work. Milling - Over One Inch to Two Inches Asphaltic Concrete SP-12.5 Traffic Level C Tack Coat Pavement Marking, Bi-Directional Raised Pavement Marking Mono-Directional Raised Painted Pavement Marking, Skip (6") (White) - Net LF Painted Pavement Marking, Skip (6") (Yellow) - Net LF Painted Pavement Marking, Solid (12") (White) Painted Pavement Marking, Solid (18") (Yellow) Painted Pavement Marking, Solid (24") (White) Painted Pavement Marking, Solid (6") (White) Painted Pavement Marking, Solid (6") (Yellow) Painted, DIRECTIONAL ARROW (LEFT/RIGHT) Painted, ONLY Thermo, DIRECTIONAL ARROW (LEFT/RIGHT) Thermo, ONLY Thermo, Standard, WHITE, SOLID, 12" Thermo, Standard, WHITE, SOLID, 24" Thermo, Standard Bike Path Markings, Symbol with Arrow Thermo, Solid (18") (Yellow) Thermo, Solid (6") (White) Thermo, Solid (6") (Yellow) Thermo, Skip (6") White - Net LF Thermo, Skip (6") Yellow - Net LF Painted, Railroad Crossing Pavement Marking/Symbol Thermo, Railroad Crossing Pavement Marking/Symbol Scope of Work Purpose The Clay County Board of County Commissioners (County) is requesting bids from qualified Contractors to provide milling and resurfacing services along designated portions of County Road 220 (CR 220) in Clay County, Florida. The Work generally consists of milling the existing asphalt pavement, placement of new asphalt pavement, maintenance of traffic, pavement markings, turnout resurfacing, cleanup, and all labor, materials, equipment, supervision, quality control, and incidental work necessary to provide a complete project in accordance with the Contract Documents. All Work and materials shall comply with the current Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction, applicable FDOT Standard Plans, the Manual on Uniform Traffic Control Devices (MUTCD), and all applicable County requirements, unless otherwise specifically stated in the Contract Documents. Project Location and Limits of Work The Project is located along County Road 220 (CR 220) in Clay County, Florida. The limits of milling and resurfacing shall extend from the existing new asphalt pavement joint just west of Lakeshore Drive to the clearly defined asphalt pavement joint immediately east of the railroad crossing near Sleepy Hollow Road, as identified in the RFB and directed by the County Project Manager or designee. No Work shall be performed within the CSX railroad right-of-way. Milling and resurfacing limits shall begin and end at the established CSX railroad right-of-way boundaries, as applicable. The Contractor shall verify the limits of Work in the field with the County Project Manager or designee prior to beginning milling operations. Work within the Project limits shall include the designated travel lanes, turnouts, pavement markings, and associated areas identified by the County. Concrete travel lanes are excluded from milling operations. No pavement markings shall be installed, removed, or refurbished on the concrete bridge deck over Swimming Pen Creek. Scope The Work includes, but is not limited to, milling existing asphalt pavement, placement of Asphaltic Concrete SP-12.5, Traffic Level C, milling and resurfacing designated turnouts, pavement markings, maintenance of traffic, cleanup, and associated roadway work within the Project limits. The Contractor shall furnish all labor, materials, equipment, supervision, transportation, quality control, maintenance of traffic, and incidentals necessary to complete the Work in accordance with the RFB and current applicable FDOT Standards and Specifications. Pre-Qualifications Contractors shall be Florida Department of Transportation (FDOT) Pre-Qualified in the following work classes: Flexible Paving Hot Plant-Mixed Bituminous Courses The above requirements shall also apply to all subcontractors performing work for which the applicable FDOT prequalification is required. General Requirements Mill and Fill Operation The Project shall be performed as a mill and fill operation. The Contractor shall mill the existing asphalt pavement to a depth of one and three-quarter inches (1.75") and place two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C, in accordance with the Contract Documents and current applicable FDOT Standards and Specifications. Milling Operations Milling shall be performed to a depth of one and three-quarter inches (1.75") to provide a uniform surface suitable for placement of the proposed asphalt course. The Contractor shall maintain the required pavement profile, cross slope, drainage characteristics, and transitions throughout the limits of Work. The Contractor shall take all necessary precautions to protect existing curb and gutter, drainage structures, manholes, valve boxes, pavement structures, utilities, and other improvements within or adjacent to the limits of Work. Concrete travel lanes shall not be milled. The Contractor shall identify and protect concrete pavement located within or adjacent to the limits of Work. Milled surfaces shall be thoroughly swept and cleaned prior to placement of asphalt or reopening the roadway to traffic. Loose material shall not be permitted to enter drainage structures, adjacent properties, or County rights-of-way. Asphalt Resurfacing Following completion of milling and preparation of the existing pavement surface, the Contractor shall place two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C in accordance with current FDOT Standards and Specifications. Asphalt mixtures shall be FDOT-certified mixes. The Contractor shall submit the applicable Job Mix Formula (JMF) to the County Project Manager for review and approval prior to placement. The Contractor shall provide smooth transitions between new and existing pavement and shall correct deficiencies, irregularities, segregation, unacceptable joints, or other defective Work at no additional cost to the County. Turnouts The Contractor shall mill and resurface the following intersection turnouts within the Project limits. The anticipated limits of Work shall extend from the CR 220 mainline to the existing pavement joint or end of curb, as identified below: Harmony Hall Road – Approximately 50 feet. Swimming Pen Drive – Approximately 95 feet. Yarmouth Drive – Approximately 35 feet. Kel Lane – Approximately 35 feet. Southlake Drive – Approximately 33 feet. Lakedge Drive – Approximately 30 feet. Lakemont Circle (East Entrance) – Approximately 30 feet. Lakemont Circle (West Entrance) – Approximately 30 feet. The distances provided are approximate and establish the anticipated milling and resurfacing limits for bidding purposes. Final turnout limits shall be field verified and coordinated with the County Project Manager or designee prior to commencement of milling operations. Night Operations All Work performed on CR 220 shall be conducted between the hours of 7:00 p.m. and 5:30 a.m. The Contractor shall schedule and coordinate operations to ensure the roadway is left in a safe condition for daytime traffic at the conclusion of each nightly work period. Equipment, materials, debris, and temporary traffic-control devices not required for daytime traffic conditions shall be removed from the travel way prior to reopening the roadway. Quality Control The Contractor shall provide an onsite qualified Quality Control Supervisor during all milling and paving operations and shall perform all required quality-control activities, testing, documentation, and reporting in accordance with applicable FDOT requirements. Pavement Markings The Contractor shall replace pavement markings removed or affected by milling and resurfacing operations. Repainting of existing worn pavement markings outside the resurfacing limits is not required. Temporary and permanent pavement markings shall comply with applicable FDOT and MUTCD requirements. Existing centerlines, lane lines, edge lines, arrows, messages, symbols, raised pavement markers, and other pavement markings affected by the Work shall be restored as applicable and in accordance with the Pricing Proposal/Schedule of Values (SOV). When temporary pavement markings are required for traffic safety, they shall be installed the same day as milling or resurfacing. Required centerlines and other safety-related temporary markings shall be established prior to reopening the roadway to traffic and maintained until permanent pavement markings are installed. Mono-Directional Raised Pavement Markers (RPMs) shall be installed along the mainline roadway only. Island nose pavement markings and school-related pavement markings are not required for this Project. Stop bars and crosswalk pavement markings at applicable side street intersections shall be included in the Work in accordance with the Pricing Proposal/Schedule of Values (SOV). All crosswalks requiring replacement within the Project limits shall be installed as Special-Emphasis Crosswalks in accordance with current applicable FDOT Standards and Specifications, regardless of the existing pavement marking configuration. The 24-inch crosswalk bars shall be installed using standard thermoplastic pavement markings. Preformed thermoplastic is not required for these crosswalk bars. Railroad crossing pavement markings and symbols shall be replaced using both painted and thermoplastic applications in accordance with applicable FDOT Standards and Specifications and the Pricing Proposal/Schedule of Values (SOV). No Work shall be performed within the CSX railroad right-of-way. Bicycle pavement markings shall be replaced using thermoplastic only. An initial painted application is not required. No pavement markings shall be installed, removed, or refurbished on the concrete bridge deck over Swimming Pen Creek. Final Inspection and Acceptance Upon completion of the Work, the Contractor shall participate in a mandatory final walkthrough with the Clay County P Maintenance of Traffic (MOT) The Contractor shall furnish, install, maintain, and remove all Maintenance of Traffic (MOT) devices necessary to safely perform the Work in accordance with the current applicable FDOT Standard Plans/Indexes and the Manual on Uniform Traffic Control Devices (MUTCD). Post-mounted advance warning signs and Portable Changeable Message Signs (PCMS) are not required for this Project. The Contractor shall remain responsible for providing and maintaining safe and adequate MOT throughout the Project in accordance with applicable FDOT Standards and Specifications. Traffic shall be maintained throughout construction. The Contractor shall maintain access to adjoining roadways, residences, businesses, emergency services, and other properties at all times. The Contractor shall provide all required MOT plans and qualified/certified personnel in accordance with applicable FDOT requirements. A copy of the approved MOT plan shall be maintained onsite during construction. A law enforcement officer shall be provided for nighttime work activities requiring lane or roadway closures. All costs associated with providing, implementing, maintaining, and removing required traffic control measures, including required nighttime law enforcement officers, shall be included in the Maintenance of Traffic (MOT) lump-sum pay item identified in the Pricing Proposal. The lump-sum bid price shall constitute full compensation for these activities, and no separate payment shall be made unless otherwise expressly provided in the Contract Documents. Special Terms and Conditions Unit prices as received shall constitute full compensation to the Contractor for all labor, materials, equipment, supervision, incidentals, and associated activities necessary to complete the Work. No separate payment will be made for work required by the Contract Documents unless specifically identified as a separate pay item. Site Inspections It is incumbent upon all Bidders to examine the site and ensure that they are aware of all conditions that may affect the contract work. The County will not be responsible for conclusions made by the Contractor. No claims for additional compensation will be considered on behalf of any Contractor, subcontractor, materials suppliers or others on account of that person’s failure to be fully informed of all requirements of all parts of this RFB. Work Hours Due to the nighttime operational requirements of this Project, the approved work hours for CR 220 shall be 7:00 p.m. to 5:30 a.m. Work shall be scheduled and performed within these hours unless otherwise approved by the County Project Manager or designee. Any work performed outside of the approved work hours shall require prior County approval. Any additional expenses incurred by the County as a result of Contractor-requested work outside of the approved work hours may be the responsibility of the Contractor. Self-Performed Work The awarded Contractor is required to self-perform with its own workforce a minimum of forty percent (40%) of the overall awarded Contract. Hazardous Materials The Contractor shall notify the County Project Manager or designee of any hazardous materials used or stored on the Work site and shall maintain and provide applicable Safety Data Sheets (SDS) in accordance with applicable federal, state, and local requirements. Any spill or release of hazardous materials or waste caused by the Contractor or its subcontractors shall be immediately reported to the County Project Manager or designee and shall be contained, cleaned up, and disposed of in accordance with all applicable federal, state, and local laws and regulations. All costs associated with the cleanup, remediation, and disposal of any spill or release caused by the Contractor or its subcontractors shall be the sole responsibility of the Contractor at no additional cost to the County. Upon request, the Contractor shall provide documentation demonstrating compliance with applicable regulatory requirements associated with any required cleanup. Permit & Fees The Contractor shall obtain and maintain all permits, licenses, approvals, and inspections required to perform the Work in accordance with the Contract Documents and applicable federal, state, and local requirements. Unless otherwise specified in the Contract Documents, the Contractor shall be responsible for all applications, coordination, permits, inspections, fees, bonds, and other charges necessary to perform and complete the Work. If a County permit is required, the Project is not exempt from permit fees, and applicable fees shall be pa Source: OpenGov https://procurement.opengov.com/portal/claycounty/projects/306561 Canonical URL: https://govcontractfinder.com/contracts/county-road-220-phase-2-milling-and-resurfacing-opengov-4038-project-306561