DAY DOCK AT RIVERWALK PARK State and local opportunity open City of Port Orange ITB-26-26-CW Posted: 2026-11-09T21:29:55.825Z Response deadline: 2026-12-11T19:30:00.000Z As part of the comprehensive Riverfront Park development enhancement and public access, the City of Port Orange is seeking to build a Day (transient) Docking facility. The intent of this Day Dock facility is to provide recreational boaters access to the City's landward park amenities. The current intent is to develop a phased approach that will ultimately allow the City to accommodate up to 35-foot boat vessels. This project will accommodate mooring of up to ten (10) vessels with a potential to add more slips as demand increases. Currently there is no ability for boaters to dock to use the park facility and amenities at this location. This project will increase transient docking availability which allows all boaters along the ICW to safely dock and use the park especially larger transient boats. SECTION 3 - SCOPE OF WORK SCOPE OF WORK: This project involves the installation of a fixed timber access dock, one aluminum gangway, a concrete floating dock system, along with the necessary concrete piles for the floating dock system. Additionally, the project includes mechanical dredging, installation of private aids to navigation, concrete sidewalk and curbing, fire hydrant, FDC & standpipe system, dock lighting and electrical utilities, mangrove plantings and an environmental informational kiosk with environmental signs and a monofilament bin, as specified in the construction plans and technical specifications provided in the bid package. The project site is located within the Florida Intracoastal Waterway (ICW), and all work related to erosion and turbidity monitoring and control, in compliance with state and federal regulations, is part of the project scope. Please refer to (Attachment 2) Project Technical Specifications, (Attachment 3) Construction Drawings, (Attachment 4) Geotechnical Evaluation and (Attachment 5) Environmental Permits. LEGAL NOTICE TO BIDDERS (MANDATORY) ITB-26-26-CW - DAY DOCK AT RIVERWALK PARK Notice is hereby given that the City of Port Orange is soliciting proposals for ITB-26-26-CW - DAY DOCK AT RIVERWALK PARK . Bids will be accepted in until 2:30 pm Eastern Standard Time (EST) on Friday, December 11, 2026 , which may be amended by addendum issued by the City. All untimely bids will be rejected. All bids will be evaluated to ensure they contain all the required forms in order to deem the Respondent responsive or non-responsive. Bids will be opened and bidder(s) names and price will be read aloud at 2:30 pm EST in the Council Chambers located on the first floor of City Hall, 1000 City Center Circle, Port Orange, Florida 32129. Note : Bids read aloud at the bid opening is not binding until there has been a responsive and responsible review by Purchasing in determining who is the lowest price, responsible, and responsive bidder . There will be a mandatory Pre-Bid Conference and site visit for the project at 10:00 am EST on Monday, November 16, 2026 at Council Chambers, located at the City of Port Orange at 1000 City Center Circle, Port Orange, FL 32129. Site visit will follow after the Pre-Bid meeting. . In order to be eligible to submit a bid, prospective bidders must attend the mandatory Pre-Submittal Conference and Site Visit. All attendees to the Pre-Submittal Conference MUST sign in. The representative of each Bidder shall be an authorized employee of the Bidder and shall sign in accordingly. Bidders are urged to obtain bid documents and familiarize themselves with the documents prior to the Pre-Submittal Conference. Site Visit - Day Dock at Riverwalk Park, 3459 Ridgewood Avenue, Port Orange, Florida 32129 November 16, 2026, at 10:00 am. DESCRIPTION: DAY DOCK AT RIVERWALK PARK . As part of the comprehensive Riverfront Park development enhancement and public access, the City of Port Orange is seeking to build a Day (transient) Docking facility. The intent of this Day Dock facility is to provide recreational boaters access to the City's landward park amenities. The current intent is to develop a phased approach that will ultimately allow the City to accommodate up to 35-foot boat vessels. This project will accommodate mooring of up to ten (10) vessels with a potential to add more slips as demand increases. Currently there is no ability for boaters to dock to use the park facility and amenities at this location. This project will increase transient docking availability which allows all boaters along the ICW to safely dock and use the park especially larger transient boats. Bidders must be a commercial entity licensed to do business in the State of Florida and perform the services identified herein. Bidders must be properly registered and licensed to provide the services identified in the scope of work, by all applicable state and local agencies. All Invitation to Bid (ITBs) are solicited and will be evaluated on the requirements outlined in the ITB. Copies of the bid documents, requirements, scope of service and all other pertinent information necessary to submit a complete package may be obtained electronically from the City of Port Orange Purchasing web page at www.port-orange.org/bids.aspx and OpenGov at https://procurement.opengov.com/portal/portorangefl . All questions must be submitted electronically via https://procurement.opengov.com/portal/portorangefl . Last day for questions will be Monday, November 23, 2026 at 4:00 pm EST. The Cone of Silence begins with the issuance of the solicitation document and continues until City Council meets to make a final decision on an award. During this time respondents, suppliers, contractors and sub-contractors are prohibited from all communications regarding the solicitation with City staff, City consultants, City legal counsel, City agents, or elected officials. Any respondent who initiates any discussions or attempts to influence a member or members of the aforementioned shall be disqualified from continued participation in the procurement process with regard to that particular solicitation. While the Cone of Silence is in effect, all communications from potential respondents, suppliers, contractors and sub-contractors must be directed to the Purchasing Division @ purchdiv@port-orange.org . SPECIAL NOTE : The City of Port Orange has transition from DemandStar to OpenGov for our solicitations. Since this is a new platform for the City, and for the Bidders submitting, we will be offering two different ways in submitting a bid, which is considered a Hybrid submittal for soliciting projects for a limited time only for which the City will be requesting electronic bids only . As of right now, Bidders are required to submit BOTH an electronic submittal and a hand-delivered submittal . In addition to submitting electronic bids, bidders are also required to submit a hard copy to the City desiring to provide services, as described herein shall submit sealed bids in addition to submitting one (1) original and one (1) digital (flash drive) version in PDF format, in conformance with the detailed submittal instructions. If Bidders are not familiar with OpenGov, the platform is FREE in creating an account and signing with OpenGov by signing up at https://procurement.opengov.com/login. For more information, please refer to the solicitation documents on this change. The City invites bidders to respond to this Initiation to Bid (ITB) for the DAY DOCK AT RIVERWALK PARK . The City anticipates to awarding to one (1) responsible and responsive bidder. The contract term will be for one hundered eight (180) days from issuance of Notice to Proceed. Bids received after the submission deadline will be rejected. It is the bidder's responsibility to ensure they commence their upload submittal timely to meet the submission deadline. The City shall not be responsible for delays caused by an occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. On-line Pro SECTION 1 - PURPOSE AND OVERVIEW The purpose of this Invitation to Bid (ITB) is to solicit competitive bids from Firms or Companies (Bidders) for the The purpose of this Invitation to Bid (ITB) is to solicit competitive sealed bids from Firms or Companies (Bidders) for the Day Dock at Riverwalk Park. The awarded bidder is required to provide all the necessary labor, services, supplies, equipment, tools, consumables, transportation, skills, and incidentals incidentals to mechanically dredge within the proposed location to construct a new fixed timber dock, with a concrete floating dock system, installation of private aids to navigation, Fire Department Connection (FDC) services. This project has obtained grant funding from Florida Inland Navigation District (F.I.N.D.) and City funding sources. It is the intent and purpose of the City of Port Orange (City) that this ITB promotes competitive selection. It shall be the Bidder’s responsibility to advise the Purchasing Division if any language, requirements, etc. or any combination thereof, inadvertently restricts or limits the requirements stated in the ITB to a single source. Only one (1) bidder will be selected from this solicitation. [Remainder of this page left internationally blank] SECTION 2 - INSTRUCTION TO BIDDERS The City of Port Orange is now using OpenGov for soliciting city projects. Bidders who are not listed in OpenGov, will need to be register as soon as possible so in order to submit on this project electronically. Bidders shall create a FREE account with OpenGov by signing up at h ttp s:// p rocurement.o p en g ov.com/lo gi n . Once you have completed account information, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic submittal. Bidders are required to submit an electronic submittal. The City invites bidders to respond to this Initiation to Bid (ITB) for the DAY DOCK AT RIVERWALK PARK . The City anticipates to awarding to one (1) responsible and responsive bidder. The contract term will be for o ne hundred eighty (180) days from Issuance of Notice to Proceed. Bids received after the submission deadline will be rejected. It is the bidder's responsibility to ensure they commence their upload submittal timely to meet the submission deadline. The City shall not be responsible for delays caused by an occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. On-line Provider Disclaimer The City of Port Orange Purchasing Department is the official source to obtain information relating to the City solicitations. All documents regarding this solicitation are posted utilizing an online bid management system, OpenGov. There is no charge to register with OpenGov and/or to participate in the solicitation process. This is a third-party provider that provides a platform to communicate solicitation information to the Public. OpenGov does not represent the City nor does communications through this provider constitute communications to the City. The City of Port Orange is not responsible for errors and omissions occurring in the transmission or downloading of any documents from the online website. In the event of any discrepancy between information on this website and the hard copy specifications, the terms of the hard copy specification will control. Offers by telephone, email or fax will not be accepted. All bids will be opened publicly and the names of all Bidders shall be read aloud. All conferences and meetings regarding this ITB are recorded electronically (audio only). The City of Port Orange reserves the right to reject any or all bids or parts of bids if it is in the best interest of the City. Offers by telephone, email or fax will not be accepted. All bids will be opened publicly and the names of all Bidders shall be read aloud. All conferences and meetings regarding this ITB are recorded electronically (audio only). The City of Port Orange reserves the right to reject any or all bids or parts of bids if it is in the best interest of the City. OpenGov Technical Support: For Technical Support, Respondents can reach the OpenGov Service Desk: Chat (preferred): Click the button in the lower right-hand corner of the portal. Email: https://procurement.opengov.com/login Phone: 1 (605) 336-7176 Hours: Mon-Fri 7am - 10pm ET Timely Questions Regarding this Solicitation The questions and answer module of OpenGov is being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, November 23, 2026 4:00 pm ET. Respondents are instructed not to contact the initiating division directly. Consideration for modification or alternation of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other contract documentation shall be considered binding. The City shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Purchasing Division. Answers for timely questions will be addressed in the OpenGov questions and answer module and an addendum to those questions will be issued and uploaded onto OpenGov. Beyond questions and answers, any and all modifications, clarifications, interoperations and supplemental instructions will be in the form of a written addenda which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documentation and receipt shall be acknowledged of any addenda before formally submitting a bid for this project. Untimely questions are unable to be submitted in the question-and-answer module, thereafter, Respondents raising critical concerns must email purchdiv@port-orange.org. Critical clarifications may be made via addenda; however, untimely questions may not be considered. ADDENDA The City will issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the bid due date. Bidders should not rely on any representations, statements or explanations other than those made in this ITB or in any addendum to this ITB. Where there appears to be a conflict between the ITB and any addenda issued, the last addendum issued will prevail. The Bidder should verify prior to submitting a bid that all addenda have been received and reviewed. All addenda will be published on the City Purchasing web page at www.port‐orange.org/bids.aspx and the OpenGov website at h ttp s:// p rocurement.o p en g ov.com/lo gi n . The City of Port Orange reserves the right to consider the omission of an acknowledgment of addendum as cause for rejection of the ITB submittal. This provision exists solely for the convenience and administrative efficiency of the City of Port Orange. No Bidder or other third party gains any rights by virtue of this provision or the application thereof, nor shall any Bidder or third party have any standing to sue or cause of action arising therefrom. CLARIFICATIONS It is the Bidder’s responsibility to become familiar with and fully informed regardi SECTION 4 - STANDARD PURCHASING DEFINITIONS The City will use the following definitions in instructions to respondents, terms and conditions, special provisions, technical specifications and any other solicitation documents. Addendum is a formal written document, released prior to the public opening that modifies any aspect of a solicitation. Plural: Addenda Alternate Bid means multiple bids with substantive variations from the same Bidder in response to a Solicitation. Amendment is a formal written agreement, signed by both parties, that modifies and existing contractual agreement. Appropriate, Appropriated or Appropriation means the adoption by the City Council of the City of a budget for a fiscal year that includes payments to be made under the Contract during the respective fiscal year. Best Value means the highest overall value to the City based on factors that include, but are not limited to, price, quality, design and workmanship. Bid is a complete, properly signed response to an Invitation to Bid, which if accepted, would bind the Bidder to perform the resultant Contract. Bid Guaranty (Bid Bond) guarantees that the Bidder will not withdraw the Bid within the period specified for acceptance and will execute a Contract and furnish required bonds and any necessary insurance within the time specified in the solicitation unless a longer time is allowed by the City. The guarantee will be returned to the Bidder upon execution of a Contract. Bidder, Proposer or Respondent is a person, firm or entity that submits a Response to a Solicitation. Any Bidder, Proposer or Respondent may be represented by an agent after submitting evidence demonstrating the agent’s authority. The agent cannot certify as to his own agency status. City means the City of Port Orange. Competitive (Formal) Solicitation is the process of requesting and receiving two or more sealed bids, proposals, statements of qualifications or replies submitted by responsive Bidders or Respondents in accordance with the terms of a competitive process, regardless of the method of procurement. Competitive Negotiation means a method for acquiring good, services and construction for public use in which discussions or negotiations may be conducted with responsible offerors who submit Responses through a competitive process, regardless of the method or procurement. Competitive Range means the responsive submissions that meet the evaluation criteria and are considered to be reasonably susceptible of award. Construction means the process of building, repairing, improving and alterations, conversion or extension of buildings, parks, utilities, streets or other improvements or alterations to real property. Contract is a written agreement or purchase order issued for the purchase of goods or services. Contractor means the person, firm or entity selling goods or services to the City under a Contract. Deliverables means the goods, products, materials and/or services to be provided the City by a Bidder or Respondent. Due Date means the date and time specified for the receipt of responses to a solicitation. End User is a person, program, agency or other eligible user who uses a contract to purchase a commodity or contractual service. Evaluation Committee/Team is a temporary group of City personnel who are responsible for the evaluation of proposals as part of a Request for Proposals (RFP), Request for Statements of Qualifications (RFSQ) or competitive grant process. Evaluator is a member of the evaluation committee/team Goods are supplies, materials, or equipment. Intent to Award is a document that informs the public and respondents of the City’s decision to award a contract pursuant to a previously issued competitive solicitation. Invitation to Bid (ITB) or Bid means a formal request to prospective Bidders requesting pricing for a specified Good or Service which has been advertised for bid in a newspaper. Invitation to Negotiate (ITN) means a formal request to prospective proposers requesting proposed specifications and pricing of a product and/or service which has been advertised for replies in a newspaper. Issues means points, matters or concerns to be addressed during negotiations. Lead Negotiator is the negotiator responsible for leading and facilitating the formal negotiation discussions and selecting other required negotiation team members. Is often the “driver of change” and seeks alternatives/options. Lowest Responsible Bid means the responsive bid meeting all requirements of the specifications, terms, and conditions of the Invitation to Bid resulting in the lowest cost to the City in a total cost concept or based solely on price, taking into consideration the financial and practical ability of the Bidder to perform the Contract, past per Source: OpenGov https://procurement.opengov.com/portal/portorangefl/projects/320063 Canonical URL: https://govcontractfinder.com/contracts/day-dock-at-riverwalk-park-opengov-38619616-project-320063