Deep Injection Well Acidization Services - Northwest Water Reclamation Facility (NWWRF) State and local opportunity open City of St. Petersburg IFB- 26 - 349 Posted: 2026-11-09T19:07:32.933Z Response deadline: 2026-12-10T20:00:00.000Z The City of St. Petersburg is seeking a qualified Contractor to provide Deep Injection Well Acidization (DIW) services on three (3) injection wells at the City’s Northwest Water Reclamation Facility (NWWRF), located at 7500 26th Avenue North, St. Petersburg, Florida 33710. The Contractor shall perform the DIW acidization services one well at a time. The work will include the removal and replacement of the wellhead, acidization of the injection well, and all activities necessary to return the well to normal service. This project is intended to maintain the performance and reliability of the facility’s treatment processes and reduce the risk of conditions that could adversely affect plant operations and regulatory compliance. The Specifications included in these Contract Documents establish the performance and quality requirements for material, equipment and the minimum standards for the quality of workmanship for the acidization per the Florida Department of Environmental Protection (FDEP) Underground Injection Control (UIC) permitted Class I Deep Injection Wells (DIWs). This contract will include the acidization of only the following injection wells: Injection Well IW-1, IW-2 and IW-3. Deep Injection Well Acidization Services - NWWRF All line items shall include all necessary equipment, tools, materials, manpower, delivery, and labor costs required to fully and properly complete the scope of services in accordance with the Scope of Work. Mobilization & Clean up DIW Wellhead Piping & Appurtenances Disconnection Furnish, Install, and Remove Temporary Flow-Control Wellhead and Acid Delivery Piping Acid Storage & Secondary Containment 32% Hydrochloric Acid (35,000 gallons of HCL per well with corrosion inhibitor, NSF/ANSI 60 approved) Well Acidization DIW Wellhead Piping & Appurtenances Reconnection Artesian Well Control Scope of Work Scope of Services The City of St. Petersburg is accepting bids for Deep Injection Well Acidization Services - Northwest Water Reclamation Facility (NWWRF) . The City will award to one contractor. Term The work under this Agreement shall commence upon a notice to proceed issued by the City's Project Manager. The Vendor shall complete all DIW acidization work within two (2) calendar weeks (14 calendar days) from the date work commences. Any anticipated delays must be communicated to the City and shall be subject to the City's approval. Preferred Qualifications Contractor shall: Have a minimum of two (2) years experience in providing Deep Injection Well (DIW) acidization services. Have the ability to obtain the minimum insurance requirements set forth in the agreement. Be free from legal and regulatory matters that might prevent the Contractor from fulfilling the obligations of the agreement. Notice The Contractor is advised that the DIWs provide long-term disposal of reclaimed water produced by the WRFs. Minimizing the time that the DIW(s) are unavailable due to acidization activities is critical to WRF operations. The Contractor shall perform acidization activities on only one DIW at a time and shall limit the period of unavailability of each DIW to a maximum of two (2) calendar days. The Contractor shall anticipate that the DIW(s) may be under artesian flow conditions with positive wellhead pressure. The Contractor shall take all necessary precautions and implement appropriate controls to maintain control of well flow at all times and prevent uncontrolled discharge of water or other fluids onto the ground surface or into surface waters. General Requirements The Contractor shall provide all labor, materials, tools, equipment, experienced personnel, documentation, and replacement parts necessary to perform the services set forth in the scope. The Contractor shall furnish qualified and experienced personnel with demonstrated experience in Deep Injection Well (DIW) wellhead removal and installation, flowing well control, and acidization of large-diameter DIWs under artesian flow conditions to perform DIW acidization services, as described in the Scope of Work, on three (3) wells at the City's NWWRF, located at 7500 26th Avenue North, St. Petersburg, Florida 33710. The work shall be performed on one (1) well at a time. The Contractor shall own or have immediate access to the equipment required to provide services. Contractor shall possess a Florida Water Well Contractors License. The contractor and its personnel shall not make any representations about this project without the written approval from the City. The contractor shall maintain a superintendent on-site during all wellhead removal/replacement and well Acidization operations. The Contractor shall coordinate its Work with the ongoing operations of the facility to minimize interference with City operations. Any difficulty, conflict, or dispute that may affect the performance or coordination of the Work shall be immediately brought to the attention of the City Project Manager. The contractor’s project superintendent shall attend coordination meetings as needed during well acidization activities as requested by the City. No additional charge shall be made to the city for attendance at such meetings. The contractor shall take special precautions to minimize the nuisances and damages to property or the environment which could result from working in an industrial and residential area. Areas of operations have the potential to flood during periods of heavy rain events. The contractor shall be responsible for ensuring safety and protection of its equipment and personnel. Any damage to public or private property, caused by the contractor, shall be immediately repaired at the contractor’s sole expense. Equipment, tools and material shall be located in the area designated by the City . The contractor may use discharge areas designated by the City during Acidization if proposed discharge meets minimum water quality requirements, as determined by the City. The contractor shall receive written approval from the city prior to discharging any waters onsite. The Contractor shall comply with all applicable federal and State of Florida laws, rules, regulations, and agency requirements governing the protection of aquifers, surface waters, streams, and rivers. The Contractor shall not discharge or dispose of any deleterious substances, waste,. refuse, rubbish, debris, or other materials in a manner that may cause pollution or contamination The Contractor shall not cause or permit the release of low-pH water, high-salinity water, sediments, solids, or other materials outside of designated containment areas. The Contractor shall be solely responsible for any property damage, cleanup and remediation costs, or regulatory fines resulting from such releases caused by the Contractor’s operations. The contractor shall be responsible for security of its equipment and personal for the duration of the project. The contractor shall access the facility through the gate designated by the city. Contractor personnel shall show a picture identification card issued by the respective employer when requesting access. The gate shall remain closed at all times except during times of ingress and egress. All contractor's subcontractor personnel will sign in and sign out of the WRF facility Visitor Log each and every time they enter and leave the facility. Technical Requirements Contractor Shall: MOBILIZATION, SITE RESTORATION, AND CLEANUP Mobilize and set up all equipment required to perform the DIW acidization. The Contractor shall use only the area designated by the City for temporary Contractor facilities, as identified prior to commencement of the Work. Mobilize and set up temporary storage tanks, secondary containment, transfer pumps, as required, and temporary piping at the DIW. Secondary containment shall be constructed of materials compatible with HCl, soda ash, and all other chemicals used in the acidization process. Secondary containment shall encompass all chemical storage areas, piping and hoses to and from the well, pumps, and other components that may come into contact with acid or treatment chemicals. Secondary containment shall be required regardless of whether chemical storage tanks are located on the concrete well pad. Prevent contamination of the project area. The contractor shall not discharge or dispose of waste oil, rubbish, or other materials on the ground. The Contractor shall perform all cleanup and remediation resulting from contamination caused by the Contrcator, its employees, or subcontractors at no additional cost to the City. Prevent spills or releases of acid, acidic water, saline water, or other fluids generated during the acidization process. The Contrcator shall be responsible for all cleanup and remediation resulting from releases caused by its personnel, equipment, or materials. Keep the project area clean and orderly throughout the Work. Upon completion, the CONTRACTOR shall repair any damage caused by its operations or equipment and remove all rubbish, debris, and excess materials from the project area. Restore the DIW(s) to fully operational service upon completion of the acidization operations. ACIDIZATION REQUIREMENTS If required, kill the well using a concentrated, food-grade sodium chloride solution. Disconnect and remove the DIW wellhead piping and appurtenances as necessary to perform the acidization work. Install a temporary flow-control wellhead assembly rated for a minimum working pressure of 250 PSI. Install 2-inch-diameter acid delivery piping to a depth of approximately 60 feet below land surface (BLS), along with calibrated flow meters, pressure gauges, pressure relief valves, and all associated equipment necessary to perform the acidization. Furnish and inject approximately 35,000 gallons of 32 percent hydrochloric acid (HCl) per well, or quantities as directed by the City, with corrosion inhibitor. All chemicals shall be NSF/ANSI Standard 60 approved. Inject the acid in batches at a rate of up to 150 gallons per minute (gpm) using metered flow control. Monitor flow rates and wellhead pressure throughout the injection process and relieve pressure as necessary. Following placement of each batch of acid, open the injection valve and pump reclaimed water into the DIW at a rate not exceeding the well's permitted injection rate. Pump approximately two to three well volumes of reclaimed water into the DIW. Following placement of the final batch of acid, flush the well for approximately one to two hours at a rate not exceeding the well's permitted injection rate. Monitor flow rates and wellhead pressure throughout the flushing process. Following flushing, allow the acid solution to remain in the DIW for approximately 16 hours. City staff shall monitor wellhead pressure throughout this period and relieve excessive pressure, as necessary. Upon completion of the acidization process, remove the temporary flow-control wellhead and demobilize all temporary acid delivery piping and associated equipment. Reinstall and reconnect the DIW wellhead piping, appurtenances, and instrumentation, and restore the DIW to fully operational status. Provide all other services, equipment, labor, and materials necessary to successfully complete the DIW acidization. Schedule of Services Services shall be performed between normal working hours, 7:00 a.m. to 5:00 p.m., Monday through Thursday. The City may approve or require modifications or extensions to the work hours and days as necessary. The Contractor shall avoid performing Work on City recognized holidays unless otherwise approved by the City. Deliverables The Contractor shall submit the following documentation to the City prior to commencement of DIW acidization operations: Manufacturer’s technical specifications and Safety Data Sheets (SDS) for all inhibitor chemicals. Manufacturer’s certification of food-grade sodium chloride. Manufacturer’s technical specifications for the acid conveyance piping. Volume and construction details of the HCl secondary containment system. Safety Data Sheets (SDS) for the HCl, including documentation of NSF/ANSI Standard 60 compliance. Manufacturer’s certification of HCl concentration/strength. The vendor shall provide material delivery manifests for each acid delivery under this solicitation, at the time of delivery. Upon award of the Contract and prior to the commencement of DIW acidization operations, the Contractor shall prepare and submit to the City for review and approval a detailed operations schedule using Microsoft™ Project. The schedule shall include the anticipated start and completion dates for each phase of the work, as well as any other major activities or events the Contractor deems necessary to successfully complete the work. During acidization operations, the CONTRACTOR shall maintain a detailed daily report documenting all work performed. The report shall include, at a minimum: Methods and procedures used Types and quantities of chemicals used Flow rates and volumes Wellhead pressures and other relevant operating conditions Observations and significant events Number of hours worked Equipment breakdowns or shutdowns and associated downtime Other pertinent information requested by the City Unspecified Services Unspecified work is defined as materials or services that may be required due to unexpected conditions or events similar to the scope of work. Unspecified work is not guaranteed as part of the contract and must be properly authorized in writing by the City before performed. Account Management Contractor must provide a single point of contact, a dedicated account manager who will be readily available during normal business hours to administer the agreement. Contractor is responsible for notifying the City of any changes in account manager or contact information. Account managers' responsibilities shall include, but are not limited to, overseeing all aspects of implementation, servicing, reporting, and issue resolution. City’s Responsibilities At a minimum, City shall provide and meet the following responsibilities: City shall provide a point of contact (City Project Manager) to administer the Agreement. City Project Manager shall assist with planning, strategy, and objectives prior to performance of the Work. City Project Manager shall promptly respond to issues and inquiries so as not to hinder the progress, completion, or compensation for the Work. The City will identify and provide access to the contractors designated areas prior to commencement of the Work. Introduction SUBMITTALS ARE ACCEPTED VIA OPENGOV ALL QUESTIONS MUST BE SUBMITTED IN OPENGOV WITHIN THE QUESTION AND ANSWER SECTION The City of St. Petersburg’s Procurement & Supply Management Department utilizes OpenGov Procurement to post, submit, and receive submittals for all active solicitations. Vendors must be registered within the OpenGov Procurement system in order to participate in City solicitations. To remain informed of upcoming and active opportunities, vendors are encouraged to subscribe to the City’s procurement page for notifications and updates. For technical assistance, please contact OpenGov. For information or questions about this solicitation, please contact: Tanner Green , Procurement Analyst (727) 551-3552 tanner.green@stpete.org Instructions & General Conditions for Submittals PREPARATION OF SUBMITTAL Submittal will be prepared in accordance with the following: Submittals must be uploaded on forms furnished, utilizing the OpenGov Procurement website. Failure to comply could result in the submission being rejected. If price is a factor, unit prices must be shown and where there is an error in extension of price, the unit price will govern. Alternate submittals will not be considered unless authorized by the solicitation. Proposed delivery time must be shown and any date calculations must include weekends and holidays. Vendor is advised that exceptions to any agreement terms contained or referenced in this solicitation must be stated with specificity in its response to the solicitation. Vendor is deemed to have accepted and to be bound by the solicitation and referenced agreement terms that vendor does not take exception to its response. The City reserves the right to modify or add terms and conditions based upon exceptions stated by the Vendor, or to declare any terms and conditions non-negotiable, as determined by the City in its sole discretion. Vendors will thoroughly review the drawings, specifications, schedule, instructions and/or all other solicitation documents. Vendors will make all investigations necessary to thoroughly inform themselves regarding facilities for delivery of material and equipment as required by the solicitation. Plea of ignorance by the Vendor of conditions that exist or that may hereafter exist as a result of failure or omission on the part of the Vendor to make necessary examinations and investigations, or failure to fulfill in every detail the requirements of the solicitation documents, will not be accepted as a basis for varying the requirements of the City or the compensation to the Vendor. Vendors are advised that all City solicitations are subject to all legal requirements provided for in the Procurement Code and/or State and Federal Statutes. SOLICITATION REVIEW Vendors are required to carefully review this solicitation for defects and questionable or objectionable material. Comments concerning defects and questionable or objectionable material must be made in writing to the Procurement Analyst of record for this solicitation and received by the City at least 10 days before the solicitation submission deadline. This will allow issuance of any necessary addendum. A protest based on omission or error, or on the content of the solicitation, will be disallowed if these faults have not been brought to the attention of the City, in writing, at least 10 days before the time set for submission deadline. SUBMITTAL METHOD AND FORMAT A. Submittals must be uploaded utilizing the OpenGov Procurement website. Submittals sent via email or delivered in-person will not be considered. B. The preferred format for submittals is PDF conversion from your source file. C. Submittals must follow the page maximum stated in the solicitation requirements. Failure to comply could result in the submittal being rejected. SUBMITTALS FROM RELATED PARTIES OR MULTIPLE SUBMITTALS RECEIVED FROM ONE VENDOR Where two (2) or more related parties each upload a submittal, or multiple submittals are received from one (1) vendor, for any solicitation, such submittals will be judged non-responsive. Related parties mean vendors or the principles thereof, which have a direct or indirect ownership interest in another vendor for the same solicitation or in which a parent company or the principles thereof of one (1) contractor have a direct or indirect ownership interest in another vendor for the same solicitation. INTEGRITY OF SOLICITATION DOCUMENTS Vendors will use the original solicitation form(s) provided by the Procurement and Supply Management Department and enter information only in the spaces where a response is requested. Vendors may use an attachment as an addendum to the solicitation form(s) if sufficient space is not available on the original form for the vendor to enter a complete response. Any modifications or alterations to the original solicitation documents by the vendor, whether intentional or otherwise, will constitute grounds for rejection of a solicitation. Any such modifications or alterations a vendor wishes to propose must be clearly stated in the vendor's submittal response and presented in the form of an addendum to the original solicitation documents. LATE SUBMISSION OR MODIFICATION Submittals and modifications received after the time set for the submission will not be considered. WITHDRAWAL OF SUBMITTAL The submittal may be withdrawn prior to the solicitation opening date. WRITTEN REQU Source: OpenGov https://procurement.opengov.com/portal/stpete/projects/308130 Canonical URL: https://govcontractfinder.com/contracts/deep-injection-well-acidization-services-northwest-water-rec-opengov-295-project-308130