Design Build Services for New Glenn Dale Splash Park State and local opportunity open Maryland-National Capital Park and Planning Commission RFP No. P47-113 Posted: 2026-09-29T16:10:58.541Z Response deadline: 2026-12-04T22:00:00.000Z The Maryland-National Capital Park and Planning Commission (M-NCPPC or Commission) is requesting proposals from qualified firms to provide design/build services for the new construction of the Glenn Dale Splash Park, located at 11901 Glenn Dale Blvd., Glenn Dale, Maryland 20769. Design Build Entity's Architect Engineer Basic Service Fees Pre-Design Phase Schematic Design Phase Design & Permitting Phase GMP Submission Construction Document Phase Construction Administration Phase Reimbursable Expenses ( Not to Exceed) Permit Allowance Permit Allowance TOTAL CONSTRUCTION BUDGET IN RFP PERCENTAGE Total Construction Budget Percentage Total Cost Construction in the RFP The percentage proposed in Line Item j. shall be multiplied by the Total Construction Budget identified in the RFP Proposed Percentage (j.) × Total Construction Budget Identified in the RFP Add Alternate Provide the Lump Sum (LS) cost required to achieve LEED Gold Certification rather than LEED Silver Certification. The amount entered shall represent the net cost difference between obtaining LEED Gold and obtaining LEED Silver Net Difference Cost to Achieve LEED Gold Certification in Lieu of LEED Silver Certification Design Build Fee Build Team Pre-Construction Phase Fees Pre-Construction Phase Work up to GMP Acceptance (fees for managing design portion of D/B project) Design Build Fee Team Construction Phase Fees Construction Phase at GMP Acceptance (fees for managing construction portion of the D/B project) General Conditions for Construction Phase - Total of Form F1 (Personnel) General Conditions for Construction Phase- Total of Form F2. ( Non-Personnel) Design/Build Fee General Construction Contigency - Based on 65% CD D/B Fee Construction Allowances Furniture, Fixture, & Equipment (FFE) Audio Visual (AV) and Security Systems Public Art Design/Build Fee Build Team Construction Phase Fees Percentage Total D/B Entity Fees Percentage Proposal Submittal Instructions Deadline Disclaimer It is the responsibility of the bidder to submit electronic bids before the deadline date and time approaches as posted on ProcureNow. Some people are experiencing problems with the Internet, so make sure that all documents are uploaded as soon as possible well in advance of the deadline. The ProcureNow system will close promptly at the deadline date and time…no exceptions are allowed. Project Title Summary Background Contact Information Timeline It is the responsibility of the bidder to submit electronic bids before the deadline date and time approaches as posted on ProcureNow. Some people are experiencing problems with the Internet, so make sure that all documents are uploaded as soon as possible well in advance of the deadline. The ProcureNow system will close promptly at the deadline date and time…no exceptions are allowed. Vendor Questionnaire FORM F- DESIGN BUILD PRICING SHEET Document Uploads Source: OpenGov https://procurement.opengov.com/portal/mncppc/projects/309769 Canonical URL: https://govcontractfinder.com/contracts/design-build-services-for-new-glenn-dale-splash-park-opengov-301-project-309769