Development of the Tampa International Airport Central Warehouse and Logistics Center State and local opportunity open Tampa International Airport Posted: 2026-10-07T22:00:01.306Z Response deadline: 2026-12-15T19:00:41.982Z The Authority is seeking Responses from qualified Respondents to design, construct, and manage the development of the Central Warehouse and Logistics Center. Introduction The Hillsborough County Aviation Authority (Authority), an independent special district, issues this Invitation to Negotiate (Solicitation) for Development of the Tampa International Airport Central Warehouse and Logistics Center at Tampa International Airport (Airport). The Authority welcomes responses to this Solicitation (Responses) from all national, regional and Florida firms. The firms who submit a Response to this Solicitation (singularly Respondent, collectively Respondents) must meet the minimum qualification requirements as specified in the Respondent Questionnaire, Minimum Qualifications on the Authority’s e-Procurement Portal hosted by OpenGov Procurement at https://procurement.opengov.com/portal/tampaairport . Summary Background Contact Information Timeline Solicitation Documents This Solicitation is comprised of multiple documents each with a specific purpose as detailed below. The Solicitation Documents are posted on the Authority website and are available for download at www.TampaAirport.com Business & Careers Business Opportunities Solicitations. Attachments A through C are attached hereto and made a part hereof. Attachment A - Project Manual A comprehensive compilation of preliminary specifications to assist Respondents in reviewing and guiding them to what the Authority is looking for with this development. Attachment B - Ground Lease Agreement The lease agreement between the Awarded Respondent and the Authority for the development of the proposed Central Warehouse and Logistics Center building. Attachment C - Scoring Ranges Provides the scores associated with each technical evaluation criterion that will be used to score Responses. Scope of Work The proposed Central Warehouse and Logistics Center will include dedicated space for the Authority Procurement Department’s warehouse operations, as well as flexibility for future expansion or integration of additional Authority functions. The Scope of Work includes, but is not limited to, comprehensive design, site preparation, permitting, construction, utility connections, paving, stormwater management, landscaping, leasing, management, and coordination with existing infrastructure and adjacent properties. Additionally, within five years after Authority purchases the Central Warehouse and Logistics Center, the Authority reserves the right to negotiate with the Awarded Respondent to develop an additional warehouse building. A more detailed description of the Scope of Work, a conceptual site plan, renderings, technical requirements, and performance specifications are provided in Attachment A, Project Manual. Ground Lease Agreement and Development Overview The approximate 11.41-acre site is north of W. Osborne Ave., east of N. Westshore Blvd., west of Air Cargo Rd., and south of the CAE campus. The site will be delivered in its current condition. A survey is included with the Project Manual (Attachment A) as Exhibit G, Site Survey. Based on preliminary review by the Authority, the site could potentially accommodate approximately 150,000 +/- square feet of warehouse space, of which the Authority would occupy approximately 60,000 +/- square feet of such warehouse space. The Awarded Respondent will provide all outdoor storage, parking, vehicular use areas, utilities, and any other required site improvements. The Term of the Ground Lease Agreement (Attachment B) will be fifty (50) years. The Authority will enter into an Authority Lease Agreement (Exhibit B to the Ground Lease Agreement) with the Awarded Respondent for approximately 60,000 +/- square feet of space in the proposed Central Warehouse and Logistics Center building. The exact square footage will be determined upon completion of the design for the Authority’s tenant improvements. The Awarded Respondent will be responsible for the design and construction of the proposed Central Warehouse and Logistics Center building. As part of the Project Manual (Attachment A), the Authority has provided an outline of specifications that set out the Authority’s expectations for the proposed Central Warehouse and Logistics Center building. Since the Authority will be purchasing the proposed Central Warehouse and Logistics Center building, the Authority will have input throughout the design process of the proposed Central Warehouse and Logistics Center building. The Awarded Respondent will construct the Authority’s tenant improvements as part of the construction of the proposed Central Warehouse and Logistics Center building. Additionally, the Authority may wish to acquire a second warehouse building in the future. Within five years after the Authority’s purchase of the proposed Central Warehouse and Logistics Center building, the Authority reserves the right to negotiate with the Awarded Respondent to develop a second warehouse building for the Authority. Authority has provided the Awarded Respondent with roadway drawings for improvements to W. Osborne Avenue (included as Exhibit M to the Project Manual). It is the responsibility of the Awarded Respondent to have a licensed engineer verify, sign, and seal drawings for use in the Awarded Respondent’s permitting. Awarded Respondent must provide Authority with a projected cost for improving W. Osborne Avenue as part of the cost summary as provided in Section 13.3(A) of this Solicitation. Authority will either provide Awarded Respondent with credit at closing or will pay Awarded Respondent directly for the cost of the W. Osborne Avenue agreed-upon roadway work. Awarded Respondent must install storage racks supplied by the Authority within the Authority space as part of the development of the proposed Central Warehouse and Logistics Center building. Awarded Respondent must deliver the proposed Central Warehouse and Logistics Center building to the Authority with a certificate of substantial completion or a certificate of occupancy by December 2028. Definitions Airport Tampa International Airport. Airside Terminals The five buildings designated as A, C, D, E and F supporting passenger airline operations which are connected to the Main Terminal and through which passenger aircraft are loaded or unloaded. Attic Stock Extra, uninstalled building materials or replacement parts left over from a construction or renovation project and saved for future repairs. Authority Business Days 8:00 a.m. to 5:00 p.m., Eastern Time Zone, Monday through Friday, with the exception of Authority holidays. Awarded Respondent The Respondent that is awarded the Ground Lease Agreement. Board The Hillsborough County Aviation Authority Board of Directors. Central Warehouse and Logistics Center The centralized facility designed to support the Authority and its tenants' storage, handling, distribution, and logistics needs including, but not limited to, materials management, supply chain operations, and related support services. CEO The Hillsborough County Aviation Authority Chief Executive Officer. Key Personnel The essential employees, managers, or project leaders whose specialized skills, leadership, and daily decisions are critical to the success and smooth operation of a specific project. Main Terminal The nine-level central passenger terminal building at the Airport that contains: Level 1-baggage claim; Level 2-airline ticket counters; Level 3-transfer to Airside Terminals; Levels 4 through 9 - six (6) short-term parking levels; and Levels 1 through 8 – eight (8) long-term parking levels. Project Manager The individual designated by Respondent who will be responsible for coordinating and overseeing the Ground Lease Agreement including, but not limited to, monitoring and interpreting the Services with regard to the quality and manner of performance, and Authority and customer satisfaction with performance levels. Services The services detailed in the Scope of Work. Solicitation Documents All documents related to this Solicitation including, but not limited to, addenda, attachments, and exhibits. Tampa Bay Market The commercial and residential economic landscape covering the Tampa-St. Petersburg-Clearwater metropolitan area. Timeline List of dates, times and locations of various meetings and postings at Section 1, Introduction, above. Pre-Solicitation Meeting Mandatory Pre-Solicitation Conference A Mandatory Pre-Solicitation Conference will be held on the date, time, and location listed in the Timeline. Questions relating to the Solicitation process will be answered at that time. At least one representative for each potential Respondent must attend the Mandatory Pre-Solicitation Conference. Responses submitted by Respondents that did not have a representative in attendance at the Mandatory Pre-Solicitation Conference will be rejected. 1. In-Person Attendance The Mandatory Pre-Solicitation Conference may be attended in person at the location specified in the Timeline. To be considered as attending in person, prospective Respondents must have signed in on a sign-in sheet prior to the start of the Mandatory Pre-Solicitation Conference. Attendees are warned that sign-in sheets will be collected at the start of the Mandatory Pre-Solicitation Conference. Any attendees arriving after the sign-in sheets are collected will not be considered to have attended the Mandatory Pre-Solicitation Conference. 2. Microsoft Teams® Attendance The Mandatory Pre-Solicitation Conference may be attended via online meeting utilizing Microsoft Teams®. To be considered as attending via Microsoft Teams®, the attendee must enter their company name in the chat and be identified by the Procurement Agent at the start of the Mandatory Pre-Solicitation Conference. Online attendees are warned that if the Procurement Agent does not identify the company name before the start of the meeting, they will not be considered to have attended the Mandatory Pre-Solicitation Conference. Online attendance information is provided in the Timeline. Note: If a potential Respondent loses online connection during the Mandatory Pre-Solicitation Conference, that potential Respondent must immediately log back in to the online meeting site. If the potential Respondent is unable to log back in, they should contact the Procurement Agent. Mandatory Site Tour The Authority will conduct a Mandatory Site Tour following the Mandatory Pre-Solicitation Conference. Only two representatives per company will be allowed to attend the Mandatory Site Tour. To be considered as attending the Mandatory Site Tour, a potential Respondent must have signed in on a sign-in sheet prior to the start of the Mandatory Site Tour. The Mandatory Site Tour must be attended in person at the location specified in the Timeline. Attendees arriving after the sign-in sheets are collected will not be considered to have attended the Mandatory Site Tour. Meeting Rooms Any person requiring a special accommodation to attend a public meeting because of a disability or physical impairment should contact the Procurement Agent at least 48 hours prior to the scheduled public meeting. Authority Boardroom - SkyCenter Authority Boardroom - SkyCenter is located on the fourth floor of the SkyCenter Office Building. Access to the Boardroom is through the SkyCenter Atrium by going to the fourth floor of the Atrium and then going to the north side of the Atrium where the Atrium meets the SkyCenter Office Building. The Boardroom is located to the left of the Authority receptionist counter. Parking: Parking for the public to access SkyCenter is in the Economy Parking Garage. Respondent will follow signs to Economy Parking Garage. Once parked in the Economy Parking Garage, Respondent will access SkyConnect by taking the elevators located on Level 1 of the Economy Parking Garage. Respondent will then take SkyConnect to the Rental Car Center and exit SkyConnect. Turn right and follow the signs to SkyCenter. Central Warehouse Conference Room Central Warehouse Conference Room is located at 5008 N. West Shore Blvd., Tampa, FL 33614. Parking : Parking for the public is available in the surface lot directly outside the lobby. RCC Conference Room - Rental Car Center RCC Conference Room is located on the third floor of the Rental Car Center. Upon exiting SkyConnect, walk towards the Remote Baggage drop-off area. The door to the RCC Conference Room is immediately across the main hall on the left of the Remote Baggage drop-off area. Parking : Parking for the public to access RCC is in the Economy Parking Garage. Respondent will follow signs to the Economy Parking Garage. Once parked in the Economy Parking Garage, Respondent will access SkyConnect by taking the elevators located on Level 1 of the Economy Parking Garage. Then take SkyConnect to the Rental Car Center and exit SkyConnect. Response Evaluation Objective Per the negotiation process provided below, it is the intention of the Authority to evaluate the qualifications of the Respondents, taking into consideration the evaluation criteria set forth in this Solicitation, negotiate exclusively with the top scored Respondent or concurrently with the highest-scored Respondents, and award of the Ground Lease Agreement to the Respondent whose terms are most favorable to the Authority and whose Response is determined to serve in the best interest of the Authority. The Authority reserves the right to request additional information and clarification of any information submitted, including any omission from the original Response. All Responses will be treated equally with regard to this item. All Responses that meet the minimum qualifications will be evaluated as defined in Section 13, Evaluation Criteria below. Evaluation Criteria The evaluation criteria have been established to determine which Response best meets the requirements and overall goals of the Authority and provides the best value to the Authority. The evaluation criteria are defined in Section 13, Evaluation Criteria. The evaluation will determine which Respondent or Respondents will be included in the negotiation phase. Technical Evaluation A technical evaluation committee, consisting of Authority staff and, as applicable, industry representatives, will evaluate all qualified Responses. Each evaluation criterion will be evaluated based on the factors set forth in Section 13, Evaluation Criteria, and scored from 0 (non-responsive) to the maximum points for that criterion, as listed in Section 13. The criteria and associated maximum points are listed under Section 13, Evaluation Criteria. Shortlisting Process A shortlisting process will be used if four or more Responses are received. The Vice President of Procurement will determine a shortlist of no less than three Respondents based on the following calculation. NOTE: This calculation process is solely to determine the shortlisted Respondents and will not change scores given to each Respondent in each evaluation criterion by the technical evaluation committee. The score associated with the lower end of the Good to Adequate range for the Interviews evaluation criterion will be added to the score of the Response, which is, at that time, ranked third. For this Solicitation, the value of the lower end of the Good to Adequate range is 5. (See Attachment C, Scoring Ranges); and The maximum score associated with the Best range for the Interviews evaluation criterion will be added to all Responses that are, at that time, ranked fourth and below. For this Solicitation, the maximum score for the Best range is 10. (See Attachment C, Scoring Ranges); and Responses that were ranked fourth and below prior to the above calculations, whose score now equal or exceed the scores of the third-ranked Response, will be included in the shortlist. Where the shortlisting process is utilized, only shortlisted Respondents will be scheduled for an interview with the technical evaluation committee. A shortlisted respondent may elect, in writing, not to participate in the interview and will receive a score of zero for the Interviews evaluation criterion. The final ranking of the shortlisted Respondents will be used to determine the Respondent(s) selected for negotiations. Interviews The Authority will schedule interviews with the short-listed Respondents or, if the short-list process is not utilized, all qualified Respondents, as part of its technical evaluation process. Information provided by Respondents, including content and style, will be part of the evaluation process. The individual identified in the Response as the person who is authorized to make representations for the Respondent, and the proposed Project Manager must attend the interview. All Respondent’s representatives are expected to participate in the interview. Participation from Respondent’s representatives will be included in the evaluation scoring. A copy of any written information covered during the interview, whether hard copy or electronic format, must be furnished to the Authority at the time of the interview. Interviews are not open to the public. A Respondent may elect, in writing, not to participate in the interviews and will receive a score of zero for the Interviews evaluation criterion. Following interviews, the technical evaluation committee will conduct a public meeting to evaluate the qualifications of each Respondent, based on all information supplied in the Responses and the results of the interview. The technical evaluation committee will score the Respondents in order from the most qualified to least qualified to provide the requested Services and will determine the recommended short list of Respondent(s) with which the Authority may negotiate upon approval by the Vice President of Procurement. Negotiation Process The Authority intends to negotiate with the highest-scoring Respondent(s), as the case may be, either in exclusive or concurrent negotiations. All written communications during the Solicitation process and negotiation phase will only be conducted between the Procurement Agent and the Respondent(s). Following the Vice President of Procurement’s approval of the intent to negotiate with shortlisted Respondents, the Authority will distribute the Ground Lease Agreement in Microsoft® Word form to shortlisted Respondents and request their redlined changes. The Authority may also request additional information at this time. Following that, the Authority negotiation team will begin exclusive or concurrent negotiations, as the case may be, with the Respondent(s). The Authority's negotiation team, which may include one or more members of the technical evaluation committee, additional Authority staff, external technical experts, consultants or outside counsel, Authority Procurement staff, and Authority Legal Affairs staff, as needed, will conduct the negotiations in person, via telephone, or via Microsoft Teams. If a Respondent intends to be accompanied at any of the negotiation meetings by legal counsel, the Respondent shall give the Procurement Agent at least three (3) business days’ notice of such. The negotiations will be conducted to review the terms and conditions of the Ground Lease Agreement, clarify necessary details and responsibilities, emphasize important issues, resolve minor differences and typographical errors, and obtain the best value for the Authority. Negotiations will not constitute an award, nor will they confer any rights on the Respondent(s). Further, the Authority reserves the right to terminate the negotiation process with any Respondent at any time or to terminate all negotiations at any time up to the Notice of Intent to Select and Award, without prior notice and without liability of any kind or amount. Negotiations will occur prior to selection and award by the Authority Board. Any Respondent exception, stipulation, counteroffer, r Source: OpenGov https://procurement.opengov.com/portal/tampaairport/projects/177905 Canonical URL: https://govcontractfinder.com/contracts/development-of-the-tampa-international-airport-central-wareh-opengov-813-project-177905