Digester 4 and Digested Sludge Storage Tank Rehabilitation State and local opportunity open The City of Tolleson RFQ for CMAR-26-011 Posted: 2026-11-24T22:36:25.649Z Response deadline: 2027-01-14T22:00:00.000Z The City of Tolleson requests Statements of Qualifications from qualified Construction Manager at Risk (CMAR) firms to provide Rehabilitation of Digester 4 and Digested Sludge Storage Tank. PROJECT SCOPE Scope of Work The City of Tolleson intends to procure a Construction Manager at Risk to construct the improvements described in Section 3. This project will be constructed pursuant to A.R.S. 34-601 et seq. The total program budget for the project is approximately $12,000,000.00 , including internal and external costs. The project has a federal funding component through EPA’s Community Grant Program, that is applicable to the Waste Gas Burner. The CMAR services will be single-phase qualifications selection for a two-phase CMAR delivery contract. The first contract, will include the pre-construction services and the preparation and submission of the Guaranteed Maximum Price (GMP). The selected CMAR will be required to execute a Pre-Construction Services Contract substantially in the form of Attachment A and, if a GMP acceptable to the City of Tolleson is submitted, a Construction Services Contract substantially in the form of Attachment B, together with the General Conditions for CMAR in Attachment C. The selected CMAR will execute a contract with the City of Tolleson to provide pre-construction services of the project as follows: CMAR will provide value analysis services, value engineering, and offer cost savings suggestions and best value recommendations. CMAR will provide constructability review. CMAR will submit a Construction Guaranteed Maximum Price (GMP) to the City of Tolleson. The CMAR will act as the City of Tolleson’s fiduciary and have a relationship of trust and confidence between itself and the City of Tolleson. For that reason, the Project will be an “open book” job whereby the city of Tolleson may attend any and all meetings of the CMAR firm relating to the Project and have access to any and all books and records of the CMAR relating to the Project. After CMAR has submitted a Construction Guaranteed Maximum Price acceptable to the City of Tolleson, CMAR and the City of Tolleson may execute a second contract for complete construction services for the construction of the project. The CMAR will assume the risk of delivering the Project through a guaranteed maximum price contract. The CMAR will be responsible for construction means and methods. The CMAR shall self-perform at least 45% of the total contract price for construction. NOTICE NOTICE AND REQUEST FOR QUALIFICATIONS FOR Digester 4 and Digested Sludge Storage Tank Rehabilitation FOR THE CITY OF TOLLESON The City of Tolleson requests Statements of Qualifications from qualified Construction Manager at Risk (CMAR) firms to provide Rehabilitation of Digester 4 and Digested Sludge Storage Tank. You may download this Request for Qualifications (RFQ) and related form contract from the OpenGov Procurement Portal. Go to https://procurement.opengov.com/portal/tollesonaz/projects/288297 , then click Digester 4 and Digested Sludge Storage Tank Rehabilitation link to access the RFQ documents. The Statement of Qualifications (SOQ) must be received electronically via the OpenGov Procurement Portal prior to the submission deadline. All submittals must be fully uploaded no later than 3:00 pm (local time, Phoenix, AZ), Thursday, January 14, 2027 . LATE STATEMENTS OF QUALIFICATIONS WILL NOT BE ACCEPTED . DIRECT CONTACT WITH SELECTION COMMITTEE MEMBERS OR ANY CITY EMPLOYEE CONCERNING THIS RFQ AT ANY TIME IS STRICTLY PROHIBITED . Notice Given By: Crystal Zamora City Clerk Tuesday, November 24, 2026 Published in the: Arizona Business Gazette November 26, 2026 December 3, 2026 INSTRUCTIONS Interested firms shall submit all required items outlined in the SUBMITTAL REQUIREMENTS section of this Request for Qualifications through the City's e-Procurement, OpenGov portal no later than 3:00 pm (local time, Phoenix, AZ), Thursday, January 14, 2027 . All inquiries shall be submitted through the OpenGov portal. GENERAL DESCRIPTION OF PROJECT The City of Tolleson’s Wastewater Treatment Plant located at 9501 W. Pima Road, Tolleson, AZ 85353, is currently rated at 17.5 million gallons per day (mgd) and treats wastewater from residential, industrial and commercial development. This project will undertake rehabilitation of Digester 4 and the Digested Sludge Storage Tank (DSST) to increase solids stabilization capacity and improve redundancy, per the plans provided in Exhibit F. The project must be completed by June 30, 2028 . One contract may be awarded. One firm may be awarded the contract. There will be a single final list of at least three (3) but not more than five (5) firms. The work to be performed includes the furnishing of all labor, materials, and equipment for the supply, delivery, fabrication, installation, testing, and other materials and services required for the project. Specific features include, but are not limited to: 1. Digester 4 Demolish existing Digester 4 gas compressor assembly, heat exchange and associated piping and appearances. Clean and coat Digester 4 interior. Provide new concrete cover at Digester 4 Provide new pumped mixing system at Digester 4. Provide new sludge circulation pump, heat exchanger, and hot water pumps at Digester 4. Provide digester gas sediment trap, PVRV assembly, and other gas handling equipment at Digester 4. Provide new digester gas piping for Digester 4 including pipe bridge across access road. 2. DSST Demolish existing DSST circulation pump. Clean and coat the DSST interior walls. Provide new concrete cover at the DSST. Provide new pumped mixing system at the DSST. Provide new PVRV assembly, sediment trap, and emergency relief hatch at the DSST. Provide new digester gas piping for the DSST and connect to the existing digester gas piping system. 3. Waste Gas Burner (Federally Funded) Demolish existing candlestick Waste Gas Burner and associated equipment. Provide new enclosed waste gas burner and associated equipment including control panel, flame trap, backpressure regulating valve, and drip traps. 4. Electrical Replace existing MCC-6. Modify existing MCC-6A. By selecting the CMAR delivery method for this project, the Owner expects the CMAR to collaborate closely with the Owner and Engineer during the pre-construction phase to develop a mutually agreeable guaranteed maximum price (GMP) for delivery of the project. The Owner also expects the CMAR to perform construction phase services for the improvements. Other project-specific objectives include: Quality Assurance: Deliver a high-quality project consistent with construction drawings and specifications and built to high standards. Cost Certainty: Minimize capital and lifecycle costs. Establish a guaranteed maximum price to control budget and limit financial exposure. Provide regular cost estimate updates with the project team to track cost and compare the cost to the available budget. Schedule Optimization: Achieve the schedule completion dates of the Project. Risk Management: Achieve an optimal balance of risk allocation between Owner and CMAR while maintaining collaboration. Safety Performance: Implement an effective safety program incorporating industry best practices to protect workers, City staff and the community. Early Contractor Involvement: Gain constructability input during design to reduce risks and improve efficiency. Value Engineering: Drive innovation and identify efficient solutions to reduce lifecycle costs. Dispute Avoidance: Reduce disputes through shared goals and open communication. Federal Compliance: Complete the Project according to the federal and state funding requirements such as Davis-Bacon, Disadvantaged Business Enterprise, American Iron and Steel, and the Build America Buy America Act. (Situation Specific Contract Provisions and Sample Language included in Attachments.) Ensure compliance with all applicable EPA - Community Grant funding requirements and 2 CFR Part 200 Uniform Guidance. (Situation Specific Contract Provisions and Sample Language included in Attachments.) SELECTION PROCESS The City reserves the option to conduct interviews with the highest scoring respondents based upon the initial Statement of Qualifications evaluation. In the event the City chooses to conduct interviews, the interview evaluation criteria will be provided to the respondents selected for interview. Selection Committee: A Selection Committee will review the Statements of Qualifications. Each firm will then be ranked accordingly. No interviews are planned. Contract Negotiation: Upon completion of the final rankings, the City of Tolleson will enter into negotiations with the highest ranked firm for a pre-construction phase services contract for the Project. If a contract cannot be successfully negotiated with the highest ranked firm, then negotiations will be terminated with that firm and the City of Tolleson will enter into negotiations with the next highest ranked firm until an agreement is reached or an impasse is declared. Key Personnel: The Firm shall ensure that Key Personnel identified in its SOQ shall be the Key Personnel assigned to the project. Such Key Personnel shall not be replaced without prior written acceptance of the City of Tolleson. Unauthorized replacements will result in disqualification of the SOQ or breach of the Pre-Construction Services Contract (Attachment A). EVALUATION CRITERIA Each SOQ will be evaluated according to the following criteria: GENERAL INFORMATION City Rights The City of Tolleson reserves the right to reject any or all SOQs, to waive any informality or irregularity in any SOQs received, and to be the sole judge of the merits of the respective SOQs received. No binding contract will exist between the submitter and the City until the City and successful respondent execute a written contract, after approval by the City Council. This RFQ does not commit the City of Tolleson to award a contract, to defray any costs incurred in the preparation of a response to this request, or to procure or contract for services. The City of Tolleson reserves the right to extend the date by which the submittals are due. The City of Tolleson reserves the right to cancel, in part or in its entirety, this RFQ including but not limited to: selection schedule, submittal date, and submittal requirements. If the City of Tolleson cancels or revises the RFQ all potential respondents of record will be notified through the OpenGov application. All submittals become the property of the City of Tolleson. Except for the name of firms on the final list (if there is a final short list), no information contained in a Statement of Qualifications shall be made public until after award and execution of a contract with a CMAR firm. The City of Tolleson reserves the right to request additional information and/or clarifications from any or all respondents to this RFQ. Instructions Respondents may not rely on any oral instructions. Any changes to this will be in the form of an addendum. Inquiries Any question related to the Request for Qualifications shall be directed to the OpenGov Procurement Portal . The submitter shall not contact or ask questions of the department for which the requirement is being procured. Any and all questions shall be submitted in writing. Verbal or telephone inquiries directed to City staff will not be answered . Within two business days following the Final Date for Inquiries listed on the cover page of this RFQ, answers to all questions received will be available on OpenGov. No questions, submitted in any form, will be answered after the Final Date for Inquiries. Contact with City Employees All firms interested in this project (including the firm’s employees, representatives, agents, lobbyists, attorneys, and sub-consultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, assure that contract decisions are made in public and to protect the integrity of the selection process. Equal Opportunity The City is an equal opportunity employer. Minority and women’s business enterprises are encouraged to submit Statements of Qualifications on the Project. Protests; Informal and Formal Any respondent may protest this RFQ issued by the City, the ranking of the respondents and proposed award of a Contract, or the actual award of a Contract. All protests will be considered in accordance with the City of Tolleson's protest policy and procedures set forth in City Procurement Code § 3-5-300, which is publicly available from the City Clerk's Office, 9055 West Van Buren Street, Tolleson, Arizona 85353. No Constitution of Obligation This RFQ does not obligate the City of Tolleson to any cost incurred in the preparation of and the submission of the SOQ nor to enter into an agreement with any of the submitting firms. All submittals become property of the City of Tolleson, will not be returned and are subject to Public Records requests pursuant to Arizona law. Right to Review and Evaluate Performance Within forty-five (45) days after every project completion or as the City deems necessary, the City reserves the right to evaluate the Firm's performance, and provide a copy of the evaluation report to the Firm. The Firm shall then have ten (10) days to respond in writing to the evaluation. The evaluation factor under “Past Performance” in future selections for Firm on City work that the Firm may wish to participate. Confidential Information If a firm/individual believes that a SOQ contains information that should be withheld from the public record, a statement advising the City Representative of this fact shall accompany the submission and the information shall be identified. The information identified by the firm/individual as confidential shall not be disclosed until the City Representative makes a written determination. The City Representative shall review the statement and information and shall determine in writing whether the information shall be withheld. If the City Representative determines to disclose the information, the City Representative shall inform the firm/individual in writing of such determination. American Iron and Steel Consolidated Appropriations Act, 2014 (Act), includes an “American Iron and Steel” (AIS) requirement that requires the use of iron and steel products that are produced in the U.S. for projects for the construction, alteration, maintenance, or repair of a public water system or treatment works. Waivers may be granted if a grantee can demonstrate a justifiable reason and a waiver request is approved by EPA. Additional details and a description of AIS requirements are available on EPA’s website at: https://www.epa.gov/system/files/documents/2022-10/AIS%20Overview.pdf Brooks Architect-Engineers Act The Brooks-Architect Engineers Act requires grantees to use qualifications-based selection for contracting with architectural and engineering forms. Instead of selecting the lowest bidder, this process evaluates firms on their demonstrated competence, qualifications, and experience for the specific services needed, followed by a negotiation for a fair and reasonable price. The Brooks Architect-Engineers Act applies to certain Community Grants projects, namely those that contain Clean Water Act State Revolving Fund activities under the Clean Water Act. The Brooks Architect-Engineers Act does not apply to those projects that contain Drinking Water State Revolving Fund activities. Build America, Buy America (BABA) BABA is a provision in the 2021 Infrastructure Investment and Jobs Act that requires the use of American-made iron, steel, manufactured products, and construction materials for all Federally funded infrastructure projects in the U.S. BABA includes a process for agencies to grant waivers if there is a lack of availability of necessary materials or if applying BABA would significantly increase project costs (e.g. by more than 25%). Grantees and subrecipients must maintain detailed records to demonstrate that they have complied with BABA. For more information about BABA waivers see Build America, Buy America (BABA) Approved Waivers | US EPA. Davis Bacon and Related Acts When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. §§ 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 C.F.R. Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The grantee must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The grantee must report all suspected or reported violations to the EPA. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. § 3145), as supplemented by Department of Labor regulations (29 C.F.R. Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The grantee must report all suspected or reported violations to the Federal awarding agency. Link(s) to these contract provisions for Davis-Bacon and Related Acts (DBRA) must be included in all contracts to which Davis-Bacon and Related Acts apply, unless a link with identical information, or an attachment with identical information, or the language in these contract provisions is provided verbatim in the contracts, as required by 29 C.F.R. § 5.5. SUBMITTAL REQUIREMENTS Source: OpenGov https://procurement.opengov.com/portal/tollesonaz/projects/288297 Canonical URL: https://govcontractfinder.com/contracts/digester-4-and-digested-sludge-storage-tank-rehabilitation-opengov-178285353-project-288297