DISTRIBUTION TRANSFORMERS State and local opportunity open Alameda Municipal Power MS 11-26-02 Posted: 2026-11-14T01:21:22.309Z Response deadline: 2027-01-05T20:00:00.000Z Alameda Municipal Power (AMP) requests firm quotations from qualified distribution-transformer manufacturers or authorized suppliers for a one-time purchase of sixty-five (65) new distribution transformers. The scope includes design verification, manufacture, factory testing, quality assurance, documentation, packaging, freight, and delivery of the quantities listed in Section 2.1 under Scope of Work (SOW). This procurement is not a requirements contract, blanket purchase agreement, multi-year contract, or commitment to future purchases. AMP may award by individual line item, groups of line items, or one aggregate order to multiple bidders. Partial awards, alternatives, and substitutions are permitted only where expressly allowed in the solicitation. No additional quantities are authorized by this SOW. Price Quote Table The proposed pricing shall not change at the time of shipment. The Supplier(s) must price accordingly. XFMR POLE MT 37.5 KVA 1PH 120/240 VOLT XFMR POLE MT 50 KVA 1PH 120/240 VOLT XFMR POLE MT 100 KVA 1PH 120/240 VOLT XFMR PAD MT (LT) 50 KVA 1PH 240/120 VOLT XFMR PAD MT (LT) 75 KVA 1PH 240/120 VOLT XFMR PAD MT (LT) 100 KVA 1PH 240/120 VOLT XFMR PAD MT (L) 75 KVA 3PH 208Y/120 VOLT XFMR PAD MT (L) 150 KVA 3PH 480Y/277 VOLT XFMR PAD MT (L) 500 KVA 3PH 208Y/120 VOLT XFMR PAD MT (LX) 50 KVA 1PH W/3SW 240/120 VOLT XFMR PAD MT (SUB) 500 KVA 208Y/120 VOLT XFMR PAD MT 12,000-4160Y/2400, 500KVA 3PH SCOPE OF WORK Scope Of Work DISTRIBUTION TRANSFORMER – SCOPE OF WORK Distribution Transformers — One-Time Purchase Scope of Work (SOW) and Manufacturer Qualification Requirements 1. Purpose and Procurement Intent Alameda Municipal Power (AMP) requests firm quotations from qualified distribution-transformer manufacturers or authorized suppliers for a one-time purchase of sixty-five (65) new distribution transformers. The scope includes design verification, manufacture, factory testing, quality assurance, documentation, packaging, freight, and delivery of the quantities listed in Section 2.1. This procurement is not a requirements contract, blanket purchase agreement, multi-year contract, or commitment to future purchases. The solicitation shall state whether AMP may award by individual line item, groups of line items, or one aggregate order to multiple bidders. Partial awards, alternatives, and substitutions are permitted only where expressly allowed in the solicitation. No additional quantities are authorized by this SOW. 2. Scope of Supply The Supplier shall furnish complete, new, unused distribution transformers in the specified configurations, including single-phase pole-mounted, single-phase pad-mounted, three-phase pad-mounted, and the special 12 kV-to-4 kV class transformers identified below. Supply includes all labor, engineering, materials, accessories, factory quality control and testing, documentation, shipping, and delivery to final destination (FOB Alameda CA). Each bid line item shall identify the actual manufacturer and manufacturing facility. The bidder must have the ability, capacity, and experience to delivery their order between 12 and 24 months 2.1 Firm Bid Quantity Schedule AMP item no. Description from AMP quantity schedule Quantity 09002 XFMR POLE MT 37.5 KVA 1PH 120/240 VOLT 5 09003 XFMR POLE MT 50 KVA 1PH 120/240 VOLT 20 09005 XFMR POLE MT 100 KVA 1PH 120/240 VOLT 2 09023 XFMR PAD MT (LT) 50 KVA 1PH 240/120 VOLT 10 09024 XFMR PAD MT (LT) 75 KVA 1PH 240/120 VOLT 10 09025 XFMR PAD MT (LT) 100 KVA 1PH 240/120 VOLT 3 09031 XFMR PAD MT (L) 75 KVA 3PH 208Y/120 VOLT 2 09043 XFMR PAD MT (L) 150 KVA 3PH 480Y/277 VOLT 3 09049 XFMR PAD MT (L) 500 KVA 3PH 208Y/120 VOLT 2 09051 XFMR PAD MT (LX) 50 KVA 1PH W/3SW 240/120 VOLT 5 09066 XFMR PAD MT (SUB) 500 KVA 208Y/120 VOLT 1 TBD 1 2/4KV, 500KVA 2 TOTAL — ONE-TIME PURCHASE 65 Descriptions above reflect AMP’s provided schedule and are not complete technical specifications. Voltage designations, high-voltage ratings, connection arrangements, accessories, and type-specific design requirements shall be governed by the final AMP technical specifications. Technical Specifications are provided in the Attachments in the Bid Portal.. 3. Governing Requirements and Order of Precedence All equipment shall meet the applicable editions of IEEE/ANSI standards, U.S. Department of Energy efficiency requirements, environmental and safety requirements, and AMP technical specifications expressly identified in the issued solicitation. AMP shall identify controlling editions and any permitted exceptions before release; the phrase “latest applicable” alone shall not replace an identified contractual standard. Unless the executed contract states otherwise, the order of precedence shall be: (1) Public Utilities Board authorization; (2) purchase order; (3) AMP technical specifications and AMP-approved drawings; (4) this SOW; RFQ Terms and Conditions, and (5) Supplier’s accepted proposal. A proposed deviation becomes binding only when explicitly accepted in writing by AMP. 4. Mandatory Manufacturer Qualifications — Pass/Fail Each Bidder shall provide sufficient verifiable evidence for each published mandatory requirement. AMP will determine responsiveness and responsibility under its applicable procurement procedures. Mandatory requirements shall be applied consistently to all bidders and shall not be replaced by unpublished evaluation preferences. 4.1 Manufacturer identification and traceability Identify the legal manufacturer, ownership, actual factory name and address, and proposed production plant for each item. Identify material subcontractors for major manufacturing or test operations and disclose proposed alternate facilities. Changes to an accepted production plant require AMP’s written authorization. 4.2 Relevant manufacturing experience Provide evidence of at least five (5) years of manufacturing electric utility-grade distribution transformers of comparable technology, voltage class, and capacity, including comparable orders, delivery quantities, dates, and utility customer contact information. AMP shall confirm that the five-year threshold is an adopted minimum qualification before release. 4.3 Utility performance references Submit electric utility references demonstrating successful delivery and service performance for comparable transformer designs, including contacts, dates, quantities, field experience where available, and handling of warranty or technical issues. AMP shall define the required number and recency of references in the RFQ. Equivalent verifiable utility experience shall be considered in accordance with the published solicitation; geography alone shall not determine qualification. 4.4 Factory routine testing List routine tests performed on every unit. The Supplier shall perform applicable routine tests required by AMP’s issued technical specifications and provide unit-specific test reports after manufacture, as required in Sections 6 and 10. 4.5 Quality management documentation Attach documented QA/QC procedures. List quality certifications (e.g., ISO) if applicable. No quality certification is required solely by this subsection. 4.6 Technical capability and compliance Demonstrate ability to meet AMP’s applicable electrical, mechanical, efficiency, accessory, dimensional, and service requirements for each offered item. Identify design differences or required exceptions in the proposal compl INSTRUCTIONS TO BIDDERS Alameda Municipal Power (AMP) requests firm quotations from qualified distribution-transformer manufacturers or authorized suppliers for a one-time purchase of sixty-five (65) new distribution transformers. The scope includes design verification, manufacture, factory testing, quality assurance, documentation, packaging, freight, and delivery of the quantities listed in Section 2.1 under Scope of Work (SOW). This procurement is not a requirements contract, blanket purchase agreement, multi-year contract, or commitment to future purchases. AMP may award by individual line item, groups of line items, or one aggregate order to multiple bidders. Partial awards, alternatives, and substitutions are permitted only where expressly allowed in the solicitation. No additional quantities are authorized by this SOW. Request for Quotation (RFQ) Documents Included The documents below are included with this RFQ for your review and/or submittal: Technical Specifications (3 files)* Check Off Lists (4 files)* Material Questionnaires (4 files)** AMP Transformer Qualifications Questionnaire** Local Business Declaration (optional)*** *See Attachments section. **See Required Submittals secton. ***Optional but must be submitted with quote if applicable. Examination of RFQ Documents The specifications included in the attachment "Technical Specifications" have been prepared to describe the standard quality, performance, and other characteristics needed to meet Alameda Municipal Power (AMP) requirements. AMP will accept alternate quotations of a designed material, product, thing, service, “or equal”, and will determine if such alternate proposals are satisfactory in meeting a mandatory requirement or specification and if the proposed alternate meets the intent of the original mandatory requirement. For clarification, the technical specifications reference 1-L-035 , 1-L-036, 1-L-423 , and 1-L-424 whereas the enclosed drawings reference 1-L-035A , 1-L-036A, 1-L-423A , and 1-L-424A respectively. Both references in each case pertain to the same equipment and should be considered equivalent for the purposes of this RFQ. Bidder’s Representation and Certification The submission of a quotation shall be deemed a representation and certification by the Bidder that the Bidder: Has carefully read and fully understand the information that was provided by AMP to serve as the basis for submission of this quotation; Has not retained a person to solicit or secure an AMP Agreement (upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee) except for retention of bona fide employee or bona fide established commercial selling agencies for the purpose of securing business; Has not colluded, conspired, or agreed, directly or indirectly, with any person in regard to the terms and conditions of the Bidder's quotation, except as may be permitted by this RFQ; Has not attempted to exert undue influence with the Utility Procurement Administrator or Project Manager or any other person who has directly participated in the decision to award the Agreement to the Bidder; Has furnished and will furnish true and accurate statements, records, reports, resolutions, certifications, and other written information as may be requested of the Bidder by AMP during the term of this Agreement; Has the capability to successfully undertake and complete the responsibilities and obligations of the quotation being submitted, and there are no claims or disputes between the Bidder and AMP which would materially affect the Bidder's ability to perform under the Agreement; Has the power and authority to enter into this Agreement with AMP, that the individual(s) executing this Agreement are duly authorized to do so by appropriate resolution (if applicable), and that this Agreement shall be executed, delivered and performed pursuant to the power and authority conferred upon the person or persons authorized to bind the Bidder; Does not and in the performance of this Agreement they will not discriminate in employment of any person because of race, skin color, gender, age, religion, disability, national origin, ancestry, sexual orientation, housing status, marital status, familial status, weight or height of such person; and further certify that they are in compliance with all Federal, State and local laws, regulations, rules, directives and executive orders regarding nondiscrimination in employment; Acknowledges that AMP has the right to make any inquiry it deems appropriate to substantiate or supplement information supplied by Bidder, and Bidder hereby grants AMP permission to make these inquiries, and to provide any and all related documentation in a timely manner; and Will contract with AMP, to provide all necessary materials, and furnish the specified requirements in this RFQ, in the manner herein prescribed and at the prices stated in the quotation, if the quotation is accepted. No request for modification of the quotation shall be considered after its submission on grounds that Bidder was not fully informed to any fact or condition. Addenda/Clarifications Should discrepancies or omissions be found in this RFQ or should there be a need to clarify this RFQ, questions or comments regarding this RFQ must be submitted in AMP’s electronic procurement system by OpenGov Procurement (Bid Portal) no later than the date and time specified in the Bid Portal. Responses from AMP will be communicated through AMP’s Bid Portal to all recipients of this RFQ via addendum. Inquiries received after the date and time stated will not be accepted. Any and all addenda issued by AMP shall be deemed included in this RFQ and the provisions and instructions therein contained shall be incorporated into any quotation submitted by Bidder. AMP shall not be responsible for nor be bound by any oral instructions, interpretations or explanations issued by AMP or its representatives. Submission of Quotations Submittal . A quotation shall be submitted in AMP’s Bid Portal. Any quotation which is attempted to be delivered on paper or via email shall be deemed non-responsive and rejected. The Bidder shall have the sole and exclusive responsibility for ensuring that a quotation is submitted by the time stated by the Bid Portal herein. Any quotation that is incomplete, unclear, or that fails to fully comply with the applicable requirements set forth herein, including, but not limited to, information requested by AMP, may be rejected as nonresponsive. In addition to price quotation, additional information under Required Submittals shall be completed and submitted in AMP’s Bid Portal: Quotation Authorization . The electronic login authorization of the person, whether as assigned personal or representative capacity, executes the e-Bid and any other e-document which AMP requires. If the person does business under his or her own name, that person shall login under his or her own login and PIN as authorized by the OpenGov. If the person does business under a fictitious business name, that person shall login under his or her own login and PIN as authorized by OpenGov. If the person logins for and on behalf of a partnership, the person shall do so with his or her authority to sign/login under his or her own login and PIN as authorized by the OpenGov. Responsibility of Bidder . A quotation shall be submitted at the sole cost and expense of the Bidder and, in submitting such quotation to AMP, the Bidder waives any claim or demand against AMP which the Bidder may have for any direct or indirect cost or expense of preparing and submitting such quotation. Price Quotation . Price quotation shall state the net delivered price based on Free on Board (FOB ) Alameda, California with all transportation charges prepaid and include all State and Federal Taxes, including the amount of any tariffs, customs duties, and Use or Excise Tax that may be applicable to the transaction, all of which will be paid by the Bidder. Do not include sales tax in price quotation unless a line item is separately provided for sales tax. If California Use Tax is applicable, Bidder shall state whether they maintain a place of business in the State of California, or are authorized by the State Board of Equalizations of said State under Section 6202 of the Revenue and Taxation Code, to collect Use Taxes. If the Bidder to whom the Agreement is awarded does not maintain a place of business in the State of California, or is not authorized to collect Use Taxes, the amount of such taxes, if applicable, will be deducted from the total bid price and paid directly by AMP to the State of California. No charges of any kind will be allowed unless specifically made part of Bidder’s quotation and are specified in Bidder’s response. The proposed pricing shall not change at the time of shipment even though the market may volatile between the time of bidding and shipping. The Supplier(s) must price accordingly. Alternate Bids. No alternate Bid shall be accepted or considered by AMP, unless AMP solicits an alternate Bid. Additive and Deductive Alternate Bids. All solicited alternate Bids shall be bid, whether additive or deductive. If the Bidder proposes no change in the base Bid, then the Bidder shall state "NO CHANGE" in the space provided. Delivery Requirements . When delivery time is requested in the quotation documents, time shall be of the essence; therefore, the quotation shall include the delivery date or After receipt of order (ARO) lead time in the “Lead Time” tab under “Price Quotation” in AMP’s Bid Portal. In some instances, AMP may specify only a maximum number of days for delivery and will use this delivery date as part the criteria to determine the award. The Agreement to be awarded is for a specific quantity purchased at one time. See Specification for delivery and acceptance testing requirements if any. Exceptions . Exceptions to the specifications (or Scope of Work), RFQ Terms and Conditions, and Agreement issued must be itemized and justified in writing and included with quotation submitted. Bidder shall clearly identify each proposed change and furnish reasons for, as well as specific recommendations, for alternative language. If there are no exceptions noted, it is assumed the Bidder will accept all conditions and requirements. Items not excepted will not be open to later negotiation. The above factors will be taken into account in evaluating quotations. Bidders that take substantial exceptions to the proposed Agreement may be determined by AMP, at its sole discretion, to be unacceptable and no longer considered for award. Required Submittals . In addition to price quotation, the following additional information shall be completed and submitted in Bid Portal subject to disqualification due to failure to provide: Material Questionnaires (4 files) AMP Transformer Qualifications Questionnaire, Exhibits, and any additional supporting documents required for the qualifications questionnaire. IRS Form W-9 - Request for Taxpayer Identification Number and Certification Local Business Declaration (optional)*** Withdrawal of Quotation . A Bidder may withdraw its quotation by reentering the submitted electronic quotation and activating the submittal at any time before the deadline for the receipt of quotations as specified in the Notice of Request for Quotation. No Bidder may withdraw its quotation for a period of ninety (90) days after the deadline for the receipt of quotations as specified in the Notice of Request for Quotation. REVIEW AND SELECTION PROCESS Determination of Lowest Responsive and Responsible Bidder Subject to the conditions of this RFQ, AMP will award the Agreement, if an award is made, to the lowest responsive and responsible Bidder. In determining whether the Bidder is responsible, AMP will use the criteria set forth below per Scope of Work section 4 and 9: Stage 1 — Mandatory requirements review (Pass/Fail) AMP will assess required forms, authorizations, manufacturer qualifications, mandatory technical requirements, the list of routine tests, documented QA/QC procedures, and any other published pass/fail prerequisites. Only bids passing all applicable mandatory requirements will proceed to Stage 2, consistent with AMP procurement rules. Manufacturer identification and traceability Relevant manufacturing experience Utility performance references Factory routine testing Quality management documentation Technical capabil Source: OpenGov https://procurement.opengov.com/portal/alamedaca/projects/324451 Canonical URL: https://govcontractfinder.com/contracts/distribution-transformers-opengov-16194501-project-324451