Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank State and local opportunity open Effingham County 26322B12 Posted: 2026-11-04T20:16:46.729Z Response deadline: 2026-12-10T19:00:00.000Z Effingham County is soliciting the construction of a new 1.5-million-gallon concrete composite elevated water tank as part of the County’s Regional Water Supply Facilities project. The project includes all labor, materials, and equipment necessary to provide a complete and fully operational elevated water storage facility, including the tank foundation, tank erection, site work, piping, painting, electrical systems, instrumentation, SCADA, and related accessories. Major construction components include the elevated tank and foundation, site clearing and grading, gravel access areas, approximately 12-inch PVC water main, flanged piping and control valves, connection to the existing 16-inch water main, fire hydrant assemblies, gate valves, steel casing/jack-and-bore work, chain-link fencing and gates, rip-rap, miscellaneous concrete, erosion and sediment controls, and site restoration. The project also includes a complete electrical, instrumentation, and SCADA system, including electrical service, panels, conduit, wiring, gauges, controls, grounding, lighting, pressure instrumentation, and associated testing and inspections. The electrical plans further identify SCADA equipment, tank lighting, grounding around the tank, service equipment, and provisions for obstruction lighting if required for FAA compliance. Additional work includes tank coating and painting, lettering and logo installation, disinfection and bacteriological testing of the water system, stormwater/NPDES monitoring and reporting, and completion of all regulatory and closeout requirements necessary to place the facility into service. Mobilization Clearing & Grubbing Site Grading Traffic Control 1.5 MG Concrete Composite Elevated Water Tank Gravel Driveway and Areas Inside Fence (See Plans) Flanged Piping and Valves (Includes Non-Freeze Yard Hydrant) Precast Concrete Vault 12" C900 DR 25 PVC Water Main (Includes all Rest. Jt.) 24" Welded Steel Casing (Jack & Bore/Open Trench) Fire Hydrant Assembly 12" Butterfly Valve Connect to Exist. 16" Water Main w/ 16"x12" Tapping Sleeve w/12" GV 7 ft. Site Fencing and Gate Rip-Rap Electrical, Instrumentation and SCADA Misc. Concrete Erosion and Sediment Control Painting, Lettering & Logo for Composite Elevated Water Tank Storm Water Sampling for NPDES Permit Monitoring, NOI, NOT, Record Keeping & Reporting NPDES to GA EPD Alternate Bid No.1 The base bid is for a concrete composite elevated water tank. Bid Alternate No. 1 is for a spheroid elevated water tank and the associated painting, lettering, and logo items. Bidders shall submit prices for both the base bid and the alternate. Subtract Item No. 5 & 19 from the Base Bid and add Item No. 5 & 19 from Alternate Bid No. 1 for new total. 1.5 MG Spheroid Elevated Water Tank Painting, Lettering & Logo for Spheroid Elevated Water Tank Cash Allowances Authorized by Owner & Engineer Cash Allowance (Authorized by Owner & Engineer) Scope of Work SCOPE OF WORK: The purpose of this solicitation is to describe the requirements for: The project includes furnishing all labor, materials, equipment, and services necessary to construct a 1.5-million-gallon concrete composite elevated water storage tank in Effingham County, Georgia. Work includes tank and foundation design and construction, site work, piping, tank erection and painting, electrical systems, supervisory control and data acquisition (SCADA), and related appurtenances, including testing and commissioning, in accordance with the project plans and specifications. GENERAL INFORMATION: Whenever an alteration in the character of the work involves a substantial change in the nature of the design or type of construction, or materially increases or decreases the cost of performance, a Supplemental Agreement acceptable to both parties shall be executed before work begins on the alteration. In the absence of a mutually acceptable Supplemental Agreement, the County may direct in writing that the work be performed by Force Account or at existing Contract prices, in accordance with the change-order and payment provisions of the Contract Documents. The Contractor shall begin work within fourteen (14) calendar days after receipt of the County-issued Notice to Proceed. The contract completion period shall be measured from receipt of the Notice to Proceed, as specified in the Notice to Contractors. The fourteen-day period allowed for commencement of work is included within, and does not extend, the contract completion period. If performance of all or any portion of the Work is suspended or delayed by the County in writing for an unreasonable period of time that was not originally anticipated, customary, or inherent to the construction industry, and the Contractor believes additional compensation and/or contract time is due as a result, the Contractor shall submit a written request for adjustment to the County within seven (7) calendar days after receipt of the notice to resume work. The request shall state the reasons for the adjustment and include supporting documentation. Upon receipt, the County will evaluate the Contractor’s request. If the County determines that the cost and/or time required for performance of the Contract has increased as a result of the suspension or delay, and that the suspension or delay was caused by conditions beyond the control of, and not the fault of, the Contractor, its suppliers, or subcontractors at any approved tier, and was not caused by weather, the County will make an appropriate adjustment, excluding profit, and modify the Contract in writing accordingly. The County will notify the Contractor in writing of its determination. No adjustment will be allowed unless the Contractor submits the request within the time prescribed. No adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by another cause, or where an adjustment is otherwise provided for or excluded under another term or condition of the Contract. MEASUREMENT AND PAYMENT The Department shall retain 5% of the gross value of the completed work as indicated by the current estimate certified by the County for payment. Final Payment: Upon completion by the Contractor of the work, including the receipt of any final written submission of the Contractor and the approval thereof by the County, the County will pay the Contractor a sum equal to 100 percent (100%) of the compensation set forth herein, less the total of all previous partial payments, paid or in the process of payment. Acceptance of final payment shall constitute a waiver of all claims by the Contractor arising out of the Contract, except those previously made in writing and identified by the Contractor as unsettled at the time of the final application for payment. In the event the Contractor fails to execute the Final Supplemental Agreement as prepared by the County because he disputes the amount of the final payment as stated therein, the amount due the Contractor shall be deemed by the Contractor and the County to be an unliquidated sum and no interest shall accrue or be payable on the sum finally determined to be due to the Contractor for any period prior to final determination of such sum, whether such determination be by agreement of the Contractor and the County or by final judgment of the proper court in the event of litigation between the County and the Contractor. The Contractor specifically waives and renounces any and all rights it may have under Section 13-6-13 of the Official Code of Georgia and agrees that in the event suit is brought by the Contractor against the County for any sum claimed by the Contractor under the Contract, for delay damages resulting from a breach of contract, for any breach of contract or for any extra or additional work, no interest shall be awarded on any sum found to be due from the County to the Contractor in the final judgment entered in such suit. All final judgments shall draw interest at the legal rate, as specified by law. Also, the Contractor agrees that notwithstanding any provision or provisions of Chapter 11 of Title 13 of the Official Code of Georgia that the provisions of this contract control as to when and how the Contractor shall be paid for The Work. Further, the Contractor waives and renounces any and all rights it may have under Chapter 11 of Title 13 of the Official Code of Georgia. Safety: The Contractor shall provide all necessary barricades and signage and take necessary precautions to protect buildings, general public and Contractor personnel. The Contractor shall at all times guard against damage or loss of Effingham County property or the general public and shall be held responsible for replacing or repairing any loss or damage to the satisfaction of The Effingham County Board of Commissioners. GENERAL CONSTRUCTION GUIDELINES 1.The contractor shall be required to coordinate his work schedule with the A/E and County during the course of the project. 2. Testing and payment for testing shall be handled as provided in the Contract Documents. Testing laboratory services required under Section 01 45 00 shall be selected and paid for by the Owner. The Contractor shall include in the bid all testing assigned to the Contractor under the technical specifications and shall pay for retesting when work fails to meet the specified requirements. 3. Effingham County does not commit to furnishing full-time inspection or testing of the work in progress or at material sources. Lack of inspection and/or testing by the County or A/E will in no way relieve the Contractor of his responsibility to provide quality workmanship in accordance with the Contract Documents. 4. The Contractor is required to submit shop drawings and material submittals to the A/E for review and approval prior to delivery and installation. Effingham County Regional Water Supply Facilities – 1.5 MG Elevated Water Tank Effingham County Board of Commissioners is soliciting sealed bids from qualified contractors for the construction of a new 1.5-million-gallon (MG) concrete composite elevated water storage tank as part of the Effingham County Regional Water Supply Facilities project. The Contractor shall furnish all labor, materials, equipment, supervision, transportation, testing, and incidental services necessary to construct a complete and fully operational elevated water storage facility in accordance with the approved construction plans, technical specifications, and Contract Documents prepared by Goodwyn Mills Cawood (GMC). The scope of work generally includes, but is not limited to, the following: Elevated Water Tank Construction: Design and construction of the tank foundation, ground improvements where required, fabrication and erection of the 1.5 MG concrete composite elevated water tank, structural components, interior slab, tank piping, appurtenances, access components, antenna corral, coatings, painting, and associated accessories. Site Preparation and Civil Improvements: Site clearing, excavation, grading, earthwork, trenching, backfilling, compaction, drainage improvements, gravel access driveway, gravel areas within the fenced facility, rip-rap, miscellaneous concrete improvements, and restoration of disturbed areas. Water System Piping and Connections: Installation of water mains, including 12-inch PVC piping, flanged piping, valves, fittings, valve vaults, hydrants, connections to the existing water distribution system, and associated appurtenances necessary for operation of the elevated tank. Electrical, Instrumentation, and SCADA Systems: Coordination and installation of electrical utility service, electrical panels, wiring, conduit, grounding and bonding, site and tank lighting, instrumentation, pressure monitoring equipment, SCADA controls, communications, and associated electrical and control system components. Site Security and Access: Installation of chain-link security fencing, gates, associated hardware, and other improvements necessary to provide secure access to the completed facility. Erosion Control and Environmental Compliance: Installation, inspection, maintenance, and removal of temporary erosion and sediment control measures; stormwater management and monitoring; compliance with applicable permits and regulatory requirements; and final stabilization and restoration of disturbed areas. Testing, Startup, and Project Closeout: Completion of required inspections, tank and piping testing, flushing, disinfection, bacteriological testing, electrical and SCADA system testing, startup, correction of deficiencies, final site cleanup, and submission of required closeout documentation. The Contractor shall coordinate construction activities with Effingham County, GMC, utility providers, and other contractors performing work associated with the Regional Water Supply Facilities project to minimize conflicts and maintain project progress. All work shall be performed in accordance with applicable federal, state, and local regulations, approved permits, construction plans, technical specifications, and Contract Documents. The scope described above is intended to provide a general overview of the project and shall not be considered an exhaustive listing of all work required. The Contractor shall be responsible for providing a complete, tested, and operational facility, including all materials, equipment, labor, and incidental work necessary to fulfill the requirements of the Contract Documents. Introduction Summary Background Contact Information Timeline Notice to Contractors EFFINGHAM COUNTY BOARD OF COMMISSIONERS 26322B12 , Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank NOTICE TO CONTRACTORS Bids will be received electronically by the Effingham County Board of Commissioners through the County’s eProcurement Portal, OpenGov, until 2:00 pm on Thursday, December 10, 2026 , Bids will be opened electronically through OpenGov following the submission deadline. The Work to be bid consists of furnishing all materials, labor and equipment for: The project includes furnishing all labor, materials, equipment, and services necessary to construct a 1.5-million-gallon concrete composite elevated water storage tank in Effingham County, Georgia. Work includes tank and foundation design and construction, site work, piping, tank erection and painting, electrical systems, supervisory control and data acquisition (SCADA), and related appurtenances, including testing and commissioning, in accordance with the project plans and specifications. MANDATORY PRE-BID CONFERENCE A MANDATORY pre-bid conference will be held at 1:00 pm on Tuesday, November 17, 2026 at Effingham County Board of Commissioners South Admin - Training Room 804 S. Laurel Street Springfield, GA 31329 Proposals will not be accepted from any firm that did not attend the pre-bid meeting for Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank . QUESTIONS Any questions that arise after the pre-proposal conference must be made in writing via the County's eProcurement Portal no later than 2:00 pm (Eastern Time) on Tuesday, December 1, 2026 . Questions will only be answered if submitted through the County's eProcurement Portal. Questions will be answered via the eProcurement Portal and/or via an addendum posted on the Effingham County eProcurement Portal on or before 2:00 pm on Friday, December 4, 2026 . BID BOND All bids shall be accompanied by bid security in an amount not less than five percent (5%) of the total bid amount, payable to or naming the Effingham County Board of Commissioners as obligee. Bidders may submit either an electronic bid bond through Surety2000 using the County’s eProcurement Portal or an original paper bid bond, certified check, or cashier’s check. Electronic bid bonds must be fully executed and submitted through the Portal before the bid submission deadline. A separate paper original is not required for an electronic bid bond accepted through the Surety2000 verification process. Bidders submitting paper bid security shall upload a copy with their bid and deliver the original to the Effingham County Procurement Office, 804 South Laurel Street, Springfield, Georgia 31329, before the bid submission deadline. The original shall be enclosed in a sealed envelope clearly marked with the project number and name. Mailing or shipping the original before the deadline does not satisfy this requirement unless it is received on time. Refer to the Vendor Questionnaire for detailed submission instructions. The BID BOND shall be subject to forfeiture to the Effingham County Board of Commissioners as liquidated damages if the BIDDER fails to execute the CONTRACT and provide the required PERFORMANCE BOND and PAYMENT BOND within fourteen (14) calendar days after receipt of the Notice of Award, subject to the terms of the bid bond and applicable law. A Notice to Proceed will be issued after receipt of the signed Contract, required Payment and Performance Bonds, and satisfactory proof of required insurance. The Contractor shall begin work within fourteen (14) calendar days after receipt of the County-issued Notice to Proceed. Payment will be made on a monthly basis for work performed the previous month, less retainage. The County will retain five percent (5%) of the gross value of the completed work as indicated by the current estimate approved by the Engineer. BIDDER'S CONFIRMATION The BIDDER is expected to examine the site of the proposed work, BIDDER’S CHECKLIST, INSTRUCTIONS TO BIDDERS, GENERAL CONDITIONS, SPECIFICATIONS, and AGREEMENT forms before submitting a BID. The Effingham County Board of Commissioners reserves the right to reject any and all Bids and to waive minor technicalities or informalities that do not materially affect the Bid or provide an unfair competitive advantage. Additionally, Effingham County may issue change orders altering the original scope of work to address changes or unforeseen conditions necessary for project completion, in accordance with the Contract Documents and applicable law. No Bid shall be withdrawn within sixty (60) days after the actual date of the opening thereof, except as permitted by applicable law. CONTRACT DOCUMENTS The CONTRACT DOCUMENTS may be examined at the following location: Effingham County Board of Commissioners, 804 South Laurel Street, Springfield GA, 31329. Copies of the CONTRACT DOCUMENTS may be obtained at: the County's eProcurement Portal. COMPLETION DAYS The Completion Date for this Contract shall be within 460 calendar days from receipt of Notice to Proceed. Instructions to Bidders INSTRUCTIONS TO BIDDERS 1.1 PURPOSE : The purpose of this document is to provide general and specific information for use in submitting a Bid to supply Effingham County with construction, equipment, supplies and/or services as described herein. All Bids/proposals are governed by the Code of Effingham County, and the laws of the State of Georgia. 1.2 HOW TO SUBMIT BIDS: All bids shall be submitted via the County's eProcurement Portal . BIDS NOT RECEIVED BY THE TIME AND DATE SPECIFIED WILL NOT BE OPENED OR CONSIDERED. 1.3 HOW TO SUBMIT AN OBJECTION: Objections from Bidders to this invitation to bid and/or these specifications should be brought to the attention of the County Purchasing Agent in writing. The objections contemplated may pertain to form and/or substance of the invitation to bid documents. Failure to object in accordance with the above procedure will constitute a waiver on the part of the business to protest this invitation to bid. 1.4 QUESTIONS: Any questions that arise after the pre-proposal conference must be made in writing via the County's eProcurement Portal no later than 2:00 pm (Eastern Time) on Tuesday, December 1, 2026 . Questions will only be answered if submitted through the County's eProcurement Portal. Questions will be answered via the eProcurement Portal and/or via an addendum posted on the Effingham Co Source: OpenGov https://procurement.opengov.com/portal/effinghamcounty/projects/321120 Canonical URL: https://govcontractfinder.com/contracts/effingham-county-regional-water-supply-facilities-1-5-mg-ele-opengov-4006-project-321120