Engineer Continuing Services Contract for Utility Projects State and local opportunity open City of Port St. Lucie 20260176 Posted: 2026-11-02T21:11:38.503Z Response deadline: 2026-12-07T20:30:00.000Z Pursuant to the Port St. Lucie City Code of Ordinance 35.07, this electronic Request for Qualifications (RFQu) is being issued to establish a continuing services contract with a minimum five (5) qualified proposers who will provide Engineer Continuing Services Contract for Utility Projects to the City of Port St. Lucie (hereinafter, “City”) as further described in this RFQu. The purpose of this RFQu is to provide the City with qualified engineering consultants on an as-needed basis to support the planning, design, permitting, construction administration, inspection, and management of utility and infrastructure projects. The contract allows the City to efficiently deliver Capital Improvement Program projects, respond to emergencies, maintain compliance with regulatory requirements, and obtain specialized technical expertise while reducing procurement time and administrative costs. Scope of Work Scope of Work Definitions of Acronyms For the purposes of this Solicitation and the resulting Contract, the following acronyms and abbreviations shall have the meanings indicated below. These definitions are provided to ensure clarity throughout the Scope of Work and all associated documentation. ACOE – U.S. Army Corps of Engineers CAD – Computer-Aided Drafting CEI – Construction Engineering and Inspection CIP – Capital Improvement Plan CMOM – Capacity Management, Operations, and Maintenance DEP – Florida Department of Environmental Protection EOR – Engineer of Record FDOT – Florida Department of Transportation FEMA – Federal Emergency Management Agency FHWA – Federal Highway Administration FDEP – Florida Department of Environmental Protection FPL – Florida Power & Light GIS – Geographic Information System GPS – Global Positioning System MCC – Motor Control Center MS4 – Municipal Separate Storm Sewer System NPDES – National Pollutant Discharge Elimination System NRCS – Natural Resources Conservation Service NTP – Notice to Proceed RFI – Request for Information R/W – Right-of-Way SCADA – Supervisory Control and Data Acquisition SORP – Sanitary Sewer Overflow Response Plan SFWMD – South Florida Water Management District SRF – State Revolving Fund TMDL – Total Maximum Daily Load USD – Utility Systems Department WIFIA – Water Infrastructure Finance and Innovation Act Scope of Work The Consultant shall provide professional engineering services for projects within the utility work program and to support residential and commercial development consisting of studies, design, permitting, and certification for all types of water and wastewater pipelines, facility improvements, lift station rehabilitation, pump station improvements, repairs, and upgrades to the water and wastewater utility system. The City will determine the exact scope of work under this Contract on a project-by-project basis, which may include, but is not limited to, the categories and types of services listed below. Specific tasks for this project are defined per project. In addition, all projects assigned under this contract must comply with all RFQu requirements set forth herein. The City intends to procure the services of no fewer than five (5) Professional Engineering firms to provide services for the City’s adopted Utility Capital Improvement Plan (CIP), Utility Master Plan, and/or any other utility-related projects and any subsequent amendments. The continuing contracts will be utilized for projects and planning/study-related activities in accordance with Section 287.055, Florida Statutes. Professional engineering firms must be registered in the State of Florida and maintain staff with the appropriate qualifications and experience necessary for each individual project. In addition, firms must be able to comply with all applicable federal guidelines and requirements, as several CIP projects are federally funded. The following represents the types of projects for which the Utility Systems Department may require professional engineering, scientific, and technical services, including but not limited to: SERVICES The scope of this Contract covers the following services, among others: Distribution and Collection Systems Water distribution system design, including pipelines, appurtenances, and related improvements Raw water main design, including transmission mains, appurtenances, and related improvements Reuse water main design, including distribution mains, appurtenances, and related improvements Wastewater collection system design, including gravity mains, force mains, low-pressure force mains, and related improvements Water & Wastewater Facilities Water treatment facility design, upgrades, and improvements Wastewater treatment and reclamation facility design, upgrades, and improvements Raw water well facility design, testing, and upgrades Pump and repump station facility design and upgrades Membrane system design and replacement Fluid metering facility design and upgrades Electrical, Instrumentation & Controls Electrical system and motor control center (MCC) design and upgrades SCADA system design, modification, and upgrades Control panel design Instrumentation and controls design and upgrades Structural & Geotechnical Structural engineering design and evaluation Geotechnical investigation and engineering support Surveying & Mapping Boundary, topographic, utility, R/W, and easement surveys GIS and GPS mapping services Legal descriptions and sketches for easement and R/W acquisition Construction Administration, Management, and Inspections (CEI) Conducting and/or attending preconstruction meetings. Review and approval of shop drawings, products, submittals, RFI, verified quantities, and similar items during the construction-related phase. Review/ prepare pay applications, change orders, schedules, progress reports, and as-built drawings Construction contract administration. Construction engineering and inspection services. Coordination/provision of record drawings and as-built drawings. Prepare and certify utility systems, if needed. Observe construction projects, prepare daily inspection reports, take photographs, and provide to the City's Project Manager. Additional engineering services may be required during construction. OTHER SERVICES / STUDY ACTIVITIES Planning & Studies Prepare various concepts, alternative analyses, and feasibility studies for Capital Projects as needed. Prepare various facility plans and evaluation studies for Capital Projects as needed. Analyze alternative design concepts and prepare technical reports as needed. Utility master planning and CIP development Facility evaluation and condition assessment Hydraulic and water quality modeling Water and wastewater treatment pilot plant evaluations and studies Asset management, data acquisition, and syst Introduction Purpose of Procurement Pursuant to the Port St. Lucie City Code of Ordinance, Section 35.07 , and Section 287.055 , Florida Statutes (Consultants’ Competitive Negotiation Act), the City of Port St. Lucie, a Florida Municipal corporation (“City”) is requesting Proposals from qualified firms to provide Professional Engineering Services for Engineer Continuing Services Contract for Utility Projects . This electronic Request for Qualifications (RFQu) has been developed to solicit responses from consulting firms (or teams of firms) proven to be qualified and experienced in providing professional Engineering Services. A descriptive overview of the City can be found at About PSL | City of Port St. Lucie, FL (cityofpsl.com). Please visit the City’s website to familiarize yourself with how our city is structured and operates. Please contact the Issuing Officer with any questions. Overview of the RFQu Process The objective of the RFQu is to select a qualified Proposer (as defined by Section 1 – “Purpose of Procurement”) to provide the services outlined in this RFQu to the City. This RFQu process will be conducted to gather and evaluate responses from Proposers for potential award. All qualified Proposers are invited to participate by submitting responses, as further defined below. After evaluating all Proposers’ responses received prior to the closing date of this RFQu and following negotiations (if any) and resolution of any contract exceptions, the preliminary results of the RFQu process will be publicly announced (or posted) to the electronic bidding system, to include the names of all participating Proposers and the evaluation results. Subject to the protest process, final Contract award(s) will be publicly announced thereafter. NOTE TO PROPOSERS: The general instructions and provisions of this document have been drafted with the expectation that the City may desire to make one award or multiple awards. For example, this document contains phrases such as “contract(s)” and “award(s).” Please refer to Section 1.1 – “Purpose of Procurement,” and Section 6 – “Proposal Evaluation, Negotiations, and Award,” for information concerning the number of Contract awards expected. Schedule of Events The Schedule of Events set out herein represents the City’s best estimate of the schedule that will be followed. However, delays to the procurement process may occur, which may necessitate adjustments to the proposed schedule. If a component of this schedule, such as the close date, is delayed, the rest of the schedule may be shifted as appropriate. Any changes to the dates up to the closing date of the RFP will be publicly posted prior to the closing date of this RFQu. After the close of the RFQu, the City reserves the right to adjust the remainder of the proposed dates, including the dates for evaluation, negotiations, award, and the Contract term, on an as-needed basis, with or without notice. Release of RFQu: November 2, 2026 Question Submission Deadline: November 16, 2026, 5:00pm Question Response Deadline: November 23, 2026, 4:00pm Response Submission Deadline: December 7, 2026, 3:30pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2679124870099571?p=QIlMeS3j3r5NjTcsLC Meeting ID: 267 912 487 009 957 1 Passcode: qd9yE9Xd ________________________________________ Dial in by phone +1 561-437-3554, Phone conference ID: 689 299 456# Evaluation Phase (Non-Mandatory): January 12, 2027, 1:00pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2609359071423907?p=PXHj5OmrYqU1lhNoXl Meeting ID: 260 935 907 142 390 7 Passcode: Vp92jM7h ________________________________________ Dial in by phone +1 561-437-3554, Phone conference ID: 334 919 249# The City reserves the right to proceed to award without further discussions after receipt of the initial proposals, in which case, evaluation committee reviews, negotiations, and proposal revisions may not be required. Official Issuing Officer (Procuring Agent) Max Previlon , Procurement Contracting Officer III O. 772-871-7337 mprevilon@cityofpsl.com Definition of Terms Please review the following terms: Consultants’ Competitive Negotiation Act (“CCNA”) - Section of the Florida Statutes that governs the acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping services. See section 287.055, Florida Statutes . Consultant(s) - companies desiring to do business with the City (Also called “Engineer,” “Bidder,” “Proposer,” “Firm,” "Respondent," or “Offeror.”) City of Port St. Lucie (“City”) - the governmental entity identified in Section 1.1 “Purpose of Procurement" of this RFQu. Contract - agreement entered into between City and the awarded Proposer. Immaterial Deviation - does not give the Proposer a substantial advantage over other Proposers. Material Deviation - gives the Proposer a substantial advantage over other Proposers and thereby restricts or prevents competition. Procurement Management Division (“PMD”) - the City department that is responsible for the review and possible sourcing of all publicly sourced solicitations. Responsible – means the Proposer, whether a company or an individual, has the financial and technical capacity to perform the requirements of the solicitation and subsequent Contract which will assure good faith performance of the Contract. Responsive – means the Proposer, whether a company or an individual, has submitted an offer which conforms in all material respects to the requirements set forth in the solicitation. Sourcing Platform/Electronic Bidding System - OpenGov. Any special terms or words which are not identified in the City’s RFQu Document may be identified separately in one or more attachments to the RFQu. Please download, save and carefully review all documents in accordance with the instructions provided in Section 3 – “Instructions to Proposers,” of this RFQu. Contract Term The Initial term of the contract(s) is for three (3) calendar years from the execution date. The City shall have two (2), one (1) year option(s) to renew, which options shall be exercisable at the sole discretion of the City. Renewal(s), if provided and selected solely by the City, will be accomplished through the issuance of Contract Amendment. In the event that the contract(s), if any, resulting from the award of this RFQu shall terminate or be likely to terminate prior to the making of an award for a new contract for the identified products and/or services, the City may, with the written consent of the awarded Proposer(s), extend the contract(s) for such period of time as may be necessary to permit the City’s continued supply of the identified products and/or services. The Contract(s) may be amended in writing from time to time by mutual consent of the parties. Unless this RFQu states otherwise, the resulting award of the Contract(s) does not guarantee volume or a commitment of funds. Hours of Service The standard hours of work allowed in the City’s rights-of-way are from 7:00 a.m. to sundown Monday through Friday. Any work performed by the Consultant outside of the aforementioned time limit requires special authorization by the City and requires that the Consultant obtain a noise permit from the Port St. Lucie Police Department (PSLPD). All equipment operated at night shall comply with the noise levels established by the City of Port St. Lucie noise ordinance. Any additional costs associated with work outside of the hours of work allowed shall be borne by the Consultant. This shall include, but is not limited to, costs of inspection, testing, police assistance, and construction administration. All night, Saturday, Sunday, and/or Holiday work must be authorized by the City and requires that the Consultant obtain a noise permit from the PSLPD. All night work within the City’s rights-of-way requires a minimum forty-eight (48) hour prior notice to the City. This clause shall not pertain to crews organized to perform maintenance work on equipment or to operate and maintain special equipment such as dewatering pumps, which may be required to work twenty-four (24) hours per day. Instructions to Proposers This section contains general business requirements. By submitting a response, the Proposer is certifying its agreement to comply with all the identified requirements of this section and that all costs for complying with these general business requirements are included in the Proposer’s submitted pricing. By submitting a response to the RFQu, the Proposer is acknowledging that the Proposer: Has read the information and instructions, and Agrees to comply with the information and instructions contained herein. General Information and Instructions 3.1.1 Familiarity with Laws and Regulations It is the responsibility of responding Proposers to be familiar with all Federal, State, and local laws, ordinances, rules, and regulations, that may affect the work. Ignorance on the part of the Awarded Contractor will in no way relieve it from Contract responsibility. 3.1.2 Restrictions on Communicating with Staff/ Cone of Silence From the issue date of this RFQu until the time of City Council's approval of the award or the City Manager's approval when proposal amount is below the required formal solicitation threshold (or the RFQu is officially canceled), Proposers are not allowed to communicate for any reason with any City staff or elected officials except through the Issuing Officer named herein, during the Bidders'/Offerors’ conference (if any), as defined in this RFQu, or as provided by existing work agreement(s). This is commonly known as a Cone of Silence during the procurement process as identified in the City Code of Ordinances, Section 35.13 . Prohibited communication includes all contact or interaction, including but not limited to, telephonic communications, emails, faxes, letters, or personal meetings, such as lunch, entertainment, or otherwise. The City reserves the right to reject the response of any Proposer violating this provision. Further information on this topic can be found on the Cone of Silence and RFQu Communication Document. 3.1.3 Submitting Questions All questions concerning this RFQu must be submitted in writing on the OpenGov Platform during the Question and Answer open period. Please select the Question and Answer tab in the RFQu project and click the "Ask Question" option. Once the question has been entered, select the "Submit Question" button. Enter a subject in the Subject field and then type the question in the Question field below. Once finished, select "Submit." No questions other than written will be accepted. No response other than written will be binding upon the City. All Proposers must submit questions by the deadline identified in the Schedule of Events for submitting questions. Proposers are cautioned that the City may or may not elect to entertain late questions or questions submitted by any other method than as directed by this section. 3.1.4 Attending Pre-Proposal Conference The Pre-Proposal Conference or any other information session (if indicated in the Schedule of Events) will be held at the offices referred to in Section 1.3 - “Schedule of Events” of this RFQu. Unless indicated otherwise, attendance is not mandatory, although Consultants are strongly encouraged to attend. However, in the event the conference has been identified as mandatory, then a representative of the Consultant must attend the conference in its entirety to be considered eligible for Contract award. The Consultant is strongly encouraged to allow ample travel time to ensure arrival in the conference meeting room prior to the beginning of any mandatory conference. The City reserves the right to consider any representative arriving late to be “not in attendance.” Therefore, all Consultants are strongly encouraged to arrive early to allow for unexpected travel contingencies. 3.1.5 The City's Right to Request Additional Information- Proposer's Responsibility Prior to Contract award, the City must be assured that the selected Proposer has all the resources to successfully perform under the Contract. This includes, but is not limited to, adequate number of personnel with required skills, availability of appropriate equipment in sufficient quantity to meet the on-going needs of the City, financial resources sufficient to complete performance under the Contract, and experience in similar endeavors. If, during the evaluation process, the City is unable to assure itself of the Proposer’s ability to perform, if awarded, the City has the option of requesting from the Proposer any information deemed necessary to determine the Proposer’s responsibility. If such information is required, the Proposer will be no Source: OpenGov https://procurement.opengov.com/portal/cityofpsl/projects/295030 Canonical URL: https://govcontractfinder.com/contracts/engineer-continuing-services-contract-for-utility-projects-opengov-9427771-project-295030