Family Justice Center Project (Project No. OD564) State and local opportunity open County of San Mateo 2027-RFP-00226 Posted: 2026-11-18T23:00:01.795Z Response deadline: 2027-01-04T22:00:22.277Z The Department of Public Works (Department) is seeking a general contractor for the Family Justice Center (Project No. OD564) (Project). The anticipated construction is to be performed at 1510 Fashion Island Boulevard, San Mateo, CA 94403. The work to be done consists, in general, of providing all labor, materials, tools, appurtenances, and equipment required as well as any other items and details not mentioned but required by the Contract Documents and Project Specifications and as directed by the Director of Public Works or designee. The target start date and term for the proposed services are subject to negotiation of a final agreement, through the completion of the Project. The Contract Time for completion of all the Work of the Project is approximately Two Hundred Four (244) calendar days , starting the day after the anticipated notice to proceed date, as defined as sufficiently complete in accordance with the Contract Documents and Project Specifications. Bid Requirements Notice to Contractors NOTICE IS HEREBY GIVEN that the Board of Supervisors of the County of San Mateo, State of California, will receive sealed bids for the following construction contract: Family Justice Center Project (Project No. OD564) 1510 Fashion Island Boulevard San Mateo, CA 94403 Bids must be submitted in the bidder's package on the forms furnished and in accordance to the Attachments section of this solicitation. The Contract Documents may be examined and/or downloaded at the County of San Mateo's Procurement website at https://procurement.opengov.com/portal/smcgov (includes complete bid package) or through the Department of Public Works website. The Project includes modern administrative offices, secure law enforcement interview and observation rooms, a boutique, and dedicated medical services area. The scope entails the selective interior demolition of approximately 20,000 square feet on the second floor to reconfigure the space for specialized functional layouts, along with a conference room on the first floor, staff offices and work areas on the third floor. Additionally, the project includes mechanical, electrical, and plumbing (MEP) infrastructure upgrades throughout the facility to ensure full code compliance, life-safety reliability, and long-term operational efficiency. Bidders must be fully qualified, licensed ( Class B - General Contractor ), certified, and insured to perform the Work requested for the Project. All work performed must meet all current applicable laws and regulations. The Work to be performed consists, in general, of providing all labor, materials, tools, appurtenances, and equipment required, as well as any other items and details not mentioned above but required by the Contract Documents and as directed by the Director of Department of Public Works. A Mandatory Pre-Bid Conference will be held at 1510 Fashion Island Boulevard, San Mateo, CA 94403. The Pre-Bid Conference is scheduled for Thursday, December 3, 2026 at 2:00 pm . It is mandatory for interested contractors to attend the pre-bid conference, sign the attendance roster and visit the project site to become familiar with project. Bids will not be accepted from any prime contractor not present at the mandatory pre- bid conference as evidenced on the attendance roster. Please review the Project Plans & Specifications in advance of the Mandatory Pre-Bid Conference and Project Site Visit. Questions regarding this project shall be submitted and only accepted through the Family Justice Center (Project No. OD564) solicitation on OpenGov. Questions received at the pre-bid conference will be deferred and will need to be submitted through OpenGov to ensure all questions are addressed, answered and available for all proposers. Bids will only be accepted through the County of San Mateo's eProcurement portal, OpenGov, on or before Monday, January 4, 2027 at 2:00 pm . No paper copies will be accepted. The bids will be opened through a webcast soon after the specified closing time. Bidders may participate in the public bid opening by visiting the Project solicitation and clicking on the Microsoft Teams Online Bid Opening Webcast. Bids shall be submitted using forms furnished in the solicitation. Copies of the forms are also attached to the Project Manual of the Construction Documents and shall be accompanied by a Bid Surety Bond. A bid surety bond will be required in amount 100% of the amount of the bid. The County of San Mateo, State of California, reserves the right to reject any and all bids, alternate bids, or unit prices and waive any irregularities in any bid received. No bidder may withdraw its bid for a period of ninety (90) days after the date set for the opening thereof. Prospective bidders must be fully qualified, licensed, certified, and insured to perform the Work requested for the Project. All work performed must meet all current applicable laws and regulations. Pursuant to Labor Code Sections 1770, et seq., the Director of the Department of Industrial Relations has determined the general prevailing rate of wages in the County of San Mateo for each craft, classification, or type of workman needed to execute the contract. The prevailing rates so determined are based on an 8-hour day, 40-hour week, except as otherwise noted. Existing agreements between the Building Trades and the Construction Industry groups relative to overtime, holidays and other special provisions shall be recognized. It shall be mandatory upon the Contractor and upon any sub- contractors under them, to pay not less than the said specific rates to all laborers, workmen or mechanics employed by them in the execution of this contract. Pursuant to State Senate Bill SB 854 (Stat. 2014, Ch. 28), effective January 1, 2015: No Contractor or Subcontractor may be listed on a bid proposal for a Department of Public Works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)). No Contractor or Subcontractor may be awarded a contract for public work on a Department of Public Works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All Contractors and Subcontractors must furnish electronic certified payroll records directly to the DIR Labor Commissioner (aka Division of Labor Standards Enforcement). Contractor and its subcontractor(s) agree to pay not less than prevailing rates of wages and be responsible for compliance with all the provisions of the California Labor Code, Article 2-Wages, Chapter 1, Part 7, Division 2, section 1770 et seq and section 1810 et seq. A copy of the prevailing wage scale established by the Department of Industrial Relations is on file in the General Requirements Bids shall be received in accordance with the Contract Documents. Each Bidder shall carefully read the complete Contract Documents including these instructions. Before submitting a bid, each Bidder shall attend the mandatory pre-bid meeting and visit the project site and evaluate all conditions and limitations involved thereon as no allowance will be made because of the lack of such examination and knowledge. Contractors bidding to the County shall have a minimum five (5) years continuous experience as a prime contractor on projects in California of comparable quality, size, complexity, and type, multi-trade, $10,000,000-$20,000,000, municipal projects. Contractors bidding to the County shall have completed as the prime three (3) projects of comparable quality, size, complexity and type, preferably in an operating facility, and the projects have been closed with respective authority-having-jurisdiction compliance. Contractor is legally authorized to do business in the State of California. Subcontractors shall meet the above three requirements in C, D and F, as it pertains to their work. Within three (3) business days of request by County, Contractor shall submit evidence of compliance to the above qualifications (C-F) and list of all project work performed, both complete and incomplete, within the previous three (3) years including the names and phone numbers of the Owners and Architects. Within three (3) business days of request by the County, Contractor shall submit Superintendent’s qualifications with a minimum of three (3) years supervising projects of comparable quality, size, complexity, and type. Construction Requirements Permits: All work is subject to inspection and acceptance of the Authority Having Jurisdiction (AHJ). Differing Site Conditions: Contractor is advised the work will be performed in an existing structure. Work shall be performed between the construction hours of 7:00AM to 5:00PM, unless otherwise agreed upon between the County, Contractor and County’s owner representative due to extenuating factors. All demolition work shall be performed between the hours of 5pm to 7am the next day. Contractor is advised the facility will remain occupied and the County intends to maintain active utility operations specific to facility systems during construction. Existing systems and utility outages, and shutdowns shall be approved in advance by the County. Refer to Project Specifications. Contractor to coordinate with the County regarding providing temporary construction barriers and public wayfinding signage for duration of project. Schedule: Contractor’s attention is directed to the Contract Times and the requirement of the Contractor to achieve substantial completion of the work within said time periods. Construction shall be completed within Contract Times defined as sufficiently complete in accordance with the Contract Documents to allow the Owner to occupy or utilize for its intended use. Sequence of Construction. Bidder is advised meaningful construction can occur simultaneously on Levels 1, 2, and 3, however completing Level 2 shall be the priority. Contractor shall be required to attend bi-weekly owner/Architect/Contractor (OAC) construction project meetings for the duration of the project. Contractor shall prepare meeting agendas, meeting minutes, and provide updates per Contract Documents. Contractor’s Personnel: Contractor shall submit within ten (10) working days from the execution of the Contract a list of names, addresses, and telephone numbers of key personnel who are to be contacted in case of emergencies on the job during non-working hour, including Saturdays, Sundays, and Holidays. Contractor shall update the list during the project and ensure the latest revision is posted in project office and provided to County Representatives. All personnel who will have access to the work site may be required to wear photo identification issued by the County at all times. The County reserves the right to reject personnel with current parole or probationary status and/or criminal records. County staff reserves the right to request a worker be excused from the job site for not wearing the appropriate photo identification issued by the County. No claims for delays will be allowed for failure on the part of the Contractor to enforce this requirement. Bid Submission Bids shall be submitted in accordance with the Contract Documents. Bid documents shall be submitted on County forms provided in this solicitation and are to be properly and fully completed, including the designation of all subcontractors who will perform work or labor or render service on behalf of Contractor, in an amount in excess of one-half of one percent of the Contractor's total bid. Bidders must complete and submit all of the following documents as required in Section 3. Technical Proposal with their bid. All proposals shall be submitted through OpenGov. Paper copies will not be accepted. No bid will be considered which makes exceptions, changes, or in any manner makes reservations to the terms of the Contract Documents. Unit Prices on all classes of work as specified or required shall be submitted. Additions to or deductions from the contract sum shall be based on these unit prices. However, none will be acceptable that are above and beyond a fair and just amount and may be subject to third party estimator verification and reasonable adjustment before the signing of the Contract or bid disqualification. Each bid must give the full business address of the bidder and be signed by the bidder with his usual signature. Bids by partnerships must furnish the full name of all partners and must be signed in the partnership name by one of the members of the partnership or by any authorized representative, followed by the signature and designation of the person signing. Bids by corporations must be signed with the legal name of the corporation, followed by the name of the State of incorporation and by the signature and designation of the president, secretary, or other person authorized to bind it in the matter. Corporations must furnish a Certificate attesting to the existence of the corporation. The name of each person signing shall also be typed or printed below the signature. When requested by the Owner, satisfactory evidence of the authority of the officer signing on behalf of the corporation shall be furnished. No bid will be considered which is received after the date and time set for the deadline to receive bids as stated herein, as determined by County. Bid Opening Notice will be released through OpenGov soon after the hour set for bid opening as possible. The bid opening is open to bidders and the public. No bid will be considered which is received after the time set for bid opening as determined by the County. Contract Documents Questions regarding the Contract Documents, such as discrepancies, conflicts, omissions, doubt as to meanings, or regarding scope of work shall be posted as a question in OpenGov. Inquiries must be received by the Authorized Contact Person by the deadline for questions. Inquiries will be answered in OpenGov to all bidders of record if a response or written clarification is warranted in the opinion of the Owner. The Owner will not be responsible for oral clarifications. Regarding questions on the Contract Documents in the absence of written clarifications, Contractor is instructed to bid the more expensive method or materials. Bonds and Insurance Bid Bond: Bids shall be accompanied a Bid Bond of not less than ten percent (10%) of the amount of the base Bid, plus all additive alternates as required. Bid bond must be completed and uploaded to OpenGov (refer to Technical Proposal section). Original must be mailed to the Department of Public Works, 555 County Center, 5th Floor, Redwood City, CA 94063 Attention: Roxanne Maquinana. The Surety on Bidder’s Bid Bond must be an insurer admitted in the State of California and authorized to issue surety bonds in the State of California. Bids submitted without necessary bid security will be deemed non-responsive and will not be considered. Payment and Performance Bonds: If contractor is awarded, two bonds, as itemized below and in the forms attached, shall be furnished by the successful bidder within ten calendar days after notification of award. The bonds shall be in the form of surety bonds issued by corporations duly and legally licensed to transact business in the State of California, satisfactory to the County. Premiums for said bonds shall be paid by the Contractor and maintained at Contractor's expense during the period prescribed herein for the completion of the work to be done under the contract. A Performance Bond in amount of One Hundred Percent (100%) of the Contract amount to insure County during construction and for the guarantee period after completion against faulty or improper materials or workmanship and to assure County of full and prompt performance of Contract. A Payment Bond in amount of One Hundred Percent (100%) in accordance with the laws of the State of California to secure payment of any and all claims for labor and material used or consumed in performance of this Contract. Insurance: Workers' Compensation Insurance, Comprehensive General Liability Insurance, Motor Vehicle Liability Insurance, Public Liability and Property Damage Insurance, and All Risk Property (Builder's) Insurance and evidence thereof shall be furnished to the County and shall be maintained by the contractor as detailed in General Conditions. Wage Rate Requirements The Department of Industrial Relations has determined the general prevailing rate of wages in the County of San Mateo. It shall be mandatory upon the Contractor and all of its subcontractors to pay not less than the said current prevailing wage rates to all laborers, workmen, or mechanics employed by them in the execution of a Contract. The Contractor is advised that, pursuant to State Senate Bill SB 854 (Stat. 2014, Chapter 28), effective January 1, 2015, all contractors and subcontractors working on a contract for public work on a public works project (awarded on or after April 1, 2015) must furnish electronic certified payroll records to the Labor Commissioner. In accordance with the General Conditions, it shall be mandatory upon the Contractor and Subcontractors to pay not less than the said prevailing wage rates to all laborers, workmen, or mechanics employed by them in the execution of this Contract. When applicable, both Contractor and Subcontractor hereby agree to pay not less than prevailing rates of wages and be responsible for compliance with all the provisions of the California Labor Code, Article 2-Wages, Chapter 1, Part 7, Division 2, Section 1770 et seq and Section 1810 et seq. A copy of the prevailing wage scale established by the Department of Industrial Relations is on file in the office of the Director of Public Works, and available at www.dir.ca.gov/DLSR or by phone at 415-703-4774. California Labor Code Section 1776(a) requires each Contractor and Subcontractor keep accurate payroll records of trades workers on all public works projects and to submit copies of certified payroll records upon County’s request. The Contractor’s attention is further directed to the following requirements of State Senate Bill SB 854 (Stat. 2014, Chapter 28), effective January 1, 2015: No Contractor or Subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)). No Contractor or Subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Contractor is further advised that, pursuant to State Senate Bill SB 854 (Stat. 2014, Chapter 28), effective January 1, 2015, all contractors and subcontractors working on a contract for public work on a public works project (awarded on or after April 1, 2015) must furnish electronic certified payroll records to the Labor Commissioner. Project Labor Agreement The County of San Mateo Board of Supervisors has adopted a Project Labor Agreement (PLA) policy that applies to County public works projects meeting the award date and dollar threshold criteria identified below. The Master PLA is attached to this solicitation and incorporated herein by reference. Award Date Threshold On or After July 1, 2026 $3,000,000 (Three Million Dollars) On or After July 1, 2027 $2,500,000 (Two Million Five Hundred Thousand Dollars) On or After July 1, 2 Source: OpenGov https://procurement.opengov.com/portal/smcgov/projects/325318 Canonical URL: https://govcontractfinder.com/contracts/family-justice-center-project-project-no-od564-opengov-723-project-325318