Fiber Reinforced Bituminous Membrane Surface Treatment State and local opportunity open County of Wayne, NY BB27023 Posted: 2026-11-18T20:24:39.114Z Response deadline: 2027-01-07T18:00:00.000Z The County of Wayne, NY is soliciting sealed responses for Fiber Reinforced Bituminous Membrane Surface Treatment . Responses are due , on or before 1:00 pm prevailing time on Thursday, January 7, 2027 . Late responses will not be accepted. Fiber Reinforced Bituminous Surface Treatment 1-5,000 S.Y. Per Day 5,001-10,000 S.Y. Per Day 10,001-20,000 S.Y. Per Day 20,001-40,000 S.Y. Per Day 40,001 + S.Y. Per Day 1-5,000 S.Y. Per Day 5,001-10,000 S.Y. Per Day 10,001-20,000 S.Y. Per Day 20,001-40,000 S.Y. Per Day 40,001 + S.Y. Per Day Optional Items If Agency elects to require the Contractor to provide any or all of these items If Contractor furnishes and delivers aggregate to aggregate chip spreader. If Contractor furnishes and operates self propelled aggregate chip spreader. If Contractor furnishes and operates pneumatic tired roller (per roller). If Contractor furnishes maintenance & Protection of Traffic as per the MUTCD. If Contractor furnishes and operates steel wheel roller. If Contractor furnishes and operates self propelled broom or vacuum. Project Details / Scope of Work Description The work shall consist in the construction of a fiber reinforced bituminous membrane surface treatment known as “FiberMat-Type A” as a Stress Absorbing Membrane, SAM and as “FiberMat-Type B” when used as a Stress Absorbing Membrane Interlayer, SAMI. This is accomplished by using a specific applicator, which can be mounted on an asphalt distributor modified for applying the surface treatment of bituminous binder reinforced with glass fibers. The applicator comprises an open bottomed spray bar housing fan or blower for producing a down draft in the housing, and at least one spray bar mounted on the housing and adapted to extend transversely in the direction of movement of the asphalt distributor on which the unit is mounted. A number of nozzles spaced longitudinally along the spray bar for spraying bituminous material, means of controlling the nozzles, and a number of sources for dispensing the cut glass fibers through the open bottomed housing to the surface of the bituminous material previously sprayed shall also be included. Asphalt emulsion, aggregate and in-place chopped fibers are combined to form a versatile treatment, ideal for sealing as a SAM and arresting severely alligator cracked surfaces. The in-place chopped fiber gives the surface an improved tensile strength. When applied within the pavement structure the fiber reinforced bituminous membrane surface treatment acts as a SAMI for the treatment of reflective cracking prior to the construction or placement of subsequent layers. Materials Bituminous Materials Bituminous Material Approval. The bituminous material shall be obtained from a storage facility that has been approved by the Director, Materials Bureau within the current calendar year, before the start of work. Bituminous Material Selection. The selected bituminous material shall be compatible with the aggregate to be used. It is the contractor’s responsibility to ensure compatibility between the bituminous material and the aggregate. The selection of bituminous material shall be subject to the approval of the NYSDOT, Materials Bureau Engineer, and conform to the standards below with the following exceptions. Surface Treatment. Material Designation Grade Description 702-4101P CRS-1P Polymer modified cationic asphalt emulsion or where appropriate, 702-4101P CRS-2P Polymer modified cationic asphalt emulsion, Elastic recovery, 10°C – minimum 60%. Aggregates The aggregates for the fiber reinforced bituminous membrane surface treatment shall conform to the requirements of NYSDOT Item Section 703-02, "Coarse Aggregate" and be from an approved source. Where aggregates for pavement surface treatment are from more than one source or of more than on type of material, they shall be proportioned and blended to provide a uniform mixture. The regional Director or the authorized representative shall approve the procedure used for this proportioning. Where the fiber reinforced bituminous membrane surface treatment is to be considered as a SAM then the aggregate size shall be Size 1ST or Size 1A or a combination of both as in a double dressing. Where the fiber reinforced bituminous membrane surface treatment is to be considered as a SAMI, then the aggregate size shall be Size1A only. In both cases the aggregate shall meet one of the following: Limestone having an acid insoluble content of not less than 20%, excluding particles of chert and similar siliceous rocks. Blends of siliceous and non-siliceous and non-siliceous limestone will not be permitted. Dolomite. Sandstone, granite, chert, trap rock, ore tailings, or other non-carbonate materials. Gravel, or a natural or manufactured blend of two or more of the following types of material; limestone, dolomite, gravel, sandstone, granite, chert, trap rock, ore tailings, slag or other similar materials meeting the following requirements. Non-carbonate plus 3.2mm particles must comprise a minimum 10% of the total aggregate (by weight with adjustments to equivalent volumes for materials of different specific gravities). For Size 1A a minimum of 20% of plus 4.75mm particles must be non-carbonate. For Size 1 ST a minimum of 20% of plus 9.5mm particles must be non-carbonate. Polymer modifier The ideal amount of solid or dry polymer modifier shall be 3%, based on the asphalt weight. The polymer materials shall be milled or blended into the asphalt or blended with the "soap phase" or post added to the emulsion but at all times ensuring good homogenization of the polymer with in the asphalt emulsion. Fiber The glass fiber is E Class from an approved source determined by the license holder. The glass fiber spools are supplied internally wound, in coils or cheeses. Typically the spools are cut in-place into 60mm,(2.38”) lengths which are distributed uniformly across and between the two parallel applications of modified asphalt emulsion. Glass fiber spread rates are up to 120g/sqm, (4oz), with additional asphalt emulsion rates of spread, depending on the site requirements. Construction Details Weather and Seasonal Limitations. The fiber reinforced bituminous membrane surface treatment may be applied on a dry or damp surface, but should not be laid where there is standing water or on a wet surface. Application should only be undertaken when the surface temperature is at least 10°C, (50°F), and rising, subject to site inspection. Greater initial traffic speed control may be required in certain circumstances, for example when the surface temperature is low. The fiber reinforced bituminous membrane surface treatment shall be placed normally in New York during the period May 1st to the third Saturday in September. Application outside of these times is permissible only with the approval of the contractor and local Engineer. Equipment. The following equipment shall be required: Bituminous Material Distributor The liquid bituminous fiber applicator is used that could be mounted on a vehicle for applying a surface treatment of bituminous binder reinforced with glass fibers. The applicator shall comprise an open bottomed spray bar housing, a fan or blower producing a down draft in the housing, and at least one spray bar mounted on the housing and adapted to extend transversely in the direction of movement of the vehicle on which the applicator is mounted. A number of nozzles spaced longitudinally along the spray bar for spraying binder material, means for controlling the nozzles, and a number of sources for dispensing cut glass fiber through the open bottomed housing to the surface of the binder material previously sprayed shall also be included. The applicator shall have been calibrated within the previous 12 months for transverse and longitudinal distribution application rates according to ASTM D2995, Practice for Determining Application Rate of Bituminous Applicator or other suitable method. The bituminous fiber applicator shall be equipped, maintained, and operated so that the bituminous materials can be applied at controlled rates from 0.1 l/m2 (0.022gal/SY) to 2.5 l/m2 (0.56gal/SY). The fiber is applied at controlled rates from nominally 30 to 120g/m2 (approx.1-4oz/SY). These applications shall be such that a uniform first layer of asphalt emulsion is applied followed by uniform layer of glass fibers that is chopped in-place and covered with a uniform second layer of asphalt emulsion. Self-propelled aggregate spreader. Aggregate spreader shall be a self-propelled unit capable of uniformly spreading the aggregate at the required rate on a minimum width of 150mm wider than the width of the lane to be treated. The spreader shall meet the approval of the Engineer and be calibrated similar to the test method used in ASTM D2995, within the previous 12 months, for transverse and longitudinal distribution. Pneumatic tire roller. The Engineer will require a sufficient number of pneumatic tire rollers to permit the initial rolling of the aggregate to occur within 5 minutes of the application of the fiber reinforced bituminous membrane surface treatment. The pneumatic roller shall be self-propelled and have oscillating wheels with smooth tread tires and will have a minimum ballasted weight of 9 metric tons or 10 US tons. The tire pressure for all wheels shall be uniform within 2psi. The rollers shall be operated at a maximum speed of 8 km/hr, (5mph). To prevent pick-up of the aggregate on the tires, the tires shall be kept moistened with water mixed with small quantities of detergent or other material approved by the Engineer. In no case shall a solvent having affect upon the fiber reinforced bituminous membrane surface treatment be used. Static steel-wheel rollers shall be self-propelled and be either 9 to 11 metric ton tandem three-axle type or 7 to 9 ton tandem two-axle type. This shall be used particularly when a SAMI application is specified for the fiber reinforced bituminous membrane surface treatment following the pneumatic tire roller. The aim is to crush the aggregate and blind the surface prior to the application of the new overlay. Self-propelled Rotary Power Broom A self-propelled rotary power broom shall so be designed, equipped, maintained and operated so that the pavement surface can be swept clean. The broom shall have an adjustment to control downward pressure. The power shall meet the approval of the Engineer. In the case where a SAMI is being overlaid the same day then a Vacuum sweeper shall be used only. If the County or any Town’s work forces are delayed for more than an hour by lack of materials or mal-functioning equipment, the bidder shall be liable for all the wages including all benefits and state rental rate on all equipment and men affected by the delay. Determination of the Quantities of Materials to be Applied. In conjunction with the Engineer the Contractor will decide upon the appropriate rates of asphalt emulsion and fiber for and during the job. Typical rates of application for the asphalt emulsion range from 1.8-2.7L/m2 (0.4-0.6 Gal/SY) and fiber application rates from 30-120g/m2 (approx. 1-4oz/SY). For SAM applications the aggregate shall be of the 6mm, 10mm, or 12mm maximum size and be added at rates as per conventional chip sealing operations – typically (11-13kg/m2 ---approx.19-26lb/SY). For SAMI applications only the 6mm maximum size aggregate is used at typically (6-8kg/m2 --- 10-15lb/SY) to bind in the surface if it is to be overlaid within a few weeks. Otherwise higher aggregate application rates are employed and approved with the local engineer. Preparation of Surface. A self-propelled power broom shall be used to clear any loose material from the surface to be treated immediately prior to the application of the fiber reinforced bituminous membrane surface treatment. Any surface-defects such, as potholes shall be repaired prior to commencement of works. Manhole covers, drop inlets, catch basins, curbs and any structure within the roadway area shall be protected against the fiber reinforced bituminous membrane surface treatment. Method of Measurement Fiber reinforced bituminous membrane surface treatment will be measured by the number of square yards of compacted material in place making no deductions for minor untreated areas such as catch basins and manholes. Basis for Payment The unit price bid per square yard per day, plus the addition of any items the Agency requires the Contractor to furnish. The following items will be performed by the Agency, unless otherwise directed: Manhole covers, water valves, catch basins, and other drainage structures shall be clearly referenced for location and adjustment. Thermoplastic traffic markings shall be removed. All vegetation at the edge of the pavement shall be removed. Compaction with operator. Furnish aggregate delivered to the Chip-Spreader. Furnish Chip-Spreader. Maintenance and Protection of Traffic. Furnish self propelled Power Broom or Vacuum. ASPHALT PRICE ADJUSTMENTS General Asphalt Price Adjustments allowed will be based on the November 1, 2026 average of the F.O.B terminal price per ton of unmodified PG 64-22 binder without anti-stripping agent (base average F.O.B. terminal price). The new monthly average terminal price will be determined by the New York State Department of Transportation based on prices of pre-approved primary sources of performance graded binder in accordance with the New York State Department of Transportation Standard Specification. The November 1, 2026 average is $803.00 per English Ton. Note: The same grade of asphalt cement used in establishing the base average F.O.B. terminal price shall be used in establishing the new average F.O.B. terminal price. In the event that one or more of the New York State Department of Transportation pre-approved sources discontinue posting a price for asphalt cement, the base average F.O.B. terminal price shall not be recalculated. The new average F.O.B. terminal price will be determined based on the above F.O.B. terminal prices posted on the 20th of each month, hereafter known as the “Adjustment Date”, during the contract period starting with February 20th 2027. However, price adjustments, in accordance with the formula below, will be effective for deliveries made on and after the first of the month (i.e. March 1st 2027) following the adjustment date. The unit prices of bituminous materials purchased from any award based on the specification will be subject to adjustment based on the following formula: The price escalation clause for CRS-1p / CRS-2p under the NYSOGS Liquid Bituminous Materials Bid shall apply to Fiber Reinforced Bituminous Membrane Surface Treatment. The price adjustment per gallon shall be multiplied by a factor 0.4 to calculate the price adjustment per square yard. Price Adjustment Per Gallon = New Monthly Average FOB Terminal Price - Base Average Terminal Price X Total Allowable Petroleum X 0.4 235 NEW MONTHLY AVERAGE F.O.B. TERMINAL PRICE: The average F.O.B. terminal price for unmodified PG 64-22 binder without anti-stopping agent as determined by the New York State Department of Transportation Standard Specifications. BASE AVERAGE F.O.B. TERMINAL PRICE: The average F.O.B. terminal price of unmodified PG 64-22 binder without anti-stopping agent has been determined by the New York State Department of Transportation as of November 1, 2026. TOTAL ALLOWABLE PETROLEUM: The percentage of total allowable petroleum for each item is as follows: Material Designation Grade Asphalt % Petroleum Allowance Total Allowable Petroleum % 702-0700 18-60 100 0.2 100.20 702-3001 RS-1 55 1.7 56.70 702-3002 RS-1h 55 1.7 56.70 702-3101 RS-2 63 2.7 65.70 702-3102 HFRS-2 63 2.7 65.70 702-3201 MS-2 65 8.2 73.20 702-3301 HFMS-2 65 8.2 73.2 702-3401 HFMS-2h 65 2.7 67.70 702-3402 HFMS-2s 65 8.2 73.20 702-3501 SS-1 57 0.2 57.20 702.3501 SS-1 (Cold Recycle) 65 0.2 65.20 702-3601 SS-1h 57 0.2 57.20 702.3601 SS-1h (Cold Recycling) 65 0.2 65.20 702-3701 RS-2p 63 2.7 65.70 702-3801 HFRS-2p 63 2.7 65.70 702-4001 CRS-1 60 2.7 62.70 702-4002 CRS-1h 60 2.7 62.70 702-4101 CRS-2 65 2.7 67.70 702-4201 CMS-2 65 10.2 75.20 702-4301 CMS-2h 65 10.2 75.20 702-4401 CSS-1 57 0.2 57.20 702.4401 CSS-1 (Cold Recycling) 65 0.2 65.20 702-4501 CSS-1h 57 0.2 57.20 702.4501 CSS-1h (Cold Recycling) 65 0.2 65.20 702-4601 CQS-1h 62 0.2 62.20 702-4701 CRS-1p 60 2.7 62.70 702-4702 CRS-2p 65 2.7 67.70 702-4801 CQS-1p 62 0.2 62.20 702-90 Diluted Tack Coat 40 0.2 40.20 Asphalt Price adjustments will not be allowed for materials which do not have an asphalt cement base. Example: Item 702-3101 $600 – $638 x 0.657 x 0.4 = -$0.042 / Square yard Base Avg. Price = $638.0 235 New Avg. Price = $600.0 Total Allowable Petroleum = 65.7% Positive Price Adjustment number shall be added to original per gallon Bid Price Negative Price Adjustment number shall be subtracted from original per gallon Bid Price. Work performed after the expiration of the contract, where no extension has been granted, resultant from purchase orders placed prior to expiration of the contract will receive the price adjustments applicable in effect during the last month of the contract. Price adjustments for any contracts that are extended will be based on the new average for the month in which the work is done applying the same base established for that contract. Price adjustments allowed by this contract shall be calculated and applied to the original bid price. There will not be price adjustments unless the change amounts to more than $0.010 per gallon from the original price. In these instances, prices will revert back to the original prices. All Asphalt Price Adjustments will be computed to three decimal places. Should these provisions result in a price structure which becomes unworkable detrimental or injurious to the municipality or in prices which are not truly reflective of market conditions or which are deemed by the municipality to be unreasonable or excessive, and no adjustment in price is mutually agreeable, the municipality reserves the sole right upon ten days written notice mailed to the contractor to terminate any contract resulting from this bid opening. Price adjustment shall be published by the State and issued to all contract holders, whose responsibility will be to attach the appropriate state notif Notice Notice to Contractors (Physical Responses Only) Notice is hereby given that the County of Wayne is conducting a Request for Bids for Fiber Reinforced Bituminous Membrane Surface Treatment Sealed responses may be submitted physically or by mail in a sealed envelope clearly identified and filed with the Superintendent of Public Works, 7227 Route 31, Lyons, New York 14489, 26 Church Street, Lyons, New York 14489, on or before 1:00 pm prevailing time on Thursday, January 7, 2027 An electronic copy of proposal forms, specifications, and plans can be obtained from the County’s eProcurement Portal: https://procurement.opengov.com/portal/co-wayne-ny-us or by requesting them directly from the Purchasing Department Office located at 16 William Street, Lyons, NY by email request to purchasing@co.wayne.ny.us (Telephone: 315-946-7675) The County of Wayne (hereinafter “County”) shall not be held responsible for the completeness or accuracy of any proposal documents received by a contractor that was not directly issued to that contractor by the Purchasing Department. Any contractor submitting a proposal based on incomplete or inaccurate information resulting from documentation received from any third party shall not have cause for relief from award or completion of a contract in accordance with the official documents on file with the Clerk of the Board of Supervisors. It is HIGHLY suggested that all contractors interested in participating in this proposal contact the Purchasing Department directly at the above address or telephone numbe Source: OpenGov https://procurement.opengov.com/portal/co-wayne-ny-us/projects/326594 Canonical URL: https://govcontractfinder.com/contracts/fiber-reinforced-bituminous-membrane-surface-treatment-opengov-1899614489-project-326594