FIRE PROTECTION SYSTEMS INSPECTIONS State and local opportunity open METRO Regional Transit Authority 2026-17 Posted: 2026-11-05T12:00:01.410Z Response deadline: 2026-12-17T21:00:00.000Z Metro Regional Transit Authority is seeking quotes for inspections of all of our Fire Protection Systems. In addition, the vendor will be required to recharge all fire extinguishers on an “as needed basis”. Scope of Work FIRE PROTECTION SYSTEMS INSPECTIONS Metro Regional Transit Authority is seeking quotes for inspections of all of our Fire Protection Systems. We currently have five (5) locations that need inspections performed. Below are the locations, addresses and the items at each facility that will all be covered under this agreement. Main Office-416 Kenmore Blvd., Akron, OH 5 each Annual Wet Sprinkler Inspections 2 each Annual Dry Sprinkler Inspections 5 each Annual Back-flow Prevention Inspections (Open) 1 each Annual Back-flow Prevention Inspections (Confined space) 1 each Semi-Annual Halon Systems Inspections 17 Each Annual Pull Station Inspections 325 each Annual Fire Extinguisher Inspections Robert K. Pfaff Transit Center-631 S. Broadway, Akron, OH 1 each Annual Wet Sprinkler Inspection 2 each Annual Back-flow prevention Inspections (Open) 1 each Annual Back-flow Prevention Inspection (Confined space) 16 each Annual Fire Extinguisher Inspections (Does not include recharges or maintenance) 8 each Annual Pull Station Inspections Romig Road Transit Center-2340 Romig Road, Akron, OH 1 each Annual Back-flow Prevention Inspection (Open) 1 each Annual Fire Extinguisher Inspection (Does not include recharges or maintenance) 3 each Annual Pull Station Inspections Independence Transit Center -1280 Independence Ave., Akron, OH 1 each Annual Back-flow Prevention Inspection (Open) 1 each Annual Back-flow Prevention Inspection (Confined Space) 1 each Annual Wet Sprinkler Inspection 3 each Annual Fire Extinguisher Inspection (Does not include recharges of maintenance) Maintenance and Operation Facility - 348 Kenmore Blvd., Akron, OH See Attached Building Drawings for Detailed Specs. In addition to the above inspections, the vendor will be required to recharge all fire extinguishers on an “as needed basis”. METRO has five (5) lb. and ten (10) lb. size extinguishers located on buses as well as around all five (5) properties. The pricing should include all labor, labels, collars, O-rings, pins and any other items needed to maintain and recharge the extinguishers. Legal Notice 416 Kenmore Boulevard Akron, Ohio 44301-1099 (330) 762-7267 (330) 762-0854 FAX LEGAL NOTICE Notice is hereby given that METRO Regional Transit Authority (METRO) is requesting bids for: FIRE PROTECTION SYSTEMS INSPECTIONS Detailed specifications are available by visiting https://procurement.opengov.com/portal/akronmetro . Any questions should be submitted through the Question & Answer section of the project (IFB # 2026-17 ) on METRO's OpenGov Portal. All bids must be submitted in accordance with requirements set forth in this bid solicitation, and must be received within METRO's OpenGov portal before 4:00 pm on Thursday, December 17, 2026 . Results will be available online shortly after the submission deadline, If interested public opening will be held at METRO 416 Kenmore Blvd. Akron, Ohio 44301 . In connection with the carrying out of this project, the Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, age, national origin, or handicap. All Offerors are certifying that they are not debarred or suspended by the Federal Government by signing the bid page. METRO reserves the right to reject any and/or all bids, to re-advertise for bids and to waive any informality in any bid and to determine the most responsive bid by its own criteria, as described within the specification. METRO further advises prospective Offerors that all bids must be filed on the forms provided by the Authority, all required information in the Vendor Questionnaire section of this posting on OpenGov must be completed, and that all bids must be in response to IFB# 2026-17 . Akron Beacon Journal Dawn Distler Chief Executive Officer/Secretary-Treasurer November 05, 2026 and November 12, 2026 Introduction Summary Background Contact Information Timeline General Information Terminology “Bid” or “Proposal” refers to the document drafted and submitted by the Proposer(s)/Bidder(s) in response to the Information for Bids. “Bidder” or “Proposer” refers to the entity submitting the Bid or Proposal. “Akron Metro Regional Transit Authority” (also referred to as “Akron Metro”, “Metro”, “Authority”, “Contractor”, “Buyer” or “Purchaser”) is the government entity who is soliciting proposals and bids with the RFP and/or IFB. “Request for Proposals “or “Information for Bids” refers to the document prepared by the Contractor/Buyer/Purchaser which outlines the scope of work of the Contractor’s project and is used to solicit for bids for the project. Bid Submission Bidders shall submit through METRO's OpenGov portal and no submittals will be recognized if they are not received through OpenGov. Scans or photocopies of all required certifications and attestations are acceptable at the time of bid but originals shall be requested if necessary and provided to METRO upon request. Oversize pages used for drawings or similar purposes are allowed. Bids must set forth full, accurate, and complete information as required by the IFB. Each bid response, complete with affidavits and certifications and all required attachments, shall be submitted through the OpenGov portal. All bids are due BEFORE 4:00 pm on Thursday, December 17, 2026 . Bids received by Akron Metro after that date and time will not be opened or considered. Bid Requirements Bids shall be prepared in a clear, concise, and economical manner. Bids should be organized in a simple and straightforward manner. Price page(s) should be submitted either within their own identified section or as a separate file upload following any requirements noted in the Vendor Questionnaire. There is no page limitation or minimum document size, but any information the Bidder submits is expected to be concise and relevant to the IFB. Bids that do not adhere to the required format, are difficult to read or are deemed illegible by Akron Metro and may be rejected. Bids shall contain the following items and follow the exact sequence outlined below: IFB Cover Page, providing the following information: Identification of the Bidder(s), including name, address, and phone number of the appropriate contact person at each firm. Signature of a person authorized to bind the proposing firm to the terms of the Bid. Bidder Experience (including a brief narrative on capabilities as specifically related to this project) Postponement or Cancellation of Information for Bids Akron Metro RTA reserves the right to cancel, amend, or re-issue this IFB at any time, or change the date and time for submitting bids, by announcing same prior to the date and time established for Bid submittal. Examination of IFB and Contract Documents Bidders are expected to examine the scope of services required, schedules, instructions, and specifications, if any. Failure to do so will be at the Bidder's risk. It is the intent of these specifications to provide services of first quality, and the workmanship must be the best obtainable in the various trades. The services, which the vendor proposes to furnish, must be high quality in all respects. No advantage will be taken by Contractor or vendor in the omission of any part or detail, which goes to make the services complete. All manner of workmanship and material used in the production of the services and not herein contained or specified shall be of the industry standard and shall conform to the best practices known in the industry. Contractor will assume responsibility for all equipment used in the proposed item, whether the same is manufactured by Contractor or purchased ready made from a source outside Contractor's company. It is the sole responsibility of Contractor to read the specifications and understand them. The submission of a Bid shall constitute an acknowledgment upon which Akron Metro RTA may rely that the Bidder has thoroughly examined and is familiar with the solicitation, including any work site identified in the IFB, and has reviewed and inspected all applicable statutes, regulations, ordinances, and resolutions addressing or relating to the goods and services to be provided hereunder. The failure or neglect of a Bidder to receive or examine such documents, work sites, statutes, regulations, ordinances, or resolutions shall in no way relieve the Bidder from any obligations with respect to its Bid or to any Contract awarded pursuant to this IFB. No claim for additional compensation will be allowed which is based on lack of knowledge or misunderstanding of this IFB, work sites, statutes, regulations, ordinances, or resolutions. Bid Information Legal Advertisement for Bids Advertisement for bids for FIRE PROTECTION SYSTEMS INSPECTIONS 2026-17 by the METRO Regional Transit Authority (METRO) appeared in the Akron Beacon Journal on November 05, 2026 and November 12, 2026 , and will posted on our website on Thursday, November 5, 2026 . Duration of Contract Duration of the proposed contract shall be for one (1) year with four(4) optional years to start date of contract/ agreement signing. Bid Sealed bids for the above will be received online at METRO's OpenGov portal, all bids are due before 4:00 pm on Thursday, December 17, 2026 , and thereafter will be publicly available online. Amendments No responses will be issued for requests for clarification or amendments ten (10) calendar days or less before the bid due date. If you find ambiguity in the contract it must be brought up prior to bid closing date. Bid Bond FTA may accept the bonding policy and requirements of the recipient, provided that they meet the minimum requirements for construction contracts as follows: A bid guarantee from each bidder equivalent to five (5) percent of the bid price. The "bid guarantees" shall consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified. A performance bond on the part to the Contractor for 100 percent of the contract price. A "performance bond" is one executed in connection with a contract to secure fulfillment of all the contractor's obligations under such contract. A payment bond on the part of the contractor for 100 percent of the contract price. A "payment bond" is one executed in connection with a contract to assure payment, as required by law, of all persons supplying labor and material in the execution of the work provided for in the contract. Payment bond amounts required from Contractors are as follows: 50% of the contract price if the contract price is not more than $1 million; 40% of the contract price if the contract price is more than $1 million but not more than $5 million; or $2.5 million if the contract price is more than $5 million. A cash deposit, certified check or other negotiable instrument may be accepted by a grantee in lieu of performance and payment bonds, provided the grantee has established a procedure to assure that the interest of FTA is adequately protected. An irrevocable letter of credit would also satisfy the requirement for a bond. Bid Bond Requirements (construction) Bid Security - A Bid Bond must be issued by a fully qualified surety company acceptable to (Recipient) and listed as a company currently authorized under 31 CFR, Part 223 as possessing a Certificate of Authority as described thereunder. Rights Reserved - In submitting this Bid, it is understood and agreed by bidder that the right is reserved by (Recipient) to reject any and all bids, or part of any bid, and it is agreed that the Bid may not be withdrawn for a period of ninety (90) days subsequent to the opening of bids, without the written consent of (Recipient). It is also understood and agreed that if the undersigned bidder should withdraw any part or all of his bid within ninety (90) days after the bid opening without the written consent of (Recipient), shall refuse or be unable to enter into this Contract, as provided above, or refuse or be unable to furnish adequate and acceptable Performance Bonds and Labor and Material Payments Bonds, as provided above, or refuse or be unable to furnish adequate and acceptable insurance, as provided above, he shall forfeit his bid security to the extent of (Recipient's) damages occasioned by such withdrawal, or refusal, or inability to enter into an agreement, or provide adequate security therefor. It is further understood and agreed that to the extent the defaulting bidder's Bid Bond, Certified Check, Cashier's Check, Treasurer's Check, and/or Official Bank Check (excluding any income generated thereby) which has been retained by (Recipient) shall prove inadequate to fully recompense (Recipient) for the damages occasioned by default, then the undersigned bidder agrees to indemnify (Recipient) and pay over to (Recipient) the difference between the bid security and (Recipient's) total damages, so as to make (Recipient) whole. The undersigned understands that any material alteration of any of the above or any of the material contained on this form, other than that requested, will render the bid unresponsive. Performance and Payment Bonding Requirements (Construction) The Contractor shall be required to obtain performance and payment bonds as follows: Performance bonds The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient) determines that a lesser amount would be adequate for the protection of the (Recipient). The (Recipient) may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond. Payment bonds The penal amount of the payment bonds shall equal: Fifty percent of the contract price if the contract price is not more than $1 million. Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or Two and one half million if the contract price is more than $5 million. If the original contract price is $5 million or less, the (Recipient) may require additional protection as required by subparagraph 1 if the contract price is increased. Performance and Payment Bonding Requirements (Non-Construction) The Contractor may be required to obtain performance and payment bonds when necessary to protect the (Recipient's) interest. The following situations may warrant a performance bond: (Recipient) property or funds are to be provided to the contractor for use in performing the contract or as partial compensation (as in retention of salvaged material). A contractor sells assets to or merges with another concern, and the (Recipient), after recognizing the latter concern as the successor in interest, desires assurance that it is financially capable. Substantial progress payments are made before delivery of end items starts. Contracts are for dismantling, demolition, or removal of improvements. When it is determined that a performance bond is required, the Contractor shall be required to obtain performance bonds as follows: The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient) determines that a lesser amount would be adequate for the protect Disposition of Certified or Cashiers Check Said certified or cashiers check to be forfeited to METRO as agreed amount of liquidated damages in case of failure to enter into a contract as above described. The check will be released or returned to the bidder in the case his bid is rejected. In case the bid is accepted, the check will be returned after the contract has been signed. The check of the next lowest bidder will be retained until the lowest responsible bidder has signed. If he fails to do so, said check shall be further retained until the second lowest responsible bidder shall have signed; and in default hereof, the check shall be forfeited to METRO as liquidated damages. Form of Bid Every bid must be made within METRO's OpenGov portal and must contain the full name of every person, firm, or corporation interested in the bid, and the address of the person, firm, or the president and secretary of the corporation bidding; and if a corporation, the name of the State in which it is incorporated. Name of Bidder Each bid must contain a page that is clearly signed with the full name and address of each person interested in it. In case of a partnership, the firm name and address of each individual party must be given. Signature of Bidder Firm, corporate, or individual name of the bidder must be signed by the bidder in the space provided for the signature on the bid blank. In case of a corporation, the title of the officer signing must be stated and each officer must be thereunto duly authorized. In the case of a partnership, the signature of at least one of the partners must follow the firm name, using the term "member of firm." In case of an individual, use the term "doing business as" or "sole owner." Bidder Affidavits Bidder is required to submit with his bid an affidavit stating that neither he nor his agents, nor any other party for him has paid or agreed to pay, directly or indirectly, any persons, firm, or corporation any money or valuable consideration for assistance in procuring or attempting to procure the contract herein referred to and further agreeing that no such money or reward will be hereafter paid. This affidavit must be on the form attached hereto and made part of this bid. Each bidder, who is a foreign corporation, i.e., a corporation not chartered in Ohio, but licensed to do business in Ohio, is required to submit with his bid an affidavit duly executed by the President or Executive Director of the corporation, stating in said affidavit that said foreign corporation had, in accordance with the provisions of the Revised Code of the State of Ohio, obtained a certificate authorizing it to do business in the State of Ohio. The certificates, or certified copies of same, are obtainable from the Office of the Secretary of State, Columbus, Ohio. Specifications to be Part of the Contract Specifications, statements, and the bid, which accompany the bids, which are accepted therewith, and which do not conflict with the provisions herein contained, shall be part of any contract that is entered into. Explanations (Written and/or Oral) Should a bidder find a discrepancy in or omissions from these specifications, or should there be any doubt as to their meaning, bidder shall at once make inquiry to the Director of Finance. Withdrawal of Bid A submitted bid may be withdrawn prior to the deadline for submission by clicking the "unsubmit" button. Once the bid is unsubmitted/withdrawn, METRO has no response from the bidder. Any resubmission must be resubmitted prior to the bid submission deadline. If a bidder wishes to withdraw their bid after the submission deadline, but prior to award of the contract, they should contact METRO’s Procurement Officer immediately. Consideration of Bid All bids received in conformity with these specifications shall, as soon as possible be tabulated. Rejection of Acceptance of Bids The Executive Director reserves the right to accept or reject any or all bids, and any parts of any bid. In awarding a contract, the Executive Director reserves the right to consider all elements enter Source: OpenGov https://procurement.opengov.com/portal/akronmetro/projects/322976 Canonical URL: https://govcontractfinder.com/contracts/fire-protection-systems-inspections-opengov-913111-project-322976