FY 2027 Asphalt Resurfacing Program State and local opportunity closed Boone County BCFY27-17 Posted: 2026-10-20T15:00:19.501Z Response deadline: 2026-11-10T19:30:00.000Z The Boone County Fiscal Court will receive bids from qualified vendors to perform the services associated with the Resurfacing (Milling and Paving) of County Roads and Streets as identified in the attached street listing. Work shall include all labor, equipment, materials and services necessary to complete the work described in this Invitation to Bid. Only contractors prequalified by the Kentucky Transportation Cabinet (KYTC) are eligible to submit a bid for this project. A bid bond executed by the Bidder and acceptable sureties in equal amount to five (5) percent of the bid (including Add Alternates) shall be submitted (electronically) with each bid. The bidder to whom the contract is awarded will be required to furnish a surety bond in an amount equal to one hundred percent (100%) of the contract amount. Bid security furnished in bond form shall be issued by a surety company or corporation licensed in the state of Kentucky to provide said surety. 2027 Resurfacing Class 2 Asphalt Surface 0.38D PG64-22*, installed and compacted; including road preparation (weed burning / crack cleaning as necessary), cutting edge keys, raising utilities, trackless tack coat (NTSS-1HM or equivalent), hauling, flagging, foremen & paving crew. Durable pavement edge on non-curb & gutter streets. Contractor shall crack seal all edge joints between concrete curbs and asphalt paving with joint sealer compound. Mill Existing Asphalt Pavement, Concrete Pavement or Asphalt over Concrete, Minimum Six (6) Feet in Width from Gutter Line See Additional Specifications for Milling. All millings retained by contractor. 4 Inch reflective striping (White Edge Line) per KYTC Specification 713. 4 Inch reflective striping (Double Yellow Centerline) per KYTC Specification 713. 24 Inch reflective thermoplastic stop bar (White) per KYTC Specification 714. [Locations to be determined] Edge Key to include all labor, equipment, and materials to prepare existing pavement edges abutting new resurfaced sections in accordance with KYTC Edge Key specifications. This line item applies to locations marked on the Summer 2027 Resurfacing List attachment as 'Various Locations' on the pricing sheet. Mobilization. In accordance with KYTC Standard Specification Section 110.04 - PAYMENT. Demobilization. In accordance with KYTC Standard Specification Section 110.02 - DEMOBILIZATION. Bid an amount for Demobilization that is a minimum of $1,000 and is a minimum of 1.5 percent of the sum of the total amounts bid for all other items in the Bid Proposal, excluding Mobilization, Demobilization, and contingent amounts established for adjustments and incentives. Jail Work Camp Parking Lot Paving Edge Key Asphalt Material for Tack CL2 ASPH SURF 0.38D PG 64-22 (1.5") Pavement Striping – Permanent Paint – 4" White Leveling and Wedging PG 64-22 Base Failure Repair Specifications IMPORTANT INSTRUCTIONS TO BIDDERS 1. Definitions: The current edition of the KYTC Standard Specifications for Road and Bridge Construction is incorporated by reference into this Contract per Section V, General Specifications, Item A. Unless the context clearly requires otherwise, the following terms carry the meanings assigned below wherever they appear in the incorporated KYTC Standard Specifications, standard drawings, or special notes, for purposes of this Contract: Department or Department of Highways: means Boone County, acting through its authorized representative, except where the context requires reference to the Kentucky Department of Highways itself, such as provisions addressing KYTC material acceptance testing or interpretation of the Standard Specifications. Commissioner: means the Boone County Judge/Executive or their designee, for any authority under the incorporated KYTC Standard Specifications requiring action by the Commissioner, except where the context requires reference to the Cabinet's Commissioner of Highways. Cabinet: retains the meaning assigned in KYTC Standard Specifications Section 101 (the Kentucky Transportation Cabinet), without substitution, for purposes of contractor prequalification, funding compliance, and any provision where the Cabinet's independent role is required under the funding agreement between the County and the Cabinet. Engineer: means the County's authorized representative charged with engineering supervision of the Contract, for any authority, approval, direction, or determination assigned to the Engineer under the incorporated KYTC Standard Specifications. Owner: means Boone County. Where this Contract or the incorporated KYTC Standard Specifications refer to "Owner," "County," or "Department" interchangeably, all such terms mean Boone County acting through its authorized representative(s) as identified herein. This section governs solely for purposes of interpreting terms drawn from the incorporated KYTC Standard Specifications. It does not expand or diminish any authority otherwise assigned within this Contract's General Conditions, Specific Conditions, or the Boone County Administrative Code. 2. Prices: All prices contained herein will be firm and fixed until project completion. 2a. Add Alternates: In an effort to utilize the available fiscal year budget while maximizing the quantity of work awarded, Add Alternates may be selected, in addition to the base bid, by Owner and awarded as part of the contract. 3. Award: The award will be made to the lowest responsive, responsible bidder. In the comparison of Bids, Add Alternates will be applied in the same order of priority as listed in the Bid Form. For comparison purposes, Add Alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the lowest responsive Bidder, based on this comparative process, the award may be made to said Successful Bidder on its base Bid and any combination of its Add Alternates for which Boone County determines funds will be available at the time of award. 4. Termination for Default : The contract may be terminated by the County Administrator or designee in whole or in part by written notice of default to the contractor upon non-performance or violation of a contract’s terms or conditions. An award may be made to the next low bidder, or services specified may be purchased on the open market similar to those so terminated. In either event, the defaulting contractor (or the defaulting contractor's surety) shall be liable to the County for costs to the County in excess of the defaulter contract price. Failure of the contractor to deliver the specified services within the time stipulated on the contractor's bid, unless extended in writing by the Assistant County Administrator, shall constitute contract default. 5. Boone County Occupational License: The successful bidder may be required to obtain a Boone County Occupational License. If required and bidder fails to obtain, it may result in termination of the contract. 6. Bid Guarantee: A bid bond executed by the Bidder and acceptable sureties in equal amount to five (5) percent of the bid shall be submitted (electronically) with each bid. The bidder to whom the contract is awarded will be required to furnish a surety bond in an amount equal to one hundred percent (100%) of the contract amount. Bid security furnished in bond form shall be issued by a surety company or corporation licensed in the state of Kentucky to provide said surety. 7. Failure to Complete on time . For each calendar day that the Contractor fails to complete the work after the final completion date, the County will deduct $2500/day from any money due the Contractor; not as a penalty, but as agreed liquidated damages. The County will deduct daily charges as agreed liquidated damages for each calendar day without regard to inclement weather or the temperature limitations in the Contract, except that the County will not deduct liquidated damages when the specified seasonal or temperature limitations prohibit the Contractor from performing work. Because the prosecution of work in connection with the construction of road projects will inconvenience the public, obstruct traffic, and interfere with business, complete the work as quickly as practical. Also, the County’s costs for the administration of the Contract, including inspection, engineering, supervision, and maintaining detours, increases with the time that the Contractor takes to execute the work. When the County allows the Contractor to continue and to finish the project beyond the Contract time, such permission does not operate as a waiver by the County of any of its rights under the Contract. 8. Utility Clearance. The contractor is advised that the Underground Facility Damage Protection Act of 1994, became law January 1, 1995. It is the contractor’s responsibility to determine the impact of the act regarding GENERAL SPECIFICATIONS The current edition of the KYTC Standard Specifications are incorporated by reference and will serve as the standard specifications governing this project. Contractor shall be responsible for necessary signage and traffic control per the Manual on Uniform Traffic Control Devices (MUTCD) current edition. Furnish new, or used in like new condition, traffic control devices at the beginning of the work and maintain in like new condition until completion of the work. Do not leave lane closures in place during non-working hours. The County may specify days and hours when lane closures will not be allowed. Maintain alternating one-way traffic during construction. If traffic should be stopped due to construction operations, and a school bus on an official run arrives on the scene, make provisions for the passage of the bus as quickly as possible. Contractor shall notify the County two (2) weeks prior to beginning construction operations. Ideally, sidewalk and curb construction would be completed prior to milling and paving; however, sidewalks and curbs may be completed after paving provided appropriate care is taken and sealing of saw-cuts is performed at the contractor’s expense. Begin paving operations within 120 hours of commencement of the milling operations. Continue paving operations continuously until all milled areas are completed. Take possession of the millings and recycle the millings or dispose of the millings off of the Right-of-Way at sites obtained by the Contractor at no additional cost to the County. Be advised, there may be an active project(s) adjacent to or within this project. The County will coordinate the work of the contractors. The County’s estimated quantities appear in the bid schedule only for the purpose of comparing the bid submissions. The County will pay the contractor only for the actual quantities of work performed and accepted or materials furnished according to the contract. The County may increase, decrease, or omit the estimated quantities of work and materials furnished. Asphalt and Fuel Adjustments will be conducted according to section 109.07 of the 2019 Kentucky Standard Specifications for Road and Bridge Construction. For Road Paving List, see Attachment. For any paving section without curb, wedge edge of pavement as required by section 403 of the 2019 Kentucky Standard Specifications for Road and Bridge Construction and as indicated on The Durable Pavement Edge Detail. Pavement Marking work shall be performed according to the applicable sections 713 and 714 of the 2019 Kentucky Standard Specifications for Road and Bridge Construction. Special Note for Non-Tracking Tack, See Attachment. All work will be inspected by Boone County officials to assure compliance with technical specifications including but not limited to temperature, mix design, compaction, thickness, and ride quality. Progress Schedule. Per KYTC Standard Specifications Section 108.02, the Contractor shall submit a Written Narrative schedule to the Engineer prior to beginning work and, if directed by the Engineer, a baseline Activity Bar Chart or Critical Path Method schedule within 30 days of Notice to Proceed. The initial schedule shall be consistent with the Contract Time or Final Completion date stated in this Contract. Failure to submit, update, or maintain the progress schedule as required constitutes a violation of this Specification, voids the Contractor’s right to delay claims under Section 108.02, and may result in withheld progress payments. TECHNICAL SPECIFICATIONS FOR ASPHALT PAVING/MILLING Description/Scope of work: This work shall consist of improving the profile and cross section on the attached list of streets. The streets are constructed of either concrete, asphalt, or concrete overlaid with asphalt. The Contractor's scope of work shall include all labor, materials, equipment and incidentals to complete the paving and milling operation including but not limited to: All flagmen, trucking, disposal of the cuttings and cleaning of the milled surface. Adjusting any structures within the paving area including manholes, drainage structures and valve boxes. Any temporary traffic control devices or pavement markings (per current MUTCD). The contractor shall be responsible to obey structure weight limits and preserve integrity of all structures. Railroad coordination may be required. Paving/Milling Specifications: Unless otherwise noted, the County estimates the rate of application for all asphalt mixtures to be 110 lbs/sy per inch of depth. Be advised that the County will control and accept asphalt mixtures furnished on this project under Division 400 of the Kentucky Department of Highway’s Current Version Standard Specifications for Road and Bridge Construction (including Supplemental Specifications Effective with May 26, 2022 Letting). Compaction shall be accepted under Option B. Contrary to Division 400, Asphalt Tack shall be Non-Tracking according to the attached special note and all labor, equipment and materials required for application of the tack will be incidental to the cost of the surfacing material. Avoid cold longitudinal joints when practical by either placing the full width of the course in one pass or moving pavers back each day after placing sufficient tonnage in each traffic lane so the course placed will be the full width of the pavement at the end of each day. Obtain the County’s approval for the method of paving. Wedge all transverse transitions between resurfaced and un-resurfaced areas which traffic may cross with asphalt mixture. Remove the wedges prior to placement of the final surface course. Milling Specifications: Streets with a "Mill @ Curb" Rehabilitation listed shall be milled at a width of 6 feet along each curb line, to the depth listed on the paving list at the curb and ¼" at the nearest edge to the centerline. Streets with a "FW Mill" shall be milled to the depth listed on the paving list for the full width of the street. Be advised that the County will control and accept Asphalt Pavement Milling and Texturing on this project under Section 408 of the Kentucky Department of Highway’s Current Version Standard Specifications for Road and Bridge Construction (including Supplemental Specifications Effective with May 26, 2022 Letting). Bidders shall be aware that additional milling may be necessary for drainage purposes and for smooth transitions with utilities. Bidders shall be aware that pavements to be milled may consist of concrete, asphalt or composite pavements. Some pavements may contain geotextile reinforcements below the surface layer. For rural roads with no curbs and limited shoulder width, the outer edge shall be taper milled to the depth of the asphalt overlay (e.g., 2 inches) at the shoulder and tapered back to the road centerline to avoid adverse drop-off and excessive crowning. The contractor shall take possession of the millings and recycle the millings or dispose of the millings off of the Right-of-Way at sites obtained by the Contractor at no additional cost to the County. Workmanship: The workmanship and finished surface shall meet the specifications of current Kentucky Department of Highways Standard Specifications for Road and Bridge Construction. Introduction Summary Background Contact Information Timeline Notice for Bidders Bid Submittal Instructions The Boone County Fiscal Court will receive sealed bids electronically via the County's electronic bidding system only until 2:30 pm (local time), Tuesday, November 10, 2026 from qualified vendors to perform the services associated with FY 2027 Asphalt Resurfacing Program Bids must be submitted electronically. Late, hand delivered (paper), emailed or facsimile bids will not be accepted. Bids will be opened online at the time listed above. Solicitation Documents Specifications may be downloaded electronically by visiting our electronic bidding website . Boone County reserves the right to reject any and all bids, to waive any informalities and to negotiate for the modifications of any bid or to accept that bid which is deemed the most desirable and advantageous from the standpoint of customer value and service and concept of operations, even though such bid may not, on its face, appear to be the lowest and best price. No bid may be withdrawn for a period of sixty (60) days after scheduled time of receipt of bids. The Boone County Fiscal Court is an Equal Opportunity Employer. WBE/MBE firms are encouraged to respond to this Invitation to Bid. General Conditions and Instructions It is necessary for bidders to read instructions contained herein, to understand exactly how to submit a bid, what must accompany the bid, and what the bidder obligates themselves for by submitting the bid. Failure to carefully read and understand the instruction and bid specifications may either cause the bid not to be considered or accepted by the Boone County Fiscal Court, hereinafter referred to as “County,” or cause the bidder to obligate themselves to more than they realize. All bids shall be submitted on and in accordance with this solicitation in the procurement portal. In case of conflict, the bid may be deemed non-responsive. The County’s published specifications shall supersede any additional writings submitted with the bid. Such writings should be clearly marked and noted in the "Deviations and Exceptions" section. In the event a Bidder is unable to submit a timely response in accordance with the instructions herein due to the Bidder's internet or hardware limitations, settings or restrictions, internet speed, power outage, network connection, or use of a malfunctioning electronic device, neither the County, nor the Software Administrator, will be held responsible. Bidders shall be solely responsible for ensuring the capability of their computer system while responding to this solicitation, and for the stability of their internet service. Uploading large documents may take significant time depending on the size of the file(s) and Bidder's internet connection speed. Failure of the Bidder to successfully submit an electronic Bid before the deadline indicated herein shall be at the Bidder's sole risk, and no relief will be given for late and/or improperly submitted Bids. If County is closed for business at the time scheduled for bid opening, for whatever reason, bids will be opened on the next business day of the County, at the originally scheduled hour. Each bid is submitted with the understanding that the acceptance in writing by the County of the bid to furnish any or all of the goods and/or services described therein, shall constitute a contract between the bidder and the County, which shall bind the bidder on their part to furnish and deliver the goods and/or services quoted at the prices stated and in accordance with the conditions of the accepted bid. Once accepted, the County is obligated on its part to order from such bidder, except for causes beyond reasonable control and pay for, at the agreed prices, all goods and/ Source: OpenGov https://procurement.opengov.com/portal/boonecountyky/projects/247348 Canonical URL: https://govcontractfinder.com/contracts/fy-2027-asphalt-resurfacing-program-opengov-85910-project-247348