FY2027 Local Roads Resurfacing State and local opportunity open City of Cape Coral, FL 2027-ITB-PW-004-MR Posted: 2026-11-18T12:30:01.664Z Response deadline: 2026-12-22T19:00:00.000Z The City of Cape Coral was incorporated in 1970 and operates under the Council/City Manager form of government. The City Council has eight members consisting of the mayor and seven members all elected at large on a nonpartisan basis. City Council is responsible for all policy-making functions of the government and retains the services of a City Attorney, City Auditor and City Manager. The City Manager is responsible for all administration of the City, which provides a comprehensive range of municipal services including general government, public safety, community services, public works, planning, utilities, and parks and recreation. Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. Scope of Work and Technical Specifications SCOPE OF WORK The Contractor shall furnish all labor, materials, equipment, supervision, transportation, tools, permits, and operations necessary to complete the selected structural repairs and resurfacing of local roadways at various locations throughout the City of Cape Coral, as shown in Exhibit D, Map of Project Area. In addition to the work otherwise required by the Contract Documents, asphalt concrete paving operations may include, but are not limited to, the following: Maintenance of Traffic (MOT). Notification and coordination with public safety departments, affected residents, businesses, and the City’s Communications Department when work within the right-of-way may require emergency-vehicle detours or interrupt normal daily activities. Door-hanger notifications shall be provided when required by the City. Clipping, herbicide application, and brooming necessary for paving preparation. Removal of material from the pavement edge to establish a uniform pavement edge and provide positive drainage from the roadway surface to the adjacent swale drainage system. Milling of existing roadway surfaces. Leveling and grading of existing roadway surfaces. Adjustment, repair, or replacement of existing utility structures and appurtenances, as required by the Contract Documents. Delivery and hauling of materials to and from the Project site. Application of approved prime and tack coats. Roadway structural repairs. Placement of Superpave Type SP-9.5 asphalt overlay. Replacement of existing pavement striping, markings, and raised pavement markers (RPMs). Street sweeping, final cleanup, and repair of damage caused by Contract operations. Sod replacement and restoration of disturbed areas. Sections 6.30, Pursuit of Work , and 6.36, Mandatory Pre-Construction Meeting , contain material scheduling requirements and shall be reviewed carefully. The City will enforce the schedule requirements established in the Contract Documents. The Contractor shall prosecute the Work expeditiously and in accordance with the approved project schedule. The Contractor shall submit all project closeout documentation within 30 calendar days after completion of final striping, unless an earlier deadline is established elsewhere in the Contract Documents. No monthly asphalt-price adjustment or fuel-price adjustment allowance will apply to this Project. The City may elect to retain some or all millings generated by the Project. The Contractor shall coordinate the handling, hauling, and delivery of millings with City staff in accordance with Section 6.11, Milling. TECHNICAL SPECIFICATIONS The Local Road Resurfacing Program may consist of all or part of the work described below 6.3 through 6.39. The Contractor shall perform all work necessary to complete the Project in accordance with the Contract Documents. FIELD CHANGE REQUESTS The Project Manager may authorize field changes that do not affect the Contract Price, Contract Time, project limits, design intent, safety requirements, or the basis of payment for any bid item. The Project Manager’s written authorization and the Contractor’s written acknowledgment are required within 24 hours after issuance of the field direction. Email is an acceptable form of written communication. No field direction may authorize extra work, delete paid work, modify the basis of payment, or change Contract Time unless approved through a written change order executed in accordance with the Contract Documents. The Contractor shall promptly notify the Project Manager in writing of any condition believed to affect Contract Price or Contract Time before proceeding with the affected work, except when immediate action is necessary to protect life, safety, or property. ADOPTED SPECIFICATIONS The Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction, current edition in effect on the bid-opening date, are hereby adopted as the technical specifications for resurfacing and construction, except as modified by these Contract Documents. English units and pay items shall be used. Superpave asphalt mixtures shall be used. If FDOT contract procedures conflict with the City of Cape Coral’s contract procedures, the City of Cape Coral’s procedures shall govern. Unless otherwise shown on the plans, required by the Contract Documents, or directed in writing by the Project Manager or Engineer, all workmanship and materials shall comply with the following: These Technical Specifications. The applicable FDOT Standard Specifications and Standard Plans. The Manual on Uniform Traffic Control Devices (MUTCD). The City of Cape Coral Engineering and Design Standards. Applicable manufacturer requirements and approved product-list requirements. Where requirements conflict, the more stringent requirement shall apply unless the Project Manager provides written direction otherwise. AUTHORITY AND DUTIES OF THE PROJECT MANAGER'S REPRESENTATIVES AND INSPECTORS The City’s Project Manager may appoint representatives, inspectors, and other personnel as necessary to inspect the Work and materials furnished under the Contract. Authorized representatives and inspectors may inspect all or part of the Work, including the manufacture, preparation, fabrication, delivery, placement, and installation of materials. They may notify the Contractor of work or materials that do not comply with the Contract Documents and may reject nonconforming materials or suspend affected work until the matter is referred to and decided by the Project Manager. The Project Manager shall promptly notify the Contractor in writing of any suspension of work, stating the reasons for the suspension. Email is an acceptable form of written notice. The Project Manager’s representatives and inspectors are not authorized to modify Contract Price, Contract Time, plans, specifications, quantities, or other Contract requirements unless specifically authorized in writing by the Project Manager through the Contract change procedure. The presence, absence, inspection, or approval of any inspector or representative does not relieve the Contractor of responsibility for complying with the Contract Documents. GENERAL INSPECTION REQUIREMENTS Cooperation by Contractor The Contractor shall provide the Project Manager and authorized representatives reasonable access, assistance, and facilities necessary to determine whether the Work and materials comply with the Contract Documents. The Contractor shall provide at least 24 hours’ notice before beginning work that requires inspection, unless otherwise directed by the Project Manager. The Contractor shall not cover or conceal work designated for inspection until authorized to proceed. If the Project Manager requests examination of completed or covered work before final acceptance, the Contractor shall remove or uncover the designated portions of the Work and restore them after examination. If the Project Manager determines that the exposed work is nonconforming, the Contractor shall perform all uncovering, removal, repair, replacement, and restoration at no additional cost to the City. If the Project Manager determines that the exposed work is conforming, the City will pay for the directed uncovering, removal, and restoration as extra work, provided that the Contractor did not conceal the work before required inspection or authorization. Failure to Reject Work During Construction Failure of the Project Manager, representatives, or inspectors to reject defective work or materials during construction does not constitute acceptance of that work or material and does not prevent later rejection if nonconformity is discovered before final acceptance. The City is not responsible for costs, losses, removals, or repairs resulting from the Contractor’s defective or nonconforming work. Failure to Remove and Renew Defective Materials and Work If the Contractor fails or refuses to remove, replace, repair, or correct defective materials or nonconforming work within the time stated in the Project Manager’s written notice, the Project Manager may cause the work to be corrected, removed, replaced, or renewed. The City may recover the resulting costs by deducting the amount from payments due or becoming due to the Contractor, by charging the amount against the Contract, or by any other remedy available under the Contract or law. PRECONSTRUCTION PHOTOS AND VIDEO Before beginning construction, the Contractor shall provide color audio-video documentation of the entire construction area to establish a record of existing conditions. The video documentation shall: Be recorded no more than six weeks before commencement of construction. Be provided in digital MP4 format on a USB drive or by a City-approved electronic file-transfer method. Be clear, sharp, properly exposed, and free from distortion, interruptions, or other defects that prevent identification of existing conditions. Include continuous date and time information displayed electronically on the recording. Include audio narration identifying the project name, recording date, recording party, street name, direction of travel, side of roadway, and limits of coverage. Include a video log and index identifying each recording file, street or easement name, beginning and ending limits, direction of coverage, date, and corresponding time stamps. The Contractor shall submit one complete copy of the preconstruction video documentation to the City before construction and shall retain one complete copy in the Project files through final acceptance. No construction shall begin until the City and Contractor have reviewed the preconstruction documentation. The City shall identify deficiencies requiring correction within five business days after receipt of a complete submission. If deficiencies are identified, the Contractor shall provide supplemental documentation before beginning affected work. The Contractor may engage a professional videographer. All recordings shall be prepared by a qualified commercial firm or individual regularly engaged in preconstruction documentation services. The video documentation shall include all visible surface features within the construction zone and areas reasonably affected by the Work, including: Roadways, pavement surfaces, pavement edges, shoulders, swales, and drainage features. Roadway signs, including narration identifying sign type and location. Existing pavement markings, striping, RPMs, and other traffic-control devices. Driveways, sidewalks, curbs, mailboxes, fences, lawns, landscaping, shrubbery, irrigation features, and visible utility structures. Existing pavement distress, defects, cracks, fractures, settlement, erosion, and other observable deficiencies. For driveways, the Contractor shall record the full driveway from the roadway to the garage or other primary access point and shall pause long enough to clearly document existing conditions. Record one side of a street, easement, or right-of-way at a time. Camera movement, panning, zooming, and narration shall be controlled to provide a clear, usable record of existing conditions. Audio narration shall be live and shall not include unrelated conversations. All recordings shall be completed during periods of adequate visibility. Do not record during significant precipitation, mist, fog, or other conditions that prevent clear documentation. Do not record when more than 10 percent of the area being documented is obscured by debris, vehicles, equipment, or other obstructions unless authorized in writing by the City. Each recording file shall be permanently labeled with the project name, file number, date, location, and limits of coverage. MOBILIZATION Mobilization includes preparatory work and operations necessary to begin the Project, including movement of personnel, equipment, supplies, temporary facilities, and incidentals to the Project site. Mobilization includes bonds, insurance, permits, submittals, preconstruction expenses, and other preparatory costs necessary to begin the Work, excluding construction materials incorporated into the Work. The combined bid amount for Mobilization, Maintenance of Traffic, and NPDES Pollution Control, if required, shall not exceed 6 percent of the total original bid amount. The bid amount for Mobilization shall not exceed 3 percent of the total original bid amount. Mobilization may be invoiced before performance of physical construction work; however, the initial invoice amount shall be approved by the Project Manager and shall not exceed 25 percent of the Mobilization lump-sum bid amount when no other work has been performed. Subsequent payments shall be based on the percentage of Work completed. Mobilization shall be bid and paid as a Lump Sum . MAINTENANCE OF TRAFFIC General Maintain traffic within the Project limits for the duration of construction, including temporary suspensions of the Work. Road Closures and Detours If a road closure is required, the Contractor shall provide, implement, and maintain an approved detour plan. The Contractor shall submit the proposed road-closure and detour plan to the Project Manager at least 72 hours before implementation. No road closure may occur until the City has approved the closure and detour plan. Lane-Closure Limits Lane closures shall not exceed 2 miles in total length in either direction, including tapers, buffers, and work zones, unless otherwise approved in writing by the Project Manager. Access and Notifications Provide and maintain reasonable access to all residences, businesses, emergency services, and other properties affected by the Work. Notify affected residents and businesses at least 48 hours before restricting access to local roads, driveways, or homes. Notifications shall be in a City-approved format and shall identify the anticipated date, time, duration, contact information, and alternate-access arrangements, if applicable. Traffic-Control Personnel and Devices Furnish, install, operate, maintain, relocate, and remove all traffic-control and safety devices required for safe movement of vehicles, bicycles, and pedestrians through and around the Work zone. Perform MOT in accordance with FDOT specifications, the MUTCD, applicable FDOT Standard Plans, and approved MOT plans. A qualified Traffic Control Supervisor shall be available during MOT operations and shall maintain current credentials at the Project site. All traffic-maintenance personnel, including flaggers, shall possess, at a minimum, current Basic Flagger and Temporary Traffic Control qualifications applicable to their assigned duties. Personnel shall have proof of qualifications available at the Project site. The City may verify qualifications at any time. Public Safety and Existing Pavement Do not obstruct traffic or create unsafe conditions during performance of the Work. Promptly repair damage to existing pavement, traffic-control devices, or facilities open to traffic. Law-Enforcement Assistance Provide police or sheriff assistance when required by Section 6.33 or by the Project Manager. All costs are the Contractor’s responsibility. Work-Hour Restrictions The City may restrict lane closures or other traffic-disruptive work to specified hours based on traffic volumes, roadway conditions, special events, emergency operations, or public-safety concerns. The combined bid amount for Mobilization, MOT, and NPDES Pollution Control, if required, shall not exceed 6 percent of the total original bid amount. The bid amount for MOT shall not exceed 3 percent of the total original bid amount. MOT shall be bid as a Lump Sum. Payment shall be proportional to the percentage of MOT work completed and maintained in an acceptable condition. HERBICIDE APPLICATION, CLIPPING, AND BROOMING Before paving, remove all material remaining after milling from the roadway surface by power broom, approved mechanical means, or other approved method. Remove grass, vegetation, dirt, loose material, and dead organic material from pavement edges and other areas where necessary to prepare the surface for paving. Herbicide application will be required on all roadways in this Contract unless otherwise directed by the Project Manager or Paving Inspector. Apply herbicide at pavement edges and where pavement meets driveways or other impervious surfaces, as necessary to prevent vegetation from interfering with paving operations. Apply herbicide in accordance with the manufacturer’s recommendations and at the time directed by the Project Manager or Paving Inspector. The Contractor shall consider the product’s required application interval when preparing the project schedule. Use only products approved by the Florida Department of Agriculture and Consumer Services for use in the State of Florida. Restricted-use products are prohibited. Do not use products in the sulfonylurea family of chemicals. Broadcast spraying is prohibited. The Contractor shall obtain required licenses, pay all associated charges and fees, and provide all legally required notices. Employees applying herbicides or insecticides shall maintain current Florida Department of Agriculture and Consumer Services Commercial Applicator licenses in the applicable categories, including Right-of-Way Pest Control and Aquatic Pest Control when work involves or may affect aquatic areas. Provide proof of current licenses upon request by the Project Manager. Herbicide application, clipping, and brooming shall be bid and paid by linear foot measured along the roadway centerline. MILLING Remove existing asphalt concrete pavement by milling as necessary to improve rideability, correct cross slope, lower finished grades at curbs, driveways, butt joints, and intersections, and prepare the roadway for resurfacing. Mill pavement to provide a flush and smooth transition at existing driveways, curbs, adjacent roadways, and other pavement connections. Unless otherwise directed in writing by the Project Manager or Paving Inspector, mill the full width and full length of each roadway. Milling depth shall average 0 to 2 inches, as directed by the City based on roadway conditions. Do not begin milling a roadway segment more than three calendar days before paving that segment. The Contractor shall take all necessary measures to pave milled roadway segments as soon as practicable after milling. Do not leave a milled roadway surface open to vehicular traffic for more than three consecutive calendar days. For each day after the three-day period that a milled roadway segment remains open to vehicular traffic, the City may assess liquidated damages of $2,000 per calendar day per affected roadway segment. Liquidated damages will not be assessed when delay is caused by a natural disaster or other excusable delay beyon Source: OpenGov https://procurement.opengov.com/portal/capecoralfl/projects/318389 Canonical URL: https://govcontractfinder.com/contracts/fy2027-local-roads-resurfacing-opengov-658933915-project-318389