FY2027 Major Roads Resurfacing State and local opportunity open City of Cape Coral, FL 2027-ITB-PW-003-MR Posted: 2026-11-11T12:30:01.497Z Response deadline: 2026-12-15T19:00:00.000Z The City of Cape Coral was incorporated in 1970 and operates under the Council/City Manager form of government. The City Council has eight members consisting of the mayor and seven members all elected at large on a nonpartisan basis. City Council is responsible for all policy-making functions of the government and retains the services of a City Attorney, City Auditor and City Manager. The City Manager is responsible for all administration of the City, which provides a comprehensive range of municipal services including general government, public safety, community services, public works, planning, utilities, and parks and recreation. Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. Scope of Work and Technical Specifications Scope of Work The Contractor is to furnish all labor, materials, equipment, and operations necessary to complete the following work for select structural repairs and resurfacing of selected Major roadways throughout various locations in Cape Coral (see Exhibit D. Map of Project Area). In addition to other items, as outlined in the specifications and bid documents, the asphalt concrete paving operations may include, but shall not necessarily be limited to all or part of the following: Maintenance of Traffic (MOT): Provide, install, maintain, modify, and remove all required traffic-control devices, detours, temporary pavement markings, signing, and safety measures in accordance with applicable F.D.O.T. standards and City Approved MOT plans. Public Notification : Provide notification to public-safety departments and affected residents and businesses regarding work within the right-of-way that may result in emergency-vehicle detours, restricted access, roadway closures, or interruption of normal daily activities. Notification may include coordination with the City's Communications Department, variable message signs, door hangers, and other City-directed methods. Erosion Control : Furnish, install, inspect, maintain, and remove erosion-and pollution-control measures necessary to prevent pollution of waters, detrimental effects to adjacent public or private property, and damage to project work. Vegetation Control and Surface Preparation : Perform clipping, herbicide application, edge scraping, power brooming and surface cleaning necessary to establish uniform pavement edges, remove loose material and vegetation, and promote proper drainage to adjacent swales. Milling Operations: Mill the existing roadway surface as required to achieve the specified pavement profile, cross slope, grade transitions, and pavement tie-ins. Leveling and grading: Perform leveling, grading, and profile corrections as necessary to provide a uniform riding surface and the required longitudinal grade and cross slope before placement of the final asphalt overlay. Utility Adjustment and Repairs: Adjust, level, repair, and/or replace existing utility structures and appurtenances, including manholes, valve boxes, covers, rings, and associated components, as necessary to match finished grade. Delivery of material to the job site: Haul, deliver, unload, and handle asphalt mixtures and all other materials required for the Work in compliance with the Contract Documents, approved work hours, and City requirements. Application of prime and/or tack coat(s): Apply prime coat and/or non-tracking tack coat, as applicable, to prepared bases and existing pavement surfaces in accordance with Contract requirements and applicable F.D.O.T specifications. Roadway Structural Repairs: Perform pavement and base structural repairs at locations and to limits directed by City Staff, including removal and disposal of unsuitable pavement and base materials, preparation of the repair area, placement and compaction of replacement materials, and restoration of the area to the required grade. Bridge Deck and Expansion-Joint Repairs: Perform bridge deck repairs and replacement of bridge expansion joints, where identified or directed by City staff. Work includes removal and disposal of deteriorated or unsuitable materials; preparation and repair of deck, approach-slab, and joint areas; furnishing and installing the replacement expansion-joint system; restoring the riding surface; and completing all incidental work necessary for a smooth, watertight, safe, and accepted installation in accordance with applicable F.D.O.T. specifications and standard plans. Asphalt Testing: Perform and submit asphalt and in-place density testing to the City in accordance with the frequencies, tonnages, and requirements established by current F.D.O.T. Standard Specifications for Road and Bridge Construction. Superpave Type SP-12.5 Asphalt Overlay : Furnish, place, compact, and finish Superpave Type SP-12.5 asphalt overlay to the thicknesses, grades, cross slopes, and limits directed by the City. Pavement Markings : Replace all existing striping, symbols, messages, crosswalks, bike-lane markings, and raised pavement markers (RPMs), and install additional pavement markings where directed, in accordance with current MUTCD and F.D.O.T. requirements. Work includes temporary markings as necessary; thermoplastic pavement markings; thermoplastic directional arrows; word messages, including “ONLY”; thermoplastic bicycle symbols and arrows; painted pavement markings; and associated striping. Cleanup : Perform street sweeping as necessary throughout construction and provide final cleanup of the project site. Repair or restore, at no additional cost to the City, any damage caused by Contract activities. Sod Installation and Restoration : replace sod along roadway edges disturbed by construction with like kind and quality to match existing conditions. SPECIAL PROVISIONS Schedule Enforcement: Contractors must review and adhere to Section 6.30 (Pursuit of Work) and Section 6.36 (Mandatory Pre-Construction Meeting). The City will strictly enforce schedule adherence and milestone completion. Closeout Documentation: All project closeout documents must be submitted within 30 calendar days of completing final striping. There will be no monthly asphalt or fuel adjustment allowances on this project . Millings: The City reserves the right to retain milled materials. The Contractor shall coordinate delivery and storage with City staff as specified in Section 6.11 – Millings. TECHNICAL SPECIFICATIONS The asphalt concrete resurfacing program for Major roads shall consist of all or part of the following, but shall not necessarily be limited to the following 6.3 through 6.38: FIELD CHANGE REQUESTS All changes to the scope of work that do not affect the contract price or contract time may be allowed. However, authorization written by the Project Manager and confirmation by the contractor is required within 24 hours of the change. An email is an acceptable form of written notification. ADOPTED SPECIFICATIONS The current edition as of the bid opening date of the Florida Department of Transportation (F.D.O.T.) Standard Specifications for Road and Bridge Construction are hereby adopted as the Technical Specifications for Resurfacing and Construction, as amended herein. English pay items shall be used. Superpave mixes shall be used for asphalt. Should F.D.O.T. contract procedures conflict with the City of Cape Coral contract procedures in this contract document, the City of Cape Coral’s procedures shall prevail. Additionally, unless otherwise shown on plans, required by the specifications, or directed by the Project Manager/Engineer, all workmanship and materials shall be in accordance with these specifications, the Manual of Uniform Traffic Control Devices, and the adopted City Engineering Design Standards. AUTHORITY AND DUTIES OF PROJECT MANAGER'S REPRESENTATIVE AND INSPECTORS The City’s Project Manager may appoint such representatives and/or inspectors as they desire. Appointed personnel is authorized to inspect all work done and all materials furnished. Such inspection may extend to all or any part of the work and to the manufacture, preparation, or fabrication of the materials to be used. They are authorized to call to the attention of the Contractor any failure of the work or materials to meet the Contract Documents and have the authority to reject materials or suspend the work until any questions at issue can be referred to and decided by the Project Manager. The Project Manager will immediately notify the Contractor in writing (an email is an acceptable form of written notification) of any such suspension of the work, stating in detail the reason(s) for the suspension. The presence of the inspector or other assistant in no way lessens the responsibility of the Contractor. GENERAL INSPECTION REQUIREMENTS Cooperation by Contractor Do not perform work or furnish materials without obtaining inspection by the City’s Project Manager’s Inspector or her/his representative. Furnish the Project Manager with every reasonable facility for ascertaining whether the work performed and materials used are in accordance with the requirements and intent of the Contract Documents. If the Project Manager requests at any time before final acceptance of the work, remove or uncover such portions of the finished work as directed. After examination, restore the uncovered portions of the work to the standard required by the Contract Documents. If the Project Manager determines that the work so exposed or examined is unacceptable, perform the uncovering or removal, and the replacing of the covering or making good of the parts removed, at no expense to the City. However, if the Project Manager determines that the work thus exposed or examined is acceptable, the City will pay for the uncovering or removing, and the replacing of the covering or making good of the parts removed. Failure to Reject Work During Construction If during or prior to construction operations, the Project Manager or their representatives and/or inspectors fail to reject defective work or materials, whether from lack of discovery of such defect or for any other reason, such initial failure to reject in no way prevents the later rejection when such defect is discovered or obligates the City to final acceptance. The City is not responsible for losses suffered due to any necessary removals or repairs of such defects. Failure to Remove and Renew Defective Materials and Work If the Contractor fails or refuses to remove and renew any defective materials used or work performed, or to make any necessary repairs in an acceptable manner and in accordance with the requirements of the Contract within the contract duration indicated in writing, the Project Manager has the authority to repair, remove, or renew the unacceptable or defective materials or work as necessary, all at the Contractor’s expense. The City will obtain payment for any expense it incurs in making these repairs, removals, or renewals, that the Contractor fails or refuses to make, by deducting such expenses from any money due or which may become due the Contractor, or by charging such amounts against the Contract. PRE-CONSTRUCTION PHOTOS AND VIDEO Prior to project commencement , the Contractor shall provide a color audio-video recording of the entire construction area of the project to serve as a record of all existing site conditions. Video media shall be in standard Digital Video Disc (DVD) format or thumb drive and shall produce bright, sharp, and clear pictures with accurate colors and shall be free from distortion, tearing rolls, and any other form of picture imperfection. The audio portion of the recording shall produce the commentary of the camera operator with proper volume, and clarity, and be free from distortion. The Contractor will provide one copy of the pre-construction video to the City prior to construction and retain one copy in the Project files. The Contractor shall review the audio-video recordings for clarity and accuracy and shall make supplemental records of existing conditions if they are not clearly indicated. No construction shall begin prior to review of the preconstruction video of the construction area by the City and the Contractor. Video recordings shall be made not more than six weeks prior to the commencement of construction. One copy of all recordings and written records shall be well maintained by the Contractor without any damage. The Contractor may engage the services of a professional videographer. However, the color audio-video recordings shall be prepared by a responsible commercial firm or individual known to be skilled and regularly engaged in the business of preconstruction color audio-video documentation. All video recordings shall contain coverage of all surface features located within the construction zone and shall include, but not be limited to: all roadways, roadway signage (type of sign to be noted in commentary), pavements, striping and pavement marking, driveways (zoom in and hold on driveways, from street to garage), sidewalks, mailboxes, raised pavement markings, residential lawns and landscaping, shrubbery and fences. Of particular concern shall be the existence of any faults, fractures, defects, etc. Taped coverage shall be limited to one side of the site, street, easement, or right of way at any one time. Tape coverage shall include all surface conditions located within the zone of influence of construction supported by an appropriate audio description including the location relative to construction stations. Panning, zoom-in, and zoom-out rates shall be sufficiently controlled to maintain a clear view of the object. All video recordings shall, by electronic means, display continuously and simultaneously, the date and time of recording. The video recording shall be generated with the actual taping date and time as transparent digital information. The date information shall contain the month, day, and year. Each tape shall begin with an audio description including the recorded date, name of recording party, and project name, and be followed by the general location, i.e., viewing side and direction of progress. The audio track shall consist of an original live recording. The recording shall assist in viewer orientation and in any needed identification, differentiation, clarification, or objective description of the features being shown in the video portion of the recording, including location relative to construction stations. The audio recording shall be free from any conversations between the camera operator and any other production technicians. Video Identification: All video media shall be permanently labeled and shall be properly identified by number, project name, and location. Video Logs: Each video shall have a log of that video’s contents. The log shall describe the various segments of coverage contained on the video in terms of the names of the streets or easements, coverage beginning and end, directions of coverage, video unit counter numbers, and date. An index shall be provided that lists, in order by video number, each video number and a brief description of coverage contained in that video, including engineering station numbers. All recordings shall be performed during times of good visibility. No recording shall be done during a period of significant precipitation, mist, or fog. The recording shall only be done when sufficient sunlight is present to properly illuminate the subject and to produce bright, sharp video recordings of those subjects. No taping shall be performed when more than 10% of the area to be taped contains debris or obstructions unless otherwise authorized by the City. MOBILIZATION Perform preparatory work and operations in mobilizing for beginning work on the project, including, but not limited to, those operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site. Include the costs of bonds and any required insurance and any other preconstruction expense necessary for the start of the work, excluding the cost of construction materials. The combined costs for work such as Mobilization, MOT, and NPDES Pollution Control, if needed, will not exceed 6% for this project, NTE 3% for Mobilization. Mobilization may be billed in advance of work being performed. However, the initial invoice amount shall be approved by the City’s Project Manager and may not exceed 25% of the lump sum value if no other work has been performed. Subsequent invoices shall be contingent upon the percentage of work completed. This item shall be bid as a Lump Sum and paid as outlined above. MAINTENANCE OF TRAFFIC (MOT) Maintain all traffic within the limits of the project for the duration of the construction period, including any temporary suspensions of the work. If a road closure is required, the contractor must construct and maintain detours. All road closures must be approved by the City Project Manager or his/her representative at least 72 hours prior to occurring. The contractor is required to provide an acceptable Maintenance of Traffic Control Plan that provides details and detour routes for existing traffic; these plans must be reviewed and approved prior to any road closure. All lane closures must not exceed 2 miles in total length (including taper, buffer, and work zone) in any given direction. Provide facilities for access to all residences and businesses along the project corridor. The contractor must notify residents and businesses at least 48 hours in advance if access to local roads or homes will be limited. Furnish, install and maintain traffic control and safety devices during construction in accordance with the requirements of FDOT specifications under the direction of a qualified Traffic Control Supervisor. The Traffic Control Supervisor must always keep a copy of credentials available. Additionally, all traffic maintenance staff including flaggers, must be certified in, at minimum, Basic Flagging and Temporary Traffic Control, and always be in possession of their qualifications. The City reserves the right to verify qualifications at any time. Provide any other special requirements for safe and expeditious movement of traffic specified. MOT includes all facilities, devices, and operations as required for the safety and convenience of the public within the work zone. Do not obstruct or create a hazard to any traffic during the performance of the work. Repair any damage to existing pavement open to traffic. Police or Sheriff Department Assistance shall be required as described in Section 31 at the Contractor’s expense. Work that causes lane closure on a Major Road may be limited to certain times of day depending on the amount of traffic on the Major Road. The combined costs for work such as Mobilization, MOT, and NPDES Pollution Control will not exceed 6% for this project, NTE 3% for Maintenance of Traffic (MOT). This item shall be bid as a Lump Sum and paid contingent upon the percentage of work completed. HERBICIDE APPLICATION, CLIPPING & BROOMING Prior to paving, any material remaining after milling shall be completely removed by power broom and/or burning method from the roadway surface and removed from the site. This includes the removal of grass and vegetation from the edge of the pavement where necessary. The road surface needs to be free of all dirt and dead organic material. This work is incidental to the contract. Herbicide will be required on all roads in this contract, or as directed by the City Project Manager or Paving Inspector. This shall specifically be done where the p Source: OpenGov https://procurement.opengov.com/portal/capecoralfl/projects/317102 Canonical URL: https://govcontractfinder.com/contracts/fy2027-major-roads-resurfacing-opengov-658933915-project-317102