Globe Courthouse Roof and HVAC Replacement State and local opportunity open County of Gila, AZ GIL-IFB-2026-014 Posted: 2026-11-24T15:00:02.179Z Response deadline: 2026-12-29T22:00:00.000Z Gila County is seeking an Arizona-licensed contractor to replace the roof of the Gila County Courthouse in Globe. The project removes approximately 15,500 square feet of low-slope roofing across eight roof areas and installs a fully adhered, two-ply SBS modified bitumen system over tapered insulation, with new coping, flashings, roof drains, condensate lines, walkway pads, and a conventional lightning protection system. The project also replaces five rooftop HVAC package units, with engineering provided by the contractor, and resets the remaining rooftop equipment on raised curbs and code-compliant mounts. All work takes place over an occupied courthouse that stays open throughout construction. This is a sealed Invitation for Bids under A.R.S. Title 34, awarded to the lowest responsive and responsible bidder. A pre-bid site visit is mandatory, and a 10% bid security, 100% performance and payment bonds, and a twenty (20)-year NDL roofing warranty are required. Contractors experienced in commercial roofing on occupied public buildings are encouraged to bid. Total Bid Base Bid - all work in Section 2 and the Construction Documents, excluding Unit Price Items County-Controlled Contingency Allowance (20% of Line 1) Unit Price Item 1 - Roof Deck Replacement Unit Price Item 2 - Roof Drain Piping Replacement Unit Price Item 3 - HVAC Ductwork Modification and Replacement Unit Price Item 4 - Secondary (Overflow) Roof Drain Markup Bid Markup for allowance-funded and cost-plus Change Order work (not to exceed 15%) Base Bid Breakdown Informational Only, not evaluated; used for the County's funding accounts and schedule of values Roofing, demolition, drains, condensate, walkway pads, lightning protection, and all other non-HVAC work HVAC replacement of units 3, 6, 9, 21, and 26 including engineering Removal and reinstallation of all other rooftop equipment, curbs, and mounts Notice of Invitation for Bids Notice is hereby given that Gila County is requesting bids from qualified firms for Globe Courthouse Roof and HVAC Replacement . Competitive sealed bids for the specified material or service shall be received by the Gila County Procurement Group until the time and date shown below. Bids may be submitted electronically through the Gila County Procurement Portal or as a hard copy to the Gila County Procurement Office at the location identified below. Bids received by the correct time and date shall be publicly recorded. Gila County takes no responsibility for informing recipients of changes to the original solicitation document. Failure to submit amendments with the solicitation response may be grounds for deeming submittal non-responsive. Bids submitted electronically must be received through the Gila County Procurement Portal prior to the solicitation deadline. Hard copy bids must be in the actual possession of the Gila County Procurement Group on or prior to the exact time and date indicated below. Late bids shall not be considered . For bids submitted electronically through the Gila County Procurement Portal, the official time shall be the time recorded by the Gila County Procurement Portal at the time of submission. For hard copy bids , the official time shall be the time recorded by the clock located in the Gila County Procurement Office, 1350 East Monroe Street, Globe, Arizona 85501. Submission Methods Bids may be submitted by either of the following methods: (1) Electronic Submission (Preferred Method). Bidders may submit bids electronically through the Gila County Procurement Portal at https://procurement.opengov.com/portal/gilacountyaz . Bidders must complete the Vendor Questionnaire and upload all required documents and forms within the portal prior to the solicitation deadline. (2) Hard Copy. Bidders may submit sealed bids in accordance with the requirements contained in the solicitation. Bidders choosing this method must download the required forms from the Gila County Procurement Portal or request them from the Procurement Officer listed below, complete them, and submit the package to the location listed below in a sealed envelope. The project number and the Bidde r's name and address should be clearly indicated on the outside of the envelope. Failure to clearly indicate project number, name, and address on the outside of the bid package or envelope may be cause for the bids to be deemed invalid. All bids must be completed in ink or typewritten. Faxed or emailed bids will not be accepted. Questions must be addressed to the procurement officer listed below. PROJECT NUMBER: GIL-IFB-2026-014 PROJECT TITLE: Globe Courthouse Roof and HVAC Replacement DEADLINE FOR ALL SUBMISSIONS: Tuesday, December 29, 2026 at 3:00 pm DEADLINE FOR ALL QUESTIONS: Tuesday, December 15, 2026 at 3:00 pm MANDATORY PRE-BID SITE VISIT: Wednesday, December 2, 2026 at 10:00 am SUBMITTAL LOCATION FOR HARD COPIES ONLY: Gila County Procurement Office Mail To: 1400 East Ash Street, Globe, Arizona 85501 Hand-Deliver To: 1350 East Monroe Street, Globe, Arizona 85501 Hard copy bids are considered received only upon arrival at the Procurement Office, 1350 East Monroe Street. Bidders mailing or shipping bids to 1400 East Ash Street are responsible for allowing sufficient time for internal delivery to the Procurement Office prior to the deadline. QUESTIONS: Submit questions through the Question & Answer feature for this solicitation on the Gila County Procurement Portal (preferred), or in writing by email to Olivia M. Todd, otodd@gilacountyaz.gov . Questions must be received by the Deadline for All Questions stated above. Answers will be posted in the Question & Answer section of the Gila County Procurement Portal as they are provided. Questions received by email will also be posted there, with their answers. After the question period closes, all questions and answers will be compiled and issued as a written addendum. Only answers issued by addendum are binding. The Board of Supervisors reserves the right to reject any or all bids , to accept any bids , or to waive any informality in any bids , or to withhold the award if deemed in the best interest of Gila County. All procurement activities conducted by Gila County are in conformance with the rules and regulations in the Gila County Procurement Code. A copy of the code is available for review in the Clerk of the Board’s office, Globe, Arizona. Dates advertised in the Payson Roundup: November 24, 2026, and December 1, 2026 General Scope 2.1 Purpose It is the intent of this Invitation for Bids to award one construction contract to the lowest responsive and responsible Bidder for the complete removal and replacement of the roofing system at the Gila County Courthouse in Globe, Arizona, together with associated mechanical, plumbing, and lightning protection work. The existing roof has reached the end of its service life, leaks into occupied spaces below, and does not drain positively to its roof drains. The work includes: Removal of approximately 15,500 square feet of low-slope roofing across eight (8) roof areas down to the metal deck, and installation of a fully adhered, two (2)-ply SBS modified bitumen roofing system over tapered polyisocyanurate insulation and cover board, with new coping, flashings, gutters, and walkway pads. Removal and replacement of five (5) rooftop HVAC package units (units 3, 6, 9, 21, and 26 shown on Exhibit A), including Contractor-provided engineering as described in Section 2.6.6. Temporary removal and reinstallation of all other rooftop mechanical equipment on raised curbs. Replacement of roof drains and condensate drain lines, CCTV scoping and repair of storm drain leaders, and a new lightning protection system. 2.2 Project Location and Site Conditions Gila County Courthouse, 1400 East Ash Street, Globe, Arizona 85501. The building is an active, occupied courthouse. The courts, several County offices, and the public will occupy the building throughout construction. There is no site work in this project; the Contractor's staging area will be designated by the County. 2.3 Contract Documents and Clarifications The work shall be performed in accordance with this IFB and the Construction Documents in Exhibit B (GH2 Architects, issued 05/01/2026, sheets CS, G001, G002, AS101, D141-144, A141, A501, ME000, ME0.1, ME0.2, and ME1.1). Where this IFB and the Construction Documents conflict, this IFB controls. The following clarifications supersede the Construction Documents: HVAC units. Units 3, 6, 9, 21, and 26 (Exhibit A) shall be replaced with new equipment under Section 2.6.6. All other rooftop mechanical units shall be temporarily disconnected, removed, and reinstalled on raised curbs as shown on ME1.1, keynote 6. References to existing salvaged equipment on A141 (keynote 007) and ME1.1 (keynotes 1 and 6) apply only to the units not being replaced. Lightning protection. The system shall be a conventional system complying with NFPA 780 and UL 96A. Early streamer emission (ESE) systems, including the system referenced in ME1.1 keynote 9, are not acceptable. Storm drain leaders. CCTV scoping of existing roof drain leaders has not been performed. The Contractor shall perform it under Section 2.6.1, before connecting new roof drains, as referenced in ME1.1 keynote 7. Asbestos. Six (6) roof core samples collected in November 2025 were analyzed by polarized light microscopy, and no asbestos was detected (Exhibit D, for reference). The samples were not collected as part of an AHERA-accredited inspection and represent the field roofing system only. Other materials to be disturbed, including flashings, mastics, sealants, coping, curbs, penetration materials, and pipe and duct insulation, have not been tested. The Contractor shall complete the inspection required by Section 2.6.1. 2.4 Contract Time and Liquidated Damages The Contractor shall achieve Substantial Completion within three hundred (300) calendar days after the date of the Notice to Proceed, and Final Completion within thirty (30) calendar days after Substantial Completion. Contract Time may be extended only by Contract Amendment. Liquidated damages of one thousand five hundred dollars ($1,500) per calendar day shall be assessed for each day Substantial Completion extends beyond the Contract Time. This amount is not a penalty; it is a reasonable estimate of the County's loss from continued impairment of an occupied courthouse, which would be difficult to calculate precisely. 2.5 General Requirements Project Management and Scheduling Before starting work, the Contractor shall submit a Critical Path Method (CPM) schedule identifying demolition, deck inspection and repair, roofing phases, HVAC change-outs, and inspections and testing. The schedule shall be updated weekly. The Contractor shall sequence the work to maintain courthouse operations and minimize downtime of mechanical systems. HVAC Operation Plan The Contractor shall submit a written plan for maintaining air quality and conditioning while rooftop units are removed, replaced, or reinstalled. The plan may include temporary cooling units, phased equipment replacement, or other methods approved by the County. No HVAC system shall be taken offline without prior County approval. Downtime shall be minimized and scheduled during non-peak hours where feasible. Permits and Inspections The Contractor shall obtain all required permits and inspections from Gila County Community Development. All fees, testing, and certifications shall be included in the bid. Final inspection reports shall be provided to the County before closeout. Structural Observation Before demolition, the Contractor shall retain a structural engineer (or qualified structural professional) to inspect the underside of all roof decks and submit a report to Gila County Community Development, as required by the General Contractor Notes on sheet CS. No demolition may begin without Community Development approval. After existing roofing is removed, the same engineer shall inspect the exposed deck and structure and submit a second report. No new roofing may be installed until Community Development approves it and identified deficiencies are documented and dispositioned with the County. Safety, Security, and Regulatory Compliance The Contractor shall comply with all applicable OSHA regulations, including fall protection, perimeter warning lines, and edge protection. Guardrails are not acceptable where the Construction Documents prohibit them Instructions to Bidders Precedence of Exhibits IMPORTANT: INSTRUCTIONS TO BIDDERS AND CONTRACT AWARD AGREEMENT ARE BASIC CONTENT TO GILA COUNTY SOLICITATION PACKAGES. INDIVIDUAL SOLICITATIONS MAY REQUIRE DIFFERENT LANGUAGE FOR INSTRUCTIONS AND AWARD AGREEMENTS. WHERE APPLICABLE, SUCH CHANGES WILL APPEAR IN GENERAL SCOPE AND MINIMUM SPECIFICATION AND TAKE PRECEDENCE OVER THE LANGUAGE APPEARING IN INSTRUCTIONS TO BIDDERS AND CONTRACT AWARD AGREEMENT . Preparation of Sealed Bid Gila County invites sealed bids from qualified, experienced, and Arizona-licensed contractors capable of providing the work described in this solicitation. The Contract will be awarded to the lowest responsive and responsible Bidder whose bid conforms in all material respects to this Invitation for Bids. This is a single-award solicitation. Bidders must price every line of the Bid Schedule. Partial bids will be deemed non-responsive. Before submitting its bid, each Bidder shall examine the Construction Documents and this IFB, attend the mandatory pre-bid site visit, and familiarize itself with the existing conditions, laws, regulations, and other factors affecting the work. Photos of existing conditions in the Construction Documents are for reference only. Submission of a bid is a representation that the Bidder has done so. No additional payment will be made for lack of familiarization. Bidders shall promptly notify the Procurement Officer, through the Question & Answer feature, of any error, omission, ambiguity, or conflict found in the solicitation documents. The County will respond through the portal, and all questions and answers will be compiled and issued as a written addendum (see Section 3.5). Bidders shall ensure that all required forms, certifications, documentation, and bid security are completed and submitted with the bid. Failure to include required documentation may result in the bid being deemed non-responsive. Bids shall be signed by an individual authorized to bind the Bidder contractually, with the name and title printed beneath the signature. The County may require evidence of such authority. The full legal name of the Bidder shall be listed on the Offer Page. No alterations in bids shall be made except where authorized by the solicitation documents. Any corrections must be initialed by the authorized representative of the bidder. Contractor Licensing Under A.R.S. § 32-1169, a Bidder must hold a valid Arizona Registrar of Contractors license of the classification required for the work at the time the bid is submitted. The Bidder shall hold a commercial license appropriate to the prime contract, such as B (General Commercial Contractor) or CR-42 (Roofing). Subcontractors performing HVAC, electrical, and plumbing work shall hold the applicable commercial classifications (such as CR-39, CR-11, and CR-37). The Bidder's license number and classification shall be entered on the Qualification and Certification Form. A bid from an unlicensed Bidder, or one not licensed in an appropriate classification, will be rejected. Submission of Bids Sealed bids may be submitted either electronically through the Gila County Procurement Portal or by hard copy. Bidders shall use only one method. 1. Electronic Submission (Preferred Method) . Electronic submissions must be uploaded through the Vendor Questionnaire associated with the solicitation; include all required forms, certifications, attachments, and bid security; contain electronic or scanned signatures where signatures are required; and be fully submitted before the deadline. The County is not responsible for technical issues experienced by the Bidder. The portal will not accept submissions after the deadline. 2. Hard Copy Submission . Bidders submitting a hard copy shall download all required forms from the Gila County Procurement Portal, or request a packet from the Procurement Officer, and submit them as described in Section 3.8. By signature on the Offer Page, Bidder certifies: The submission of the bid did not involve collusion or other anti-competitive practices. The bidder has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the submitted bid. Addenda Any changes to the solicitation will be issued by written addendum. Bidders submitting electronically shall acknowledge addenda through the Gila County Procurement Portal. Bidders submitting hard copies shall acknowledge all addenda on the Bidder's Checklist & Addenda Acknowledgment Form, initialed and dated; if no addenda have been issued, write "Not Applicable" under #1. Failure to acknowledge addenda may result in the bid being deemed non-responsive. Inquiries All questions, requests for clarification, or other inquiries shall be submitted through the Question & Answer feature for this project on the Gila County Procurement Portal. Responses will be posted for all prospective bidders. As an alternative, inquiries may be submitted in writing to the Procurement Officer identified in the Notice. Written inquiries must reference the solicitation number and title. Bidder must not place the solicitation number and title on the outside of an envelope containing inquiries, since it may be identified as a sealed bid not opened until after the bid deadline. Questions received after 3:00 pm on Tuesday, December 15, 2026 will not be answered. Only answers issued by formal written addendum are binding. Oral and other interpretations or clarifications are without legal effect. Late Bids Bids received after 3:00 pm on Tuesday, December 29, 2026 will not be opened or considered, and the Bidder will be notified. The portal blocks late electronic submissions. Hard Copy Submittal Format Hard copy bids shall b e submitted in a sealed envelope or package clearly marked on the outside with: GIL-IFB-2026-014 Globe Courthouse Roof and HVAC Replacement Tuesday, December 29, 2026 3:00 pm Bidder Name Bidder Address Hard copy bids shall include one (1) original with original signatures and the original bid security. The County will not be liable for any cost of preparing bids. Facsimile or emailed bids will not be considered. Spiral-bound bids are not permitted. Modification or Withdrawal of Bids A bidder may modify or withdraw its hard copy bid at any time before the bid deadline by written notice to the County. Bids submitted through the Gila County Procurement Portal may be modified or withdrawn through the Portal before the deadline. After the deadline, bids may not be modified or withdrawn, except as permitted by A.R.S. § 34-201 for a material mistake. Errors and Omissions The County is not responsible for errors or omissions made by the bidder in preparing the bid. Bidder s are responsible for verifying the accuracy of all information submitted. If a unit price and its extension do not agree, the unit price governs and the extension and totals will be corrected accordingly. IFB General Terms and Conditions Pre-Bid Award Review After bid opening, each bid will be screened for responsiveness. Unsigned bids, missing or insufficient bid security, failure to attend the mandatory pre-bid site visit, unacknowledged addenda, incomplete Bid Schedules, and nonconformance with mandatory requirements may result in a determination of non-responsiveness. The apparent low bid and the bids of other Bidders as needed will then be reviewed by the Procurement Group an Source: OpenGov https://procurement.opengov.com/portal/gilacountyaz/projects/317071 Canonical URL: https://govcontractfinder.com/contracts/globe-courthouse-roof-and-hvac-replacement-opengov-78-project-317071