Graffiti Abatement Services State and local opportunity evaluation City of Santa Cruz RFP No. CMO-0326 Posted: 2026-10-27T15:32:35.844Z Response deadline: 2026-11-17T23:00:00.000Z The City of Santa Cruz (City) is soliciting graffiti abatement services within the City limits and on water equipment and property in water services areas located outside of City limits from qualified and experienced contractors. Graffiti abatement services include the use of paint (up to a 99% color match of the surface), the use of water or pressure washing, and the use of an abatement chemical for different surfaces. Surfaces include but are not limited to sidewalks, bridges, medians, paths, fences, light poles, street signs, trees, sewer outlets and more. PRELIMINARY SCOPE OF WORK Project Objectives This scope of work is a component of the City Graffiti Abatement Program. The selected Vendor will help the City meets its objective to remove graffiti from City assets and some commercial properties within 24 to 48 hours, or a timeline approved by the City. Rapid and continuous removal of graffiti within 24 to 48 hours is proven to be the most effective way to deter graffiti vandalism. Minimum Qualifications Firm has no fewer than three years of experience in performing graffiti abatement services – reference checks may be used in evaluation of proposals Present sufficient qualified personnel to carry out the project tasks in a timely fashion Demonstrate experience in conducting work for government institutions of similar or larger size and scope Scope of Work Scope of Work Task 1 - Graffiti Abatement The City receives graffiti reports on a daily basis via the graffiti email, the graffiti phone hotline, and/or through the City's Community Request for Services Portal (CRSP). Graffiti is reported at locations within City limits and on water assets and property in water service areas located outside City limits. Graffiti is reported on various City assets and private property. For a list of graffiti surfaces, please see Appendix B - Graffiti Surfaces. Graffiti may be reported on first floor, second floor, etc. of buildings and/or structures. Vendor shall remove graffiti per the City’s request. Vendor shall not remove graffiti from private property, or City property, without City approval. The Vendor may proactively abate graffiti when in the field on a City approved schedule. For graffiti removal at secured Water facilities, Vendor shall coordinate access with a Water Department point of contact (POC). The Water Department POC shall provide access and verify the graffiti removal method will not pose a contamination risk to the water system. For graffiti removal in City-owned open spaces, graffiti tickets will be assigned directly to City open space staff for initial evaluation. If the graffiti can easily be accessed by a Vendor, it will be assigned to the Vendor for abatement. Task 1 Deliverables: Graffiti removal shall include: Removing graffiti with methods that do not leave shadows or ghosts. Removing graffiti beyond the minimum outline pattern of the graffiti such that letters or shapes do not remain apparent on the surface after the graffiti markings have been removed. Removing graffiti by restoring to the original condition. If painting, color-matching to the surface within 99% of the original color and applied in sufficient quantity to completely and properly remove the graffiti from being visible or detectable. If pressure washing, complying with City Ordinance 16.19 Stormwater and Urban Runoff Pollution Control (See City Municipal Code .) Providing pictures documenting before and after abatement service for each work order. Providing a schedule, approximately 2 times per week. Providing on-call emergency removal services during after-hours, weekend, and holidays. Providing necessary personnel, tools, equipment, materials, supplies and manufactured articles including but not limited to a pressure washer, camera, paint, and graffiti removal products as well as furnishing all transportation including fuel, power, water and essential communications. Task 1 Timing: All tasks shall be completed to the City’s satisfaction within 24 hours of emergency submittals (e.g. gang, hate-crime, etc.) and 48 hours, or a timeline approved by the City , of other work order su bmittals. Vendor shall not be in default for any delay caused by access coordination to Water Department facilities. Vendor shall provide a POC for emergency work orders. Task 2 – Community Request for Services Portal (CRSP) or Vendor Work Order Management System The City is responsible for managing the City's Community Request for Services Portal (CRSP) application. This user-friendly application allows users to request service by dropping a pin on a map, or inputting address details, to indicate the service location, upload pictures and specify requests details, including removing graffiti. Additionally, it offers the option to send a notification to the submitter upon service completion. Vendor may have up to one user account on CRSP to review daily graffiti abatement work. Vendor may review graffiti reports and be able to access or transfer data required to log daily work orders, which includes address, optional pictures(s), optional written description of reported graffiti, property type (e.g. public, private, unknown) and if the graffiti is offensive. In CRSP, Vendor is responsible for updating the status of work orders (see list below) and adding optional notes. Vendor shall also provide “before” and “after” photos of each work order. The “before” photos shall show the graffiti on the surface prior to graffiti removal and the “after” photos shall show the surface after graffiti removal. “Before” and “after” photos cannot be uploaded in CRSP and shall be provided outside of CRSP. Vendor may connect through an application programming interface (API) to City’s CRSP system, to meet above requirement, while following and maintaining the City’s data security protocols. Vendor’s web-based work order system, shall update each work order in CRSP, including updating the work order status and notifying the graffiti report submitter of the resolution, if requested. If work order system does not work properly, including but not limited to updating the status of each work order, for three (3) or more consecutive days, Vendor shall provide a discount on the monthly total invoice to account for City staff time to conduct manual data input. If the City does not provide an API option, it does not eliminate Vendor’s responsibilities to meet the above requirements. Status Use Completed When graffiti has been removed Out of Jurisdiction When graffiti is not within City limits and not on water equipment or property in water service areas located outside of City limits Unable to be Completed When Vendor is unable to remove graffiti Duplicate When there is a duplicate work order Out of Scope When the report is not graffiti (e.g. window etching) Task 2 Deliverables: Work order updates in CRSP and “before” and “after” photos or Vendor work order management system. Task 2 Timing: All tasks shall be completed to the City’s satisfaction as work orders are completed by the timeline indicated in Task 1. Task 3 - Monthly Reports/Invoices Vendor shall provide monthly reports of the graffiti work orders addressed during the month. The report shall include work order iden Responsibilities of City The City will be responsible for managing CRSP and making updates, as needed, and providing a City contact during the term of the Agreement. Damage The Vendor will be responsible for any damage to City property during the performance of this contract. In the event that there is damage to City property, the Vendor will immediately report the incident to the City in writing. Any such damage will be repaired or replaced with same by the Vendor at his/her expense and to the satisfaction of the City. Training The City will provide as-needed training to the Vendor on the usage of CRSP. The Vendor will provide as-needed training to City staff on the usage of the Vendor's work order management system, if applicable. Adequate Stock The Vendor will maintain adequate stock of graffiti abatement supplies to accommodate City’s needs throughout the length of the contract. Failure to maintain adequate stock may be deemed a breach of contract and may result in termination of the contract. Vendor’s Employee Conduct Vendor will agree to remove any employee whose conduct is improper, inappropriate, or offensive as determined by the City. A removed employee(s) is not to work on City premises without the written consent of the City. The Vendor will remove any employee from working in, or delivering to, City facilities who is convicted of a felony during his/her employment. Emergency Response Vendor will provide the name and contact information of a representative who will be available 24 hours a day, 7 days a week, in the event of an emergency. During the emergency, Vendor will provide the City of Santa Cruz with all available supplies, materials, equipment and/or services on a priority basis. Time is of the essence for delivery. Delivery location(s) and estimated arrival will be mutuality agreed upon, by the City and Vendor, at time of order and will be determined based on need and existing conditions. It is understood that current conditions, such as power outages, road closures, and damages to the Vendor’s facility and/or equipment, will be taken into consideration. The City expects emergency deliveries to occur within 4 hours of order placement and may be required during evenings, weekends, and holidays. City Furloughs and Closures As a cost saving measure, many City offices may be closed on Fridays and the City typically closes several facilities during two weeks in December. These pre-scheduled furloughs are subject to change. Vendor will be given prior notice of cost-saving furloughs; and the monthly billing will be prorated accordingly. INTRODUCTION Summary Background Contact Information Timeline The City will make every effort to adhere to the following tentative schedule. All dates set forth in this RFP are subject to change at the City’s sole discretion. Any change will be set forth in an addendum. All references in this RFP to “time” are Pacific Standard Time. GENERAL INFORMATION FOR PROPOSERS Summary Scope of Work All applicants must provide thorough and comprehensive responses that clearly demonstrate their team’s approach to and consistency with the below-mentioned standards. The City invites qualified firms to respond to this Request for Proposal (RFP) for the project (“Project”) titled below: Graffiti Abatement Services RFP No. RFP No. CMO-0326 The City anticipates awarding a contract to a one or more vendors for approximately a one-year term with the option of three-one (1) year term extensions if City so elects. The Propo ser will provide the services outlined in Section PRELIMINARY SCOPE OF WORK . The successful Proposer shall furnish all tools, equipment, materials, tax, apparatus, facilities, labor, transportation, supervision, and management, not specifically provided by the City, to complete the work described in this RFP. The successful Proposer will provide a brief statement of services, as detailed further in Section PRELIMINARY SCOPE OF WORK . Contact If you have any questions concerning this solicitation, please ask questions utilizing City’s e-Procurement Question & Answer feature. This RFP document may be downloaded from the City’s e-Procurement Portal at https://procurement.opengov.com/portal/santacruzca/projects/300440 . For technical assistance, contact OpenGov using the real-time chat feature on the Portal (located in the lower right-hand corner of the screen), or via email at procurement-support@opengov.com for support. All questions must be received by 5:00 pm on Friday, November 6, 2026 . Proposal Submittal Due Date Proposals are due no later than 3:00 pm on Tuesday, November 17, 2026 , to guarantee review. Proposals received after the deadline will be deemed non-responsive. All proposals will be submitted via City’s e-Procurement Portal at: https://procurement.opengov.com/portal/santacruzca/projects/300440 . Proposers take full responsibility for City’s receipt of its Proposal. The City will not be liable for any expenses incurred by Proposers in responding to this solicitation, including but not limited to any costs associated with interviews. It is the responsibility of the Proposer to ensure that electronic submittals are received by the City prior to the deadline. Pre-Proposal Meeting A pre-proposal meeting is scheduled on the date and time stated in the Timeline in INTRODUCTION Section via video conference. The purpose of this meeting is to give Proposers the opportunity to familiarize themselves with the City’s requirements. Clarification and a review of the RFP process will be discussed at the pre-proposal meeting. To expedite the sign-in process, the City will accept a company business card containing the attendee’s name and contact information, as a valid sign-in. Attendance at the pre-proposal conference is not mandatory, however, it is strongly encouraged. Access to the pre-proposal video conference is available via the following: Video Conference Link: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/26661999316097?p=yYilTbdRCFmj77ZQEo Meeting ID: 266 619 993 160 97 Passcode: D9ux6p73 Need help? | System reference Dial in by phone +1 872-242-8054,,782128942# United States, Chicago Find a local number Phone conference ID: 782 128 942# For organizers: Meeting options | Reset dial-in PIN The City complies with the Americans with Disabilities Act. If you require reasonable accommodations in order to attend the pre-bid meeting, please call the contact listed in the INTRODUCTION section at least 48 hours prior to the meeting. Responsiveness and Responsibility When determining the Responsiveness of the proposal, the City may consider any of the following but not limited to: Proposal received on time and completed per instructions. Proposal contains required contents, forms and signatures submitted in accordance with RFP instructions. Proposal is compliant with specifications and industry standards. When determining the Responsibility of the Proposer, the City may consider any of the following but not limited to: Possession of industry standard licensing and/or certifications. Financial capacity of the Proposer. Experience or past performance of the Proposer. Use of Subcontractors / Subconsultants. Past, Present and Pending Legal Actions. Exceptions with City’s Terms and Conditions. Anticipated adherence with Project delivery schedule. Ability to respond to City’s inquiries for proposal clarification. Proposers have the right to take exception to the specifications or terms and conditions of this RFP, however, such exceptions may deem the proposal non-responsible. Any exceptions taken must be explained in the proposal and submitted by the submittal due date. Any exceptions that contradict the City’s terms and conditions or contain provisions that are not in the best interest of the City will disqualify the Proposer. If exceptions are not explained, the Proposer will comply with the specifications as stated in this RFP. Exceptions submitted after the proposal due date will not be accepted. The City reserves the right to reject any or all proposals and to waive any informality or minor defect in proposals received. Definitions In this RFP document: “Proposer” means contractor, firm, supplier, vendor, or consultant submitting a proposal to this RFP. “Proposal” means the complete submittal of Proposer to the City in response to this RFP, including any written documentation and oral interview responses. “Subcontractor” means those performing any portion of the services as subcontractors, vendors, suppliers, and other business entities and individuals that is not the Proposer. “Key Staff”, if required, means the employees of the Contractor or subcontractor(s) that will provide project leadership or expertise in lead technical services and are considered essential to the success of the Project. “Contract” also means Purchase Order or Agreement. PROCESS INSTRUCTIONS Questions and Requests for Clarification and Addenda Questions or concerns regarding any aspect of this RFP shall be sent via City’s e-Procurement Portal’s Question & Answer feature and received by the date identified in Timeline in INTRODUCTION Section . Any questions or objections not submitted within the time and manner stated above or to anyone other than the above-stated contact will be deemed waived. The City is not bound by the oral representation of any City employee or official. Answers to questions received will be sent out in the City's procurement portal. The City may determine it is necessary to revise any part of this RFP. Revisions will be made by written addenda and it is the Proposer’s sole responsibility to comply with any addenda to this RFP. Addenda will be posted on the City’s e-Procurement Portal, https://procurement.opengov.com/portal/santacruzca/projects/300440 , under Bidding Information. Proposal Evaluation Criteria RFP responses will be evaluated and ranked according to the evaluation criteria identified in the sub-sections Responsiveness and Responsibility in GENERAL INFORMATION FOR PROPOSERS section, below, by an evaluation committee composed of City staff. The evaluation committee will open and review the proposals in confidence. Proposals will be available to the public after the contract award. After the initial proposal evaluation, the City may determine that additional information is needed to establish the final ranking of proposers. The semi-finalists will be contacted and may be asked to: Conduct a scenario-based demonstration of the equipment or service, Revise the submitted proposal for the purpose of obtaining best and final offers, and/or Provide additional information to assist City in determining the best value proposer. The Evaluation Committee will use all information collected to rank the semi-finalists in order of their ability to best meet the requirements of the City. The City will begin negotiating a firm contract with the highest ranked Proposer. If no agreement can be reached, negotiations will begin with the next ranked Proposer. Responsiveness Responsiveness is determined in accordance with meeting the minimum requirements in Sub-Section Responsive and Responsibility of Section GENERAL INFORMATION FOR PROPOSERS to be responsive (the submittal includes all of the required documentation). Responsibility Responsiveness is determined in accordance with meeting the minimum requirements in Sub-Section Responsive and Responsibility of Section GENERAL INFORMATION FOR PROPOSERS to be responsive (the submittal includes all of the required documentation). The total maximum score for the evaluation of proposals is 100 percent (100%). Proposals will be evaluated by the EC using the Proposal Evaluation Criteria as set forth in Section EVALUATION CRITERIA . Proposals that are deemed responsive, from a Proposer that has been deemed responsible, will be evaluated based on the Evaluation Criteria below. Evaluation and scoring of proposals will be based on how likely the proposal content meets or exceeds the performance requirements of this RFP. Negotiations Upon the City’s final ranking of proposals, the Proposers shall be prepared to enter negotiations to enter into the Contract. The City will first begin negotiations with the top-ranked Proposer(s). If the City and the top-ranked Proposer(s) do not reach an agreement, then the City may negotiate with the next highest-ranked Proposer. This process will continue until the City rea Source: OpenGov https://procurement.opengov.com/portal/santacruzca/projects/300440 Canonical URL: https://govcontractfinder.com/contracts/graffiti-abatement-services-opengov-8-project-300440