Gravity Sewer Line Rehabilitation/Inflow and Infiltration Correction (CG - 06D01626 - 0) State and local opportunity open City of Cooper City, FL IFB2026-3 Posted: 2026-11-04T12:34:05.519Z Response deadline: 2026-12-04T20:00:00.000Z The City of Cooper City (“City”) is requesting sealed bids to secure the services of an experienced, professional, licensed, and qualified Contractor capable of providing services in accordance with the specifications for gravity sewer line rehabilitation I and I correction. The scope of services includes gravity sewer main cleaning, pre- and post-cleaning closed-circuit television (CCTV) inspections to assess and prepare the mains for rehabilitation, sewer lining and rehabilitation for infiltration and inflow (I&I) correction, and post-rehabilitation CCTV inspections to document completion and inspect the rehabilitated work for leakage. The scope of services also includes but is not limited to removal and replacement of existing sidewalk and curb and gutter, removal and replacement of existing landscape and sod, removal and replacement of asphalt, concrete sidewalks, and curb, removal and replacement of traffic signs, striping and signal loops, final grading and sod restorations, installation of new water mains, sewer mains, reclaimed water mains, force mains, fittings and valves, installation of new water mains, sewer mains, reclaimed water mains, force mains, fittings and valves, installation of new fire hydrants or relocations, removal and replacement of water, reclaimed or sewer services to new or existing mains, wet taps, abandonment of existing mains, installation of new manholes, installation of new sewer services or relocations, utility testing, abandonment of existing mains or manholes, point repairs and or sectional liners on existing sewer mains or manholes, replacement of manhole ring and covers, sewer main assessment, cleaning, chemical grouting and lining and all other appurtenant and miscellaneous work required for completion of the work, in accordance with the Contract Documents and not included in other bid items. The Work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents, which may be necessary for the complete and proper construction of the Work in good faith, shall be provided by the Contractor as though originally so indicated, at no increase in cost to the City. GENERAL TERMS AND CONDITIONS GENERAL TERMS AND CONDITIONS GENERAL TERMS AND CONDITIONS: City of Cooper City’s General Terms and Conditions are applicable to this solicitation. Bidders that receive an award from City of Cooper City through the competitive procurement process must anticipate the inclusion of these requirements in the resultant Contract. These general terms and conditions are considered non-negotiable and include important instructions and requirements that affect all Bids. By submitting a Bid for in response to this solicitation, Bidder attests to its understanding of these general terms and conditions. All applicable terms and conditions pertaining to this Solicitation and resultant Contract (if applicable) may be viewed by clicking the attached document. __________________________________________________________________________________________________________________________________________________________________________________________________ NOTICE TO ALL BIDDERS: Bids are to be submitted electronically OpenGov ( https://procurement.opengov.com/portal/coopercity ) until 3:00 pm , Friday, December 4, 2026 . It is the sole responsibility of the Bidder to ensure that its bid is submitted before the solicitation deadline. There is no cost to the Bidder to submit a bid for Cooper City. Electronic submissions may require the uploading of electronic attachments. The submission of attachments containing embedded documents or proprietary file extensions is prohibited. For information concerning this Solicitation, use the question/answer feature provided within the Solicitation by OpenGov. Questions of a material nature must be received prior to Monday, November 23, 2026 at 12:00 pm . Material changes, if any, to the Solicitation will be made only by written addendum. (Ensure to include addendum acknowledgement, if applicable). Bidders must allow sufficient time to complete online forms and upload all bid documents. All information and documents must be fully entered, uploaded, acknowledged before Friday, December 4, 2026 at 3:00 pm . Late submissions will not be considered. __________________________________________________________________________________________________________________________________________________________________________________________________ No part of a Bid can be submitted via hardcopy, email, or fax. ADDITIONAL/SPECIAL TERMS AND CONDITIONS PURPOSE The City of Cooper City “City”) is seeking bids from qualified firms for its Federally funded Gravity Sewer Line Rehabilitation/Inflow and Infiltration Correction Project (“Project”). The Successful Bidder shall provide all labor, superintendence, equipment, accessories, materials, tools, transportation, services, incidentals, etc., including all applicable taxes and fees. CONTRACT TIME/TERM OF CONTRACT The effective date of the resultant Contract shall commence on the first calendar day of the month succeeding approval of the Contract by the City Commission, or designee, unless otherwise stipulated in the Purchase Order issued by the City, and shall remain in effect until final completion or two hundred forty (240) calendar days after the date of the Notice to Proceed issued by the City. Time is a very important factor in the performance of this work. The time for final completion and readiness for final payment are set forth within this Solicitation and shall become part of the Contract Documents. Substantial completion shall be within one hundred eighty (180) calendar days after the date of the Notice to Proceed is issued by the City to the Awarded Bidder. Final completion shall be within two hundred forty (240) calendar days after the date of the Notice to Proceed issued by the City to the Awarded Bidder. The time for final completion will be taken into consideration by the City during the evaluation of bids, and it will be necessary for the apparent successful contractor to satisfy the City that it will be able to achieve substantial completion and be ready for final payment within the times designated in the submission. All work must be completed within the time set forth in the proposal unless an extension is granted in writing by the City through a Change Order, Amendment and/or Modification. Violations may void the resultant Contract, and/or preclude the Awarded Bidder from bidding additional projects for the City, until such time that the work has been satisfactorily completed and inspected. PRE-BID CONFERENCE The Pre-Bid Conference and will be held virtually Wednesday, November 18, 2026 , at 9:30 am (Eastern Standard Time) via Zoom ( https://coopercityfl-org.zoom.us/j/88694328600 ). Participants will have an opportunity to ask questions and obtain clarification during the pre-bid meeting. Bidder(s) are requested to have a copy of the solicitation available for review and reference during the meeting. This meeting is exempt from the ‘Cone of Silence’, allowing City staff to address questions. It is highly recommended that Bidders participate in the Pre-Bid Meeting to become familiar with any conditions which may in any manner affect the work to be done or affect the equipment, materials and labor required prior to submitting an offer. No additional allowances will be made because of lack of knowledge of these conditions. City staff will go over the specifications and what is expected for this Project. Should you need an ADA accommodation to participate in this meeting (i.e., materials in alternate format, sign language interpreter, etc.) or any o ther meeting, please contact the City Clerk at least seventy-two (72) hours prior to the scheduled meeting. The City Clerk, Tedra Allen, may be reached by phone at (954) 434-4300 x 291 or via email at: tallen@coopercity.gov . TTY users may reach the Clerk's Office by calling the Florida Relay Service at 711. Zoom Link: https://coopercityfl-org.zoom.us/j/88694328600 Webinar ID: 886 9432 8600 Phone one-tap: +13052241968,,88694328600# US +13017158592,,88694328600# US (Washington DC) Join via audio: +1 305 224 1968 US +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 929 205 6099 US (New York) +1 346 248 7799 US (Houston) +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) International numbers available: https://coopercityfl-org.zoom.us/u/kqc6teBTl MINIMUM REQUIREMENTS Bidder must meet the following requirements to be considered for award: Bidders shall hold one of the following active and valid licenses: a State of Florida Underground Utility and Excavation Contractor License and/or a State of Florida General Contractor License. All licenses shall be valid and active at the time of bid submittal and remain valid and active throughout the solicitation process and resultant contract term. Bidders shall submit a copy their license(s) with their bid. Bidders shall have a minimum of five (5) years' experience in the business of gravity sewer line construction to be considered for award. Bidders shall demonstrate their experience by providing three (3) references from customers whom the Bidder and/or Bidder’s Subcontractor has provided or is currently providing goods and/or services as described throughout this Solicitation. In lieu of the references from the Bidder or Bidder’s Subcontractor(s), the City will consider the references from Bidder’s key personnel. Each reference shall include, at a minimum, the customer’s company name, and the contact person’s name, title, telephone number, e-mail address, contract number (if applicable), total contract amount/construction cost, and a description of the work performed. These references shall attest to the City’s satisfaction that the Bidder/key personnel/Subcontractor has sufficient expertise to perform the requested work. Bidders shall have a minimum experience of no less than five (5) years in government, employing specialty technicians certified by the proposed product manufacturer and/or its authorized representative. METHOD OF AWARD Award shall be made to the responsive and responsible Bidder that submits the lowest evaluated price, as determined by the City. Because estimated quantities are not provided, the City will determine the lowest evaluated price by calculating the aggregate total of all unit prices submitted on the Price Sheet, with each listed item assigned a quantity of one (1) solely for purposes of bid evaluation and comparison. The resulting evaluated total shall be used only to determine the lowest-priced Bidder and shall not represent the anticipated Contract value, guaranteed quantities, or the amount of Work that will be authorized under the Contract. The unit prices submitted by the Successful Bidder shall become the Contract unit prices and shall be used for Work authorized by the City during the Contract term. Actual quantities will be determined based upon the City’s needs, and the City makes no representation or guarantee regarding the quantity or dollar amount of Work that may be issued under the Contract. The City reserves the right to reject any or all Bids, to waive minor irregularities, informalities, or technicalities, to accept any item or group of items unless qualified by the Bidder, and to acquire reduced or additional quantities at the unit prices submitted in the Bid. The City intends to award a single contract; however, the City reserves the right to make such award as determined to be in its best interest. Contract award shall be made by the City Commission of the City of Cooper City ("City Commission") at a duly authorized public meeting. The Recommended Bidder shall timely execute an Agreement with the City and submit all required bonds, insurance certificates, affidavits, licenses, and other documents required of the Solicitation and the City. Failure of the Recommended Bidder to execute the Agreement and/or provide all required bonds, insurance certificates, affidavits, licenses, and other documents required of the Solicitation and the City within the timeframes specified within the solicitation may deem the Bidder non-responsive, constitute a rejection of the award and/or default by the Bidder. In the event the Recommended Bidder fails to execute the Agreement and/or fails to provide all required bonds, insurance certificates, affidavits, licenses, and other documents required of the Solicitation and the City, is determined to be non-responsible, withdraws its Bid, refuses to honor its Bid pricing, or otherwise fails to satisfy the requirements necessary for contract execution, the City reserves the right to revoke the award, may forfeit the Bidder's bid bond/security to the City, which forfeiture shall be considered not as a penalty, but as liquidated damages sustained by the City. The City may also proceed to the next lowest responsive and responsible Bidder. The City may continue this process in successive order of Bid ranking until a contract is successfully executed and all required documents are received and approved by the City. The City further reserves the right to reject all Bids and resolicit if deemed to be in the City's best interest. The City may seek any remedies available at law or in equity, including recovery of excess procurement costs, damages, and/or suspension or debarment from future City solicitations as permitted by applicable law, ordinance, or policy. Bidders recognize and agree that circumstances outside the fault or control of either party may occur between the bid date and the award of the Solicitation that may cause pricing to be subject to rapid and unpredictable changes. The Parties agree it is in the best interest of the City to avoid paying estimated and potentially overstated amounts, while also allowing the City to benefit from potential price improvements resulting from market fluctuations. Accordingly, Bidders agree as follows: A. This provision shall apply only to the period between one hundred eighty-one (181) calendar days after the proposal submittal date (following expiration of the bid bond) and the award of the Solicitation. Bidders shall be responsible for all cost escalation risks between the proposal due date and one hundred eighty (180) calendar days after the bid due date. The Bid amount, as awarded, shall be deemed full compensation for any escalation occurring prior to award of the Solicitation. B. All risks of any further cost escalation after award of the Solicitation shall be borne solely by the Recommended Bidder. No requests for adjustment due to escalation costs shall be considered after award of the Solicitation. C. The Recommended Bidder shall be entitled to a one-time price adjustment for cost escalation occurring between one hundred eighty-one (181) calendar days after the bid due date and the award of the Solicitation. Such adjustment shall be based upon changes in the Engineering News-Record (ENR) Building Cost Index (BCI), utilizing a simple percentage calculation. The adjustment shall be calculated by dividing the BCI value in effect during the month of award by the BCI value in effect during the month corresponding to one hundred eighty-one (181) calendar days after the bid due date. D. The one-time price adjustment shall apply only if the current BCI value varies by more than five percent (5%) from the BCI value prevailing during the month in which proposals were received. Any adjustment shall be limited to the marginal escalation exceeding the five percent (5%) threshold and shall not include additional profit or overhead. E. The City reserves the right to audit the Recommended Bidder’s records related to any adjustment requested or granted under this provision. Bidder agrees that all payments contemplated under this provision are subject to the audit provisions contained within the Solicitation and Contract documents. F. Any price adjustments, whether upward or downward, shall be equitably passed through to subcontractors responsible for purchasing the affected materials. INDEMNIFICATION See General Terms and Conditions. INSURANCE As a condition precedent to the effectiveness of this Agreement, during the term of this Agreement and during any renewal or extension term of this Agreement, Contractor shall, at its sole expense, provide insurance of such types and with such terms and limits as noted below. Providing proof of and maintaining adequate insurance coverage are material obligations of Contractor. Contractor shall provide the City a certificate of insurance evidencing such coverage. Contractor’s insurance coverage shall be primary insurance for all applicable policies, in respect to the City’s interests for this Agreement. The limits of coverage under each policy maintained by Contractor shall not be interpreted as limiting Contractor’s liability and obligations under this Agreement. All insurance policies shall be through insurers authorized or eligible to write policies in the State of Florida and possess an A.M. Best rating of A-, VII or better, subject to approval by the City’s Risk Management office. The coverages, limits, and/or endorsements required herein protect the interests of the City, and these coverages, limits, and/or endorsements shall in no way be relied upon by Contractor for assessing the extent or determining appropriate types and limits of coverage to protect Contractor against any loss exposures, whether as a result of this Agreement or otherwise. The requirements contained herein, as well as the City’s review or acknowledgement, are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Contractor under this Agreement. The following insurance policies and coverages are required: Commercial General Liability Coverage must be afforded under a Commercial General Liability policy with limits not less than: $1,000,000 each occurrence and $2,000,000 aggregate for Bodily Injury, Property Damage, and Personal and Advertising Injury $1,000,000 each occurrence and $2,000,000 aggregate for Products and Completed Operations Policy must include coverage for contractual liability and independent contractors. The City, a Florida municipality, its officials, employees, and volunteers are to be included as an additional insured with a CG 20 26 04 13 Additional Insured – Designated Person or Organization Endorsement or similar endorsement providing equal or broader Additional Insured Coverage with respect to liability arising out of activities performed by or on behalf of Contractor. The coverage shall contain no special limitation on the scope of protection afforded to the City, its officials, employees, and volunteers. Business Automobile Liability Coverage must be afforded for all Owned, Hired, Scheduled, and Non-Owned vehicles for Bodily Injury and Property Damage in an amount not less than $1,000,000 combined single limit each accident. If Contractor does not own vehicles, Contractor shall maintain coverage for Hired and Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy. Workers' Compensation and Employer's Liability Coverage must be afforded per Chapter 440, Florida Statutes. Any person or entity performing work for or on behalf of the City must provide Workers’ Compensation insurance. Exceptions and exemptions will be allowed by the City’s Risk Manager, if they are in accordance with Florida Statute. Contractor waives, and Contractor shall ensure that Contractor’s insurance carrier waives, all subrogation rights against the City, its officials, employees, and volunteers for all losses or damages. The City requires the policy to Source: OpenGov https://procurement.opengov.com/portal/coopercity/projects/264403 Canonical URL: https://govcontractfinder.com/contracts/gravity-sewer-line-rehabilitation-inflow-and-infiltration-co-opengov-12265954-project-264403