Gregory Area Infrastructure Improvements State and local opportunity evaluation City of Fullerton 53055 Posted: 2026-10-30T15:03:19.421Z Response deadline: 2026-11-17T21:00:00.000Z Sealed Proposals for Gregory Area Infrastructure Improvements , in accordance with the Plans and Specifications, will be received through the Procurement Portal until 1:00 pm on Tuesday, November 17, 2026 , and shortly thereafter on this same day. INVITATION TO BID Sealed Proposals for Gregory Area Infrastructure Improvements will be received through the OpenGov Procurement Portal until 1:00 pm on Tuesday, November 17, 2026 , and on this same day shortly thereafter, the bidding results will be released. No Bid will be accepted unless it is submitted through the OpenGov Procurement Portal. Results will be available on the Procurement Portal and City of Fullerton website. No Bid will be accepted unless it is submitted through the OpenGov Procurement Portal. Results will be available on the Procurement Portal and City of Fullerton website. SCOPE OF WORK: The Work shall consist of, but not be limited to, abandoning and removing existing water main piping and appurtenances, furnishing and installing new water main piping and appurtenances, removal of existing sewer pipes, installation of new VCP sewer pipes, removal of existing sewer manholes, construction of new sewer manholes, repair of the trench and asphalt, adjustment of water valve boxes and sewer manholes, traffic control, water pollution control, and all related work. The time of completion of contract shall be one hundred and ninety (190) working days as defined in the Standard Specifications for Public Works, 2024 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $2,400 per calendar day. The Engineer's estimate for this project is $3,850,000 . For this contract, the contractor shall possess Class A license at the time the bid is submitted. Contractor shall take note of the following dates and milestones. Contractor will take full responsibility for completing all precursory requirements necessary for this issuance. Release To Bid: October 30, 2026 Question Submission Deadline: November 10, 2026, 1:00pm Bid Submission Deadline: November 17, 2026, 1:00pm Award of Contract: December 1, 2026 Deadline to submit contract documents: December 22, 2026 Pre-Construction Meeting: January 11, 2027 Notice to Proceed/Start Construction: February 1, 2027 Contractor shall provide all labor, materials, tools, equipment and incidentals for the work, complete in place. The Contractor agrees to commence the work and related services upon the receipt of a written Notice to Proceed from the City. It is the Contractor’s responsibility to provide sufficient and qualified personnel, equipment and materials. Each bid must be accompanied by a bidder's bond, or certified check, or cashier's check, made payable to the City of Fullerton, for an amount equal to at least 10% of the bid amount, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. A digital copy of the security shall be uploaded as part of the bid submittal with the three apparent lowest bidders required to submit original hard copies to the City within three (3) working days of bidding opening. Refer to the bid package on OpenGov for additional information. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2024. Contractor shall provide all the required insurance to the minimum limits as defined in the Supplemental Information to Bidders with Certificates of Insurance for each form of coverage. No contract will be awarded to any contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division III of the State Business and Professions Code, Section 7,000, et seq. The Contractor shall possess the appropriate legal and necessary licenses required to complete the work as shown in this contract at the time the bid is submitted. No contractor or subcontractor may be listed on a bid proposal for public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code 1725.5 and Senate Bill 854. A contractor is prohibited from working on this contract with any subcontractor who is ineligible to perform work pursuant to Section 1777.1 or 1777.7 of the Labor Code. Apprentices: Attention is directed to sections 1777.5, 1777.6 and 1777.7 of the California Labor Code concerning the employment of apprentices by the contractor or any such subcontractor under him. Section 4.02.010 of the Fullerton Municipal Code requires that all contractors and sub-contractors shall obtain a City Business Registration Certificate. The contract will not be executed until the contractor and sub-contractor(s) obtain such certificate from the Business Registration Office at City Hall, 303 West Commonwealth Avenue, Room 104, Fullerton, CA 92832. All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. If the City Council makes an award, it will be to the lowest responsible bidder . For Unit Price bids, in the event there is a discrepancy between the extension and the unit cost, the unit cost will prevail. By Resolution No. 6173, the City Council adopted the general prevailing rate of per diem wages as determined and published by the State Director of the Department of Industrial Relations, pursuant to Sections 1770, 1773, and 1773.1 of the California Labor Code. Copies of these rates, the Federal Wage Rates, and the latest revisions thereto are on file in the office of the City Engineer and are available for review upon request. The contractor shall also comply with Sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 as required by the California Labor Code. In the awarding of the contract, the City shall give equal opportunity to all bidders, regardless of sex, race, creed, color, national, or ethnic origin. The City Council reserves the right to reject any and all bids, to waive any informality or irregu NOTICE TO BIDDERS Proposal Forms The Bid Documents shall be fully executed and submitted on the forms in the project specifications. All information requested therein must be clearly and legibly set forth in the manner and form indicated. The City may reject any Proposal not meeting these requirements. Unauthorized conditions, limitations, or provisions attached to a Proposal will render it informal and may cause its rejection. Alternative proposals will not be considered unless requested. Oral, telegraphic, or telephonic proposals or modifications will not be considered. Proposal Guarantee When required by the Bid Documents, each bidder shall submit with the Proposal, an unconditional certified or cashier's check, or a bidder's bond in the sum of the percentage of the bid stated in the Invitation to Bid, as a guarantee that the bidder will, if its Proposal is accepted, execute the Contract and furnish a satisfactory Performance Bond, a satisfactory Labor and Materials Bond and insurance certificates, as specified. Any Proposal not accompanied by such a guarantee will not be considered. The bidder, if awarded the Work, will enter into a contract and furnish the necessary bonds within the period stated in the specifications. In the case of refusal or failure to enter into said contract, the check or bond, as the case may be, shall be forfeited to the City. All cashier's checks or certified checks must be drawn on a responsible bank doing business in the United States and shall be made payable to THE CITY OF FULLERTON. A bonding company admitted and licensed to do business in the State of California must issue bid bonds. Bid Documents Signature If the bid is made by an individual, it shall be signed and his/her full name with his/her address shall be given; if it is made by a firm, it shall be signed with the co-partnership name by a member of the firm who shall sign his/her own name and the name and address of each member shall be given; and if it is made by a corporation, the name of the corporation shall be signed by its duly authorized officer or officers attested by the corporate seal, and the names and titles of all officers of the corporation shall be given. Submittal of Proposal The Proposal shall be submitted through the OpenGov Procurement Portal at https://procurement.opengov.com/portal/cityoffullerton , no later than 1:00 pm on Tuesday, November 17, 2026 . It is the bidder's sole responsibility to see that its bid document package is received as stipulated. Withdrawal of Proposal The Proposal may be withdrawn by the bidder through the Procurement Portal, prior to the scheduled closing time for receipt of the Proposal. A Proposal may only be requested to be withdrawn after the hour fixed for opening bids if documentation is provided to the City in accordance Public Contract Code Section 5100 to 5110. The City reserves the right to review and reject the request for withdrawal. Return of Proposal Guarantees The proposal guarantees of the second and third lowest bidders will be held until the awarded bidder has properly executed all contract documents. After the award of contract, the remaining proposal guarantees accompanying all other proposals will become null and void and returned to the unsuccessful bidders. Taxes No mention shall be made in the Proposal of Sales Tax, Use Tax or any other tax, as all amounts bid will be deemed and held to include any such taxes which may be applicable. Disqualification of Bidders In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor. Discrepancies and Misunderstandings Bidders must satisfy themselves by personal examination of the work site, plans, specifications and other contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the Work must be performed. No bidder shall at any time after submission of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Should a bidder find any errors, omissions, or discrepancies in the plans, specifications, and other contract documents or should be in doubt as to their meaning, the bidder shall notify the City by submittal of a Request for Information (RFI) at least five (5) working days prior to the bid opening, through the Question and Answer section of the Project through the Procurement Portal. Should it be found necessary, a written addendum will be sent to all bidders. Any addenda issued during the bidding period shall form a part of the contract and shall be acknowledged in the proposal. Items of Work Items of work not specifically listed in the bid schedule shall be included in the bid prices for related work. For all work required and shown on the construction plans and specifications for which no specific bid item or price is listed in the bid schedule, it shall be understood that such work, equipment, labor, tools, and materials shall be provided as part of the listed bid items and no additional compensation will be paid therefor. Addenda The effect of all addenda to the contract documents shall be considered in the bid package and said addenda shall be made part of the contract documents. Failure to acknowledge any such addenda with the Proposal may render the bid irregular and may result in its rejection by the City. Equivalent Materials Requests for the use of equivalents to those specified, must be submitted to the City twenty (20) working days prior to the need of such materials. Within that time, the City will issue a written response indicating approval or disapproval of such request. It is the sole responsibility of the successful bidder to prove to the City that such a material is truly an equivalent. Legal Responsibilities All proposals must be submitted, filed, made and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same or expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions and requirements set forth, contemplated and referred to in the Plans, Specifications and other contract documents, and to full compliance therewith. Award of Contract The award of contract, if made, will be to the lowest responsible bidder as determined solely by the City. In no event will an award be made until all necessary investigations are made to the responsibility and qualifications of the bidder to whom the award is contemplated. Material Guarantee The successful bidder may be required to furnish a written guarantee covering certain items of work for varying periods of time from the date of acceptance of the work by the City. The work to be guaranteed, the form, and the time limit of the guarantee will be specified in the special provisions. Said guarantee shall be signed and delivered to the City before acceptance of the contract by the City. Upon completion of the contract, the amounts of the two required contract bonds may be reduced to conform to the total amount of the contract bid prices for the items of work to guaranteed, and this amount shall continue in full force and effect for the duration of the guarantee period. However, the Labor and Material Bond cannot be reduced until the expiration of 35 days after the date of recordation of the Notice of Completion. Bid Protest To be considered timely, a bid protest must be filed within the following time limits: Protests based upon alleged defects, discrepancies, or improprieties in the bid documents shall be submitted to the City Engineer in writing not less than five (5) calendar days prior to the date of bid opening. All other protests must be submitted in writing to the City Engineer no more than five (5) calendar days after the date of when the Bids were due to the City and results posted. The written protest must set forth, in detail, all grounds for the protest, including without limitation all facts, supporting documentation, legal authorities and arguments in support of the grounds for the protest. All factual contentions must be supported by competent, admissible and credible evidence. Any matters not set forth in the written protest shall be deemed waived. Any protest not conforming to this procedure shall be rejected as invalid. The City Engineer shall review the merits and timeliness of the protest and issue a written decision to the protestant within seven (7) calendar days of receipt of the protest. The decision of the City Engineer may be appealed to the City Council at the scheduled City Council meeting for award of the contract. Contact Information: CIP@cityoffullerton.com Additional Information Reference is made to the Invitation to Bid, General Specifications and Special Provisions for additional information and requirements. Questions to the Engineer Questions regarding the project documents (i.e. plans, specifications, contract documents, bid forms, etc.) will be received by the Project Engineer, through the Procurement Portal, up to five (5) working days prior to the bid opening as specified in the Invitation to Bid. Questions asked of the Project Engineer after this time will not be addressed. All questions must be submitted through the Procurement Portal. INSURANCE REQUIREMENTS The Contractor shall procure and maintain throughout the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors. The Contractor shall provide current evidence of the required insurance in a form acceptable to the City and shall provide replacement evidence for any required insurance, which expires prior to the completion, expiration, or termination of this Agreement. Nothing in this Section shall be construed as limiting in any way the Indemnification and Hold Harmless clause contained herein or the extent to which the Contractor may be held responsible for payments of damages to persons or property. MINIMUM SCOPE AND LIMITS OF INSURANCE See Special Provisions Specifications for any additional requirements : Commercial General Liability Insurance: CONTRACTOR shall maintain commercial general liability insurance coverage in a form at least as broad as ISO Form # CG 00 01, with a limit of not less than $2,000,000 each occurrence and $4,000,000 policy aggregate. If such insurance contains a general aggregate limit, it shall apply separately to the Agreement (ISO CG 25 03 or CG 25 04) or shall be twice the required occurrence limit. Business Automobile Liability Insurance: CONTRACTOR shall maintain business automobile liability insurance coverage in a form at least as broad as ISO Form # CA 00 01, with a limit of not less than $2,000,000 each accident. Such insurance shall include coverage for owned, hired and non-owned automobiles. Workers' Compensation and Employers' Liability Insurance : CONTRACTOR shall maintain workers’ compensation insurance as required by the State of California and employers’ liability insurance with limits of not less than $1,000,000 each accident. Additional Insurance Requirement - Contractors’ Pollution Legal Liability, and/or Asbestos Legal Liability, and/or Errors & Omissions (if project involves environmental hazards) CONTRACTOR shall maintain project specific pollution or asbestos pollution liability insurance with a minimum limit of $1,000,000 each occurrence and $2,000,000 policy aggregate. If the coverage provided applies to asbestos related losses, the policy shall be endorsed to cover losses caused by either work performed or by any occurrence. Completed operations shall not be limited. If the services involve lead-based paint or asbestos identification/remediation, CONTRACTOR’S pollution liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, CONTRACTOR’S pollution liability policy shall not contain a mold exclusion and the definition of pollution shall include microbial matter, including mold. DEDUCTIBLES AND SELF-INSURED RETENTIONS Any deductible or self-insured retention must be declared to the City. Any deductible or self-insured retention exceeding $5,000 or 5% of the contract value (whichever is less) must be approved by the City. OTHER INSURANCE PROVISIONS The required insurance policies shall contain, or be endorsed to contain, the following provisions: The City, its elected and appointed officials, officers, employees, and volunteers are to be covered as additional insureds with respect to liability arising out of work or operations performed by or on behalf of the Contractor, including materials, parts, or equipment furnished in connection with such work or operations; or with respect to liability arising out of automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used). Coverage shall not extend to any indemnity coverage Source: OpenGov https://procurement.opengov.com/portal/cityoffullerton/projects/320581 Canonical URL: https://govcontractfinder.com/contracts/gregory-area-infrastructure-improvements-opengov-13651712-project-320581