Hangars 1 and 2 Roof Replacement State and local opportunity evaluation City of Lake City 001-2027 Posted: 2026-10-21T12:00:02.433Z Response deadline: 2026-11-19T19:00:00.000Z INVITATION TO BID 001-2027 Sealed bids will be accepted by the City of Lake City, Florida until Thursday, November 19, 2026 at 2:00 pm , local time through the City’s e-Procurement Portal, OpenGov Procurement. Any bids received after the above time will not be accepted under any circumstances. Any uncertainty regarding the time a bid is received will be resolved against the Bidder. Bids will not be accepted through any other means. Bid opening will be promptly at 2:15 PM in the City Council Chambers located on the 2nd floor in City Hall, at which time all bids will be publicly opened and read aloud for the replacement of the existing roofing systems (roof panels and substructure) on: Hangars 1 and 2 Roof Replacement Any deviation from the specifications must be explained in detail under “Clarifications and Exceptions”, as part of the Bidder's Response, and each deviation must be itemized by number and must specifically refer to the applicable specification paragraph and page. Otherwise, it will be considered that items offered are in strict compliance with these specifications and the successful Bidder will be held responsible for meeting the specification. All questions related to this ITB shall be submitted in writing through the OpenGov Procurement Question/Answer Tab via the City's e-Procurement portal, on or before the Question & Answer Submission Date by the Question & Answer Submission Time. Please include the section title for each question, if applicable, to ensure that questions are answered correctly. All questions must be in writing and directed to the Procurement Director. All questions will be answered in writing. Any answers which may alter the scope of work will be answered in the form of addenda. Any and all addenda must be acknowledged through the City's e-Procurement Portal. Deadline for receiving questions is Thursday, November 5, 2026 at 4:00 pm . Questions received after this date and time will not be considered. Bidder may not withdraw his/her bid for a period of ninety (90) days following the opening of the responses. The City of Lake City is exempt from State Use Tax, State Retail Tax, and Federal Excise Tax. The bid price must be net, exclusive of taxes. Bidder’s proposal must be dated, signed by an authorized representative, with title, firm name, address, and telephone number. Local Vendor Preference: City of Lake City Administrative Policy #18 states that the bid of a resident of Columbia County, Florida will have a 5% preference over the bid submitted by any non-resident of Columbia County. A resident is defined as an individual whose primary residence is within Columbia County, Florida, a partnership whose principals are all residents of Columbia County, Florida, a partnership or other business entity whose principal place of business is within Columbia County, Florida, or which maintains a full-time business office open to the public within Columbia County, Florida. With these and other contributing factors, the City Council reserves the right to award a bid or contract in the best interest of the City. Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and city holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the Procurement Department or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response. Any Bidder desirous of protesting a bid for any reason must file a written notice of bid protest with the City Manager’s office within 72 hours following posting of notice of intended award. All protests will be in writing, stating the bid being protested and the specific reason for the protest. All protests will be signed by the Protestor and include all details for a complete and thorough review. The decision of the City Manager, after consultation with the City Attorney will be issued within five (5) working days of the receipt of the protest, unless additional time is agreed upon by all parties involved should circumstances warrant such a delay. By submission of his/her bid, the Bidder certifies that: The bid has been arrived at by the Bidder independently and has been submitted without collusion with any other vendor of materials, supplies, or equipment described in the Invitation to Bid. The contents of the bid have not been communicated by the Bidder, his/her employees or agents, to his/her best knowledge and belief, to any person not an employee or agent of the Bidder or his surety in any bond furnished herewith and will not be communicated to any such person prior to the official opening of the bids. The City of Lake City reserves the right to accept or reject any/all bids and to award the contract in the best interest of the City of Lake City, Florida. CITY OF LAKE CITY, FLORIDA Don Rosenthal City Manager Bid A: Roof Replacement of Roof A Roof Replacement (Excluding Purlin Replacement) Purlin Replacement Bid B: Roof Replacement of Roof B Roof Replacement (Excluding Purlin Replacement) Purlin Replacment Bid C: Roof Replacement of Roof C Roof Replacement (Excluding Purlin Replacement) Purlin Replacement Bid D: Roof Replacement of Roof D Roof Replacement (Excluding Purlin Replacement) Purlin Replacement Alternative 1: Accelerated Building Shutdown Accelerated Building Shutdown-maximum building shutdown period of 60 consecutive calendar days for the entire project (See Section 01 23.00, Alternate No. 1). Alternate applies only if Bids A, B, C, and D are all awarded. Price shall be the added cost only and shall not include the Base Bid amounts. Hangar #2 shall still be completed prior to commencing remaining work. Alternative 2: Full Purlin Replacement Full Purlin Replacement- all existing purlins in Bids A, B, C, and D shall be removed and replaced with new purlins. Price shall be added cost only and shall not include the purlins already accounted for in the Base Bid amounts. Alternative 3: Savings Savings- If Bids A, B, C, and D are all awarded, a deductive amount shall be applied to the combined total to reflect the cost savings associated with completing all four Bids under a single award. Scope of Work and Related Requirements General Scope of Work The City of Lake City intends to undertake a project funded in whole or in part through the Department of Commerce Rural Infrastructure Fund under a Grant Agreement. The Contractor shall comply with all applicable requirements necessary for the City of Lake City to remain in compliance with the Grant Agreement. The grant provides state funding to replace the roofs on Hangars 1 and 2 at Lake City Gateway Airport. (LCQ RIF Grant Agreement D0337_E) Procurement and contracting for all services shall conform to the state and federal regulations, including 2 CFR, Part 200. All records shall be maintained in accordance with state and federal requirements. The City of Lake City is an Equal Opportunity Employer. MBE/WBE/DBE businesses are encouraged to participate. In the event of a tie, if one of the businesses involved in the tie is minority- or female-owned, it shall be ranked above the other firm or firms involved in the tie. In compliance with the Florida Sunshine Amendment and Code of Ethics, the City of Lake City strictly enforces open and fair competition in its ITB's. In accordance with Section 287.133, FS, a person or affiliate that has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal for a contract to provide services to a public entity. A public entity crimes statement is required. Specifications See the bid set attachment for the plans and drawings. See the attached technical specifications. Code and Standards All codes and standards referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications. Permitting The successful contractor shall be responsible for providing all required drawings and specifications required to obtain the appropriate building permits. Permit fees will be paid for by the contractor. The awarded bidder shall secure permits and arrange for inspections as required. Installation A. Overall: Install roofing system in accordance with approved shop drawings and metal roof panel manufacturer's instructions and recommendations, as applicable to specific project conditions; securely anchor components of roofing system in place allowing for thermal and structural movement. 1. Install roofing system with concealed clips and fasteners, except as otherwise recommended by manufacturer for specific circumstances. 2. Minimize field cutting of panels. Where field cutting is required, use methods that will not distort panel profiles. Use of torches for field cutting is prohibited. B. Accessories: Install necessary components that are required for complete roofing assembly, including flashings, gutters, downspouts, trim, moldings, closure strips, preformed crickets, caps, equipment curbs, rib closures, ridge closures, and similar roof accessory items. C. Roof Panels: Install metal roof panels in accordance with manufacturer's installation instructions, minimizing transverse joints except at junction with penetrations. Protection of Property If property is damaged while performing work specified or is removed for the convenience of the work, it shall be repaired or replaced at the expense of the bidder in a manner acceptable to the City of Lake City. Bidder shall notify the Contract Manager for the City of the work site having pre-existing damage before beginning the work. Failure to do so shall obligate the bidder to make repairs as addressed in this solicitation. Bidder shall be responsible for securing all work areas to be safe. All protection requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications. Safety The Contractor shall be responsible for the safe conduct of his/her personnel during the execution of the work detailed herein. The Contractor shall meet or exceed the standards set by the Occupational Safety and Health Administration (OSHA) and requirements established by the Federal, State, and Local agencies. Should an unsafe condition be identified during the execution of this work, the Contractor will immediately suspend such activity until a safe method can be employed. Employees Contractor shall be responsible for the appearance of all working personnel assigned to the project. Personnel shall be clean and appropriately dressed at all times. Personnel must wear proper identification at all times (company shirts, ID badges, etc.) All personnel of the Contractor shall be considered to be, at all times, the sole employees of the Contractor, under the Contractor’s sole direction, and not an employee or agent of the City of Lake City. The Contractor shall supply competent and physically capable employees and the City of Lake City may require the Contractor to remove any employee it deems careless, incompetent, insubordinate, or otherwise objectionable and whose presence on city property is not in the best interest of the City of Lake City. The City of Lake City shall not have any duty to implement or enforce such requirements. Contractor shall assign an “on-duty” supervisor who speaks and reads English. Contractor shall have its employees refrain from the use of tobacco products in the City’s buildings or grounds. Tobacco use will be allowed in designated areas only. Contractor shall be solely responsible for receiving all materials and equipment at the site. Storage of Materials The contractor shall discuss material and/or equipment storage areas with the City Contract Manager. All storage requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications. Disposal of Waste The successful Contractor shall be responsible for the daily disposal of all waste materials, debris, and any and all excess materials, containers, etc. at an off-site location in accordance with local, state and federal regulations. The Contractor shall not use the City dumpsters. Disposal of waste materials shall be in a proper manner in accordance with all environmental guidelines and regulations. Roll-offs will need to be from Waste-Pro. All disposal requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications. Hours of Work The contractor may perform work on this project 24-hour-per-day, seven (7) days per week, including weekends, subject to compliance with all applicable airport, tenant, and safety requirements. Any work activities that may impact airport operations or tenant activities shall be coordinated in advance with the Airport and AAR as required. The Contractor shall remain fully responsible for the supervision, management, and conduct of its employees, subcontractors, suppliers, and all other personnel associated with the Project. AAR will not provide workforce management or direct oversight of Contractor personnel. To facilitate project execution and communication, AAR will provide a senior-level on-site Point of Contact (POC) for each shift. The AAR POC will serve as the primary liaison between AAR and the Contractor's designated representative and will have access to senior management resources, as necessary, to promptly address project-related issues. AAR will also provide security escort services for approved material and equipment deliveries requiring access to AAR-controlled facilities. Deliveries shall be scheduled during AAR's normal delivery window from 7:00 a.m. to 3:00 p.m., Monday through Friday, unless otherwise approved in advance. Weekend or after-hours deliveries may be accommodated on a case-by-case basis, subject to advance coordination and the availability of AAR personnel to provide required escorts. Project Access and Scheduling Summary • Construction Operations: Permitted 24 hours per day, 7 days per week, at the Contractor's discretion. • Material Deliveries: Monday through Friday, 7:00 a.m. to 3:00 p.m. • Weekend or After-Hours Deliveries: Permitted only with advance coordination and subject to AAR escort availability. The Contractor shall coordinate in advance with the Airport and AAR regarding any work activities that may affect airport operations, facility access, tenant activities, or security requirements. Warranty The Contractor agrees that the goods furnished under any award resulting from this solicitation shall be covered by the most favorable commercial warranties the Contractor gives any customer for such goods and that the rights and remedies provided therein are in addition to and do not limit those available to the City of Lake City by any other clause of this solicitation. The Contractor warrants that, unless otherwise specified, all materials and equipment incorporated in this solicitation and under the contract shall be new, in first-class condition, and in accordance with the ITB documents. The Contractor further warrants that all workmanship shall be of the highest quality and in accordance with contract documents and shall be performed by persons qualified in their respective trades. Defects discovered during the warranty period shall be corrected by the Contractor to the City of Lake City’s satisfaction. All warranty requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications. Delivery A. Transport and handle products according to the manufacturer's instructions. B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged. C. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage. D. All delivery requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications. Site Access and Security Requirements Due to the location of work at the City‑operated aviation facility, all contractors shall adhere to strict access, escorting, and safety protocols. 1. Access Control All contractor personnel must check in daily with Airport Operations. Work areas may require escorting depending on operational conditions. Unauthorized entry into aircraft operational zones is prohibited. 2. Identification Requirements All contractor staff must: Wear company uniforms or shirts with logos Display a company‑issued identification badge Present government photo ID upon request 3. Vehicle Rules Contractor vehicles must be registered daily with Airport Operations. Vehicles may only use authorized routes and staging areas. Speed limits and ground movement rules must be followed at all times. 4. Restricted Areas The following are strictly prohibited unless explicitly authorized: Entry into aircraft maintenance bays Interference with airport operations or equipment Access to airfield or aircraft movement areas 5. Safety Compliance Contractors must: Maintain barricades around active work zones Follow all OSHA, FAA airport safety, and local regulations Report safety incidents immediately to Airport Operations and the City Project Manager Failure to comply may result in removal from the site or termination of the contract. Introduction Summary Background Contact Information Timeline Instruction To Bidders Overview The City of Lake City is accepting bids for demolition and removal of the current roof and construction of a new roof on Hangar 1 and 2 . Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic response. Submittal Deadline Bids shall be submitted via the City's e-Procurement Portal, OpenGov Procurement, no later than Thursday, November 19, 2026 at 2:00 pm . Late proposals shall not be accepted. Bids must be submitted via the City's e-Procurement Portal, OpenGov, and may not be delivered orally, by facsimile transmission, or by other telecommunication or electronic means. Pre-Bid Meeting Non-mandatory Pre-bid and site visit will be held on Thursday, October 29, 2026 on site located at Airport Conference Room, located at: 3524 US‑90 East, Lake City, FL 32055 Join Zoom Meeting: https://teams.microsoft.com/meet/228728502661411?p=wcFEhkkJeDlENtR2GX Meeting ID: 228 728 502 661 411 One tap mobile +1 323-694-0852, 887777138# United States, Los Angeles Phone conference ID: 887 777 138# at 10:00 am . Bidders are highly encouraged to attend. Questions All questions related to this ITB shall be submitted in writing via the OpenGov Question/Answer Tab via the City's e-Procurement portal , on or before Thursday, November 12, 2026 by 4:00 pm . All questions submitted and answers provided shall be electronically distributed via email to bidders following this solicitation on the City's e-Procurement Portal. Oral answers given by anyone shall not be authoritative. Addenda The Procurement Department may issue an addendum in response to any inquiry received, prior to the deadline for questions, which changes, adds to, or clarifies the terms, provisions, or requirements of the solicitation. The Bidder should not rely on any representation, statement, or explanation whether written or verbal, regardless of the source, other than those made in this solicitation document or in any addenda issued. Where there appears to be a conflict between this solicitation and any addenda, the last addendum issued shall prevail. Bidders will be notified by email when any addendum are issued. It is the Bidder's responsibility to ensure receipt of all addenda and any accompanying documentation. The Bidder is required to acknowledge receipt of the add Source: OpenGov https://procurement.opengov.com/portal/lcfla/projects/281736 Canonical URL: https://govcontractfinder.com/contracts/hangars-1-and-2-roof-replacement-opengov-388-project-281736