HVAC Equipment Replacement – Aurora RT25 Transportation Center State and local opportunity evaluation City of Aurora, IL 26-100 Posted: 2026-10-26T20:56:08.893Z Response deadline: 2026-11-18T17:00:00.000Z The City of Aurora is soliciting bids from qualified contractors for the replacement of the existing air-handling unit and condensing unit at the Aurora 25 Transportation Center. The Work shall include the removal and proper disposal of the existing equipment and the furnishing, installation, connection, testing, and startup of the new equipment, including all labor, materials, equipment, and incidentals necessary to provide a complete and fully operational HVAC system in accordance with the Bid Specifications. Replacement of Air Handler and Condensing Unit Description: Proposed Make/Capacity Air Handler: One (1) Carrier Air Handler, Model 40RLA25T3A6-UAOAO. Condensing Unit: One (1) Carrier Model 38ACD725A0A6-OOA00, dual-circuit, three (3) stage, condensing unit, 20-ton capacity. Labor and Materials Labor and Materials SCOPE OF WORK Replacement of Air Handler and Condensing Unit at the Aurora RT 25 Transportation Center Project and Scope Replacement of the air-handling unit and condensing unit located in the east lobby of the Aurora RT25 Transportation Center at 233 N. Broadway, Aurora, IL. The Contractor shall furnish all labor, materials, equipment, tools, transportation, supervision, permits, inspections, testing, disposal, and incidentals necessary to remove the existing air-handling unit and condensing unit and provide a complete, fully operational replacement HVAC system in accordance with the Contract Documents, manufacturer requirements, and all applicable codes and regulations. Existing Equipment to Be Replaced Air Handler: Trane Model BWH240B400DA, Serial No. BE24179068 Condensing Unit: Trane Model TTA240E40RAA, Serial No. 11415R4XTA, 20-ton capacity Equipment information provided by the City is for reference. The Contractor shall field verify existing conditions, dimensions, capacities, electrical characteristics, connections, clearances, access requirements, and other conditions affecting the Work prior to ordering equipment or commencing installation. Removal and Disposal Disconnect and remove the existing air-handling unit and condensing unit. Recover, handle, transport, and dispose of existing refrigerant in accordance with all applicable federal, State, and local requirements. Remove existing refrigerant piping, electrical components, controls, sheet-metal connections, supports, and other components as necessary to accommodate the new installation. Protect existing building components and systems that are to remain. Properly dispose of or recycle all removed equipment, materials, refrigerant, and debris in accordance with applicable requirements. Repair damage to existing building components resulting from the Contractor's operations. New Equipment to be Installed Air Handler: One (1) Carrier Air Handler, Model 40RLA25T3A6-UAOAO. Condensing Unit: One (1) Carrier Model 38ACD725A0A6-OOA00, dual-circuit, three (3) stage, condensing unit, 20-ton capacity. Installation shall include: • New refrigerant lines and insulation between the condensing unit and air handler. • All required sheet metal transitions needed for proper airflow. • All necessary electrical work, including installation of properly sized breakers, wiring, and a new disconnect. • Installation of liquid line driers, thermostat, controls, and all accessories needed for a complete system. • Modifications to existing ductwork, refrigerant piping, electrical connections, controls, and condensate piping as required for the new equipment. • Routing new refrigerant piping up the exterior wall and enclosing it in line‑hide. • Repair of any drywall impacted by installation. • Sealing all ductwork connections and any penetrations created or affected by the work. System Startup, Testing, and Balancing • Evacuate the refrigerant system. • Charge the system with R‑454B refrigerant per manufacturer specifications. • Start, test, and balance the new system to confirm proper airflow, temperature, drainage, and overall operation. • Complete all manufacturer-required startup procedures and provide documentation. Equipment Rental Responsibilities The contractor shall be fully responsible for providing and coordinating all equipment necessary to perform the removal, installation, and commissioning of the units. This includes, but is not limited to: • Rental of lifting equipment such as cranes, boom lifts, scissor lifts, forklifts, or hoisting devices needed to safely remove and set the units. • Rental of any specialized HVAC installation equipment needed for piping, electrical, or sheet metal work. • Delivery, setup, operation, and teardown of all rented equipment. • Ensuring all rented equipment meets safety standards and is operated by properly trained personnel. • Coordination of any required street closures, permits, or staging areas needed for equipment operation. • All costs associated with rental equipment, delivery, and operation shall be included in the total project price. Cleanup and Documentation • Maintain the Work area in a clean and safe condition throughout the project. • Remove debris, packaging, surplus materials, and removed equipment from the site • Restore areas disturbed or damaged by the Work to a condition equal to or better than the condition existing prior to commencement of the Work. • Perform final cleaning of the Work area upon completion. Closeout Documentation and Warranty Prior to Final Acceptance, the Contractor shall provide the City with: Manufacturer equipment warranties. Contractor workmanship warranty. Equipment operation and maintenance manuals. Manufacturer product and technical data. Completed startup and commissioning reports. Testing and balancing documentation. Copies of required permits and final inspection approvals. Equipment model and serial number information. Applicable control documentation and operating instructions. Applicable labor and equipment warranties Any other closeout documentation required by the Contract Documents All work shall comply with manufacturer requirements and all applicable building, mechanical, electrical, environmental, and safety codes. Completion Timeframe: January 2027 - March 2027 GENERAL INFORMATION CITY OF AURORA, IL (Government) The City of Aurora (“City”) is a municipal corporation and unit of local government existing under the laws of the State of Illinois pursuant to the Illinois Municipal Code, 65 ILCS 5/1-1-1 et seq. (the “Code”). The City was established to provide municipal services and to promote the health, safety, and welfare of its residents and businesses within its jurisdiction. The City owns, operates, and maintains various public facilities and infrastructure, including municipal buildings, parks, and community centers located throughout Aurora, Illinois. INSTRUCTIONS TO BIDDERS SUMMARY The City of Aurora is soliciting bids from qualified contractors for the replacement of the existing air-handling unit and condensing unit at the Aurora 25 Transportation Center. The Work shall include the removal and proper disposal of the existing equipment and the furnishing, installation, connection, testing, and startup of the new equipment, including all labor, materials, equipment, and incidentals necessary to provide a complete and fully operational HVAC system in accordance with the Bid Specifications. TIMELINE Release Project Date: October 26, 2026 Pre-Proposal Meeting (Mandatory): November 10, 2026, 11:00am Aurora Transportation Center 233 N. Broadway, Aurora, IL 60505 Question Submission Deadline: November 13, 2026, 11:00am Question Response Deadline: November 16, 2026, 5:00pm Response Submission Deadline: November 18, 2026, 11:00am Purchasing Division Definitions Award: The formal decision to select a vendor for a contract. Bid: A submitted response by a vendor in response to a bid document. Bidder: An individual, firm, or corporation formally submitting a proposal for the work contemplated, or any portion thereof, acting directly through an authorized representative. Change Order: A change to a contract or purchase order made after it has been approved by the city that alters the term of the contract, the contract price, or the obligations of the parties. Contract: A formal agreement between the City and a successful bidder outlining obligations, deliverables, timelines, and pricing. Cooperative Purchasing: When goods or services are purchased through shared contracts (mostly government entity contracts), to leverage buying power. Direct Purchase Method: The method in which, after bids are rejected or if no bids are received, the City Council by resolution may approve the work to be done by city personnel or authorize the purchase of goods or services involved to be purchased more economically on the open market without complying with the requirements of the Purchasing Division. Emergency Procurement: An expedited purchase that bypasses standard bidding due to immediate threats to public health, safety, or welfare. Encumbrance: Funds that are formally committed and set aside in the budget to pay for a specific future purchase. Evaluation Criteria: The standards and scoring factors used to assess bids or proposals. Formal Bid: For goods/services over $25,000, with well-defined requirements and structured bidder/proposal submissions. Informal Bid: For goods/services valued between $5,000 and $24,999, with well-defined requirements. Businesses are notified via web alerts. Invitation for Bid (IFB): A formal solicitation inviting vendors to submit competitive bids based strictly on price and predefined specifications. Invoice: A bill sent by a vendor/contractor/supplier for goods/services provided. Shows what was purchased, how much it costs, and payment due date. Local Bidder Preference: Policy that allows the City to give priority or scoring advantages to local businesses. Lowest Responsible Bidder: The lowest bidder whose offer best responds in quality, fitness and capacity to the requirements of the proposed work or usage. Payment Bond: The bond executed by the Vendor/Contractor and his surety guaranteeing the payment of all sums of money due for any labor, materials, apparatus, fixtures, or machinery furnished to such principal for the purpose of performing the contract work. Performance Bond: The bond executed by the Vendor/Contractor and his surety, guaranteeing complete execution of the contract. Piggybacking: An authorized purchase made by utilizing another government agency's existing, competitively awarded contract. Plans: All drawings, sketches, and detailed Plans or reproductions thereof pertaining to the construction involved. Procurement: The process by which a municipality acquires goods, services, or construction, including planning, soliciting offers, evaluating responses, awarding contracts, and managing vendor performance. Professional Services: Services that require specialized professional knowledge or expertise, such as accounting, architecture, engineering, law, medicine, surveying, or other fields defined by state law. Proposal: A bidder’s response to a solicitation that often includes technical details, methodology, pricing, and qualifications. Public Notice: Official announcement of a solicitation, typically published through OpenGov. Purchase/Procurement Card (P-card): A City issued charge card for the purchase of city-related goods/services. Purchase Order (PO): The formal authorizing document issued after an award. No work begins, or payment made, without a city-generated PO. Sent to Vendor/Contractor/Supplier. Quote: Request from vendors for pricing on goods or services or a combination thereof that may be verbal or in writing. Request for Proposals (RFP): A solicitation used when seeking a solution, goods, or service and evaluating vendors based on multiple criteria, not only price. Request for Qualifications (RFQ): A solicitation for qualifications, used especially for professional or consultative services. It does not result in a contract. Requisition: A request to create a PO for the purchase of goods/services. Stays internal. Responsible Bidder: Section 2-331(5) of the Aurora City Code requires that bidders for city contracts in excess of $25,000 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. Scope of Work (SOW): A detailed document outlining the specific tasks, deliverables, timelines, and quality standards required from the vendor. Sole Source: A non-competitive procurement used when only one vendor can provide the required goods or services. Specification: Any description of the physical or functional characteristics, or of the nature of a supply, service or construction item. A specification may include a description of any requirement for inspecting, testing, or preparing a supply, service, or construction item for delivery. Vendor/Contractor/Supplier: A company or individual that enters into a contract with the City to provide goods or services. ACCEPTANCE OF BID PROPOSALS a. Bidders intending to respond to this solicitation must create a free account with OpenGov Procurement . Registration is required to establish a communication link with the City. The Bidder, and not the City, is solely responsible for obtaining all addenda issued for this solicitation. Addenda and other relevant information will be posted through the City’s E-Procurement System. Notifications of issued addenda will be emailed to all persons registered as following this bid. Failure of any Bidder to receive any addendum or interpretation shall not relieve the Bidder of any obligation under its submitted Bid Proposal. All addenda issued shall become part of the Contract Documents. Paper submissions will not be accepted . b. Bids will be accepted only through the City’s E-Procurement System, OpenGov, up to the date and time specified in the solicitation. The official system clock within the City’s E-Procurement System shall govern all submission deadlines. Late submissions will not be accepted under any circumstances, including technical difficulties such as internet connectivity issues. The City strongly encourages Bidders to complete submissions well in advance of the deadline. All bids must include all requested information and all required forms, certificates, affidavits, and addendum acknowledgments to be considered responsive. c. Bids shall be submitted on the forms provided and must include all required information and certifications. Bids submitted in any other manner, or failing to include all required information or certifications, may be rejected as non-responsive. Bids may be modified or withdrawn prior to the bid opening deadline through the City’s E-Procurement System. Each Bid shall include the legal name of the Bidder, complete mailing address, and electronic signature of a person legally authorized to bind the Bidder. The printed or typed name of the authorized signer shall also be provided. d. The City of Aurora reserves the right to accept or reject any or all bids, in whole or in part, to accept alternate bids, and to waive any immaterial defect, technicality, informality, or irregularity in any bid received. Unless otherwise specified, the City reserves the right to hold bids for ninety (90) days following the bid opening date. By submitting a bid, the Bidder agrees to accept a Notice of Award if issued within this ninety (90) day period. The City further reserves the right to cancel this solicitation at any time without liability for any costs incurred by any Bidder in preparing or submitting a Bid Proposal. Each Bidder assumes sole responsibility for all costs associated with preparation and submission of its Bid Proposal. e. While price is an important consideration, the City will also evaluate qualifications, experience, demonstrated capacity, responsiveness to the solicitation requirements, and overall ability to successfully perform the Work. No Bid Proposal will be considered unless the Bidder provides evidence satisfactory to the City demonstrating the necessary facilities, experience, equipment, personnel, and financial resources required to perform the Work. The Bid will be awarded to the lowest responsive and responsible Bidder. In determining responsibility, the City may consider factors including, but not limited to: Prior performance history Experience on similar projects Ability to work cooperatively with the City Adequacy of equipment and staffing Ability to complete the Work within required timeframes Reliability, reputation, competency, and available resources The City and its representatives may conduct any investigation deemed necessary to evaluate a Bidder’s qualifications. The Bidder shall furnish all information requested by the City for this purpose. RECEIPT OF BID PROPOSALS Bids must be submitted electronically , up to, but no later than the designated date and time as specified via the City’s E Procurement System, OpenGov. It is the sole responsibility of the Bidder to see that their Bid Proposal is received in the proper time. Bids must be submitted electronically via the City’s E Procurement System. There will be no exceptions! WITHDRAWAL OF BID PROPOSALS Bids may be withdrawn at any time prior to the submission deadline through the City’s E-Procurement System by “un-submitting” the proposal in OpenGov. After withdrawal, the Bidder may revise and resubmit its proposal at any time prior to the submission deadline. Bidders are strongly encouraged to carefully review their submissions before final submission. Negligence on the part of the Bidder in preparing a bid shall not confer any right to withdraw or modify the bid after the submission deadline. No bid may be withdrawn after bid opening without the written approval of the Director of Purchasing. Requests for withdrawal after bid opening must be submitted in writing by an authorized representative of the Bidder. Bid Proposals received after the date and time specified for submission will not be opened or accepted. BID DEPOSIT Each Bidder shall deposit with Bid a Bid guarantee consisting of a bank draft, Bid bond, cashier’s check, or certified check drawn on a good and solvent National or State Bank and payable to the order of the City, in an amount not less than ten percent (10%) of the total amount of the Bid submitted, as a guaranty that in case the Bidder’s Bid is accepted, the Bidder shall within one day after the date of such acceptance and notification thereof, deliver to the City a contract signed and executed by the Bidder, proper insurance certificates and a Performance and Payment Bond in one hundred percent (100%) of the contract sum furnished by a responsible bonding company acceptable to and written upon forms prepared or approved by the City as security for payment of labor and materials and for the faithful performance of the contract and compliance with the provisions of law relating to the payment of prevailing rate of wages. Bid Deposit MUST be uploaded electronically with submission through the City’s E Procurement System, OpenGov. Upon notification from the City, Bidder’s must deliver ORIGINAL Bid Deposit within three (3) business days. All Bid deposits will be retained by the City until a Bid award is made, at which time the Bid deposit will be promptly returned to the unsuccessful Bidders. The Bid deposit of the successful Bidder will be retained until the equipment, goods or services have been received or completed and found to be in compliance with the specifications. Performance by the Bidder shall not be considered complete, until final inspection and acceptance by the City of the Bidder’s Work. Final inspection shall occur within 30 days after Source: OpenGov https://procurement.opengov.com/portal/aurorail/projects/305229 Canonical URL: https://govcontractfinder.com/contracts/hvac-equipment-replacement-aurora-rt25-transportation-center-opengov-13915630-project-305229