HVAC Heat Pump Installation and Light Weatherization for Multifamily Housing - Chaparral Senior Housing ReSolicitation (Plugged In For Good) State and local opportunity pending City of Las Cruces 26-27-056 Posted: 2026-11-13T16:53:51.235Z Response deadline: 2026-11-24T23:00:00.000Z The City of Las Cruces ("City"), a New Mexico Municipal Corporation, is soliciting proposals from qualified firms interested in entering into an agreement for Heating, Ventilation, and Cooling (HVAC) Heat Pump Installation and Light Weatherization services for Chaparral Senior Housing, a multifamily housing complex participating in the Plugged In For Good (PIFG) initiative. SCOPE Scope of Work The City has a dedicated Energy Navigator who coordinates resident scheduling, delivers technology and program education, and guides participants through the program process. The Energy Navigator serves as the primary point of contact between contractors and residents and must be kept informed of all work occurring in each unit. The selected contractor will collaborate with the Energy Navigator to address resident inquiries, align installation scheduling, and provide progress updates. The awardee shall provide comprehensive HVAC heat pump installation services and light weatherization retrofit services for all forty (40) units (as budget allows) at Chaparral Senior Housing, a multifamily housing complex serving low-income senior renters in Las Cruces. All work shall be performed in strict compliance with applicable federal, state, and local laws; program requirements for the EECBG Program and CEED Program; and City of Las Cruces standards Project Delivery Framework Work shall be completed using a phased delivery approach as outlined below. A. Pre-Construction Review and Coordination The Contractor shall conduct a comprehensive review of all City-provided documentation to establish a clear understanding of each participating unit's conditions, proposed measures, and program requirements. Deliverables: Confirmation of review of all four (4) energy audits and preliminary scopes of work Identification of any inconsistencies, gaps, or items requiring clarification B. Site Assessment and Scope Finalization The Contractor shall perform on-site assessments and must coordinate with Carlos Reyes from Tierra Del Sol prior to work on all 40 units to verify existing conditions, confirm energy audit findings, and finalize property-specific scope of work for each unit. Deliverables: Coordination with the Energy Navigator to schedule site assessments Documentation of completed site visits for all 40 units Final, property-specific scopes of work based on verified conditions and audit recommendations Itemized cost estimates aligned with CEED cost caps and available funding of EECBG C. Scope Approval and Schedule Development The Contractor shall obtain formal approval of all scopes of work, develop a detailed project schedule, and coordinate partner requirements prior to construction. The project is expected to be completed within approximately six (6) to nine (9) months following notice to proceed. The City welcomes proposals that demonstrate the ability to complete the work in a shorter timeframe, where feasible. Response Requirement Provide a detailed project timeline for completing work across all 40 units, including the proposed sequence of work by trade or measure type (e.g., weatherization, HVAC upgrades). Work on HVAC must be completed in one (1) day and have a unit working for the tenant. Deliverables: Final scopes of work submitted to and approved by PIFG program staff Written authorization to proceed from PIFG program staff Project schedule and anticipated completion dates aligned with the expected six (6) to nine (9) month project duration Timelines and required submittals D. Permitting and Implementation Following approval of the scope and schedule, the Contractor shall secure all required permits and implement retrofit work in compliance with approved plans, applicable codes, and program requirements. Deliverables: Approved electrical and mechanical permits and inspection records Completed retrofit installations in accordance with the approved scope and schedule Installation of Energy Efficiency Measures The Contractor shall furnish all labor, materials, equipment, supervision, and coordination necessary to install approved energy efficiency measures in accordance with the finalized scope of work, program requirements, and applicable codes. A. Building Envelope and Weatherization Installation may include, but is not limited to, air sealing and envelope improvements such as weather-stripping, caulking, duct sealing, hole patching, door sweeps, threshold repairs or replacement, fireplace damper repairs, exterior door and window repairs, and other measures necessary to maintain the integrity and performance of installed energy conservation measures. Certain measures will need to be completed following the removal of existing HVAC equipment. Verification of air sealing measures will require a final blower door test and documentation of results. Insulation measures may include the installation or upgrade to improve thermal performance and reduce energy loss, consistent with audit recommendations and program requirements. B. LED Lighting and Controls Installation may include LED lighting and smart thermostats, as identified in the approved scope of work. LED upgrades shall utilize ENERGY STAR® or equivalent products, and smart thermostats shall be installed, configured, and demonstrated to residents to support energy savings and system performance. Installation of Heat Pumps The Contractor shall furnish all labor, materials, equipment, supervision, and coordination necessary to install ductless mini split heat pump systems in accordance with the finalized scope of work, program requirements, and applicable codes. A. HVAC Heat Pump Installation Installation shall consist of ductless mini split dual zone heat pump equipment sizing, wiring, and installation to serve the 25 designated units, per the following: Site Evaluation and Equipment Selection Conduct a thorough inspection of each unit to determine specific HVAC requirements and complete equipment sizing using a Manual J load calculation (or equivalent) Install 1.5 ton ductless mini split heat pump equipment and wiring meeting or exceeding the Seasonal Energy Efficiency Ratio 2 (SEER2) 1 8 and Heating Seasonal Performance Factor (HSPF) 8.7 ratings indicated on the cost proposal worksheet ( Section 9. Vendor Questionnaire Item 11.1 Cost Proposal ) Install should be one (1) head in the living room and one (1) in the bedroom System Installation Remove wall furnaces, patch and paint where wall heaters are removed Cancel the gas where the wall heaters were located Remove existing HVAC units and related components as needed. T ierra Del Sol will coordinate pick up of old units. Ensure proper system decommissioning, including refrigerant capture and disposal. Provide a decommissioning checklist ( see attached example titled Attachment "A" Checklist Examples ) to the PIFG program demonstrating completion of associated tasks for each unit. Install new HVAC heat pump systems per manufacturer's requirements and local codes Provide and install air handlers, thermostats, and controls where specified Set up all required electrical and refrigerant connections Install condensate drains and ensure proper venting, as required Supply and install all registers, grilles, and associated hardware Response Requirement Provide a description of the proposed technical approach for sealing the existing duct work after decommissioning the HVAC. The details should be provided as a response to Technical Proposal Content (section 5.1.a.) System Testing, Commissioning, and Training Commission all newly installed systems and verify performance metrics Balance airflow and calibrate controls for occupant comfort and efficiency Demonstrate system operation, provide owner manuals and training to occupants, and share information about system maintenance schedules Health and Safety Measures The Contractor shall address health and safety conditions necessary to enable retrofit work or mitigate hazards, including but not limited to: Ventilation improvements to support indoor air quality (e.g., bathroom and kitchen exhaust fans, ductless and ducted kitchen range hoods) Combustion safety testing and remediation (e.g., carbon monoxide [CO], draft, leak) Purchase and i nstallation of required safety devices (e.g., CO and smoke detectors) Quality Control & Warranty The Contractor shall ensure that all installations meet applicable program standards, manufacturer specifications, and accepted industry practices. Deliverables: A minimum 10 year parts/ equipment warranty and minimum 12 month labor warranty following completion of installation. The Contractor shall remedy any defects identified during the warranty period at its own expense. The Contractor must submit the following documentation to PIFG program staff upon completion of each installation: Clearance from Carlos Reyes with Tierra Del Sol after walk through completion Receipts for all equipment purchases valued at $5,000 or more Receipts for all supply purchases valued under $5,000 Invoices for installation labor Photos of the installation per unit (for the heat pumps) Must include time stamped photos with location data Location information for each installation site O peration and maintenance manuals (two [2] per apartment) to include cont act name, serial numbers and model numbers Manufacturer name and contact number Manufacturer warranty & Contractor warranty Grants, Reporting, and Administrative Compliance The Contractor shall fulfill all administrative, reporting, and compliance obligations associated with federal and state funding requirements. Deliverables: Confirmation of active registration on the System for Award Management site at SAM.gov prior to contract award Weekly Davis-Bacon wage reports submitted via LCPtracker, including certified payrolls, fringe benefits, and hours worked. Awardee must complete Davis-Bacon reporting training (compensated) prior to the start of work. Records demonstrating compliance with Davis-Bacon and Related Acts requirements for all subcontractors Complete and accurate grant documentation submitted in coordination with PIFG program staff and participating residents Submit receipts and invoices within thirty (30) days of equipment installation Cleanup and Disposal The Contractor shall remove and properly dispose of all installation debris and materials in accordance with applicable local, state, and federal requirements. For retired equipment (HVAC units and wall furnaces), the Contractor shall coordinate with Tierra Del Sol for pickup and ensure equipment is ready for collection, including completion of refrigerant capture. The Contractor shall restore any areas of the unit impacted by installation activities to their original condition. Deliverables: Documentation confirming removal and proper disposal of installation debris Confirmation that impacted areas of each unit have been restored following installation GENERAL The City of Las Cruces (City), a New Mexico Municipal Corporation, is soliciting proposals from qualified firms interested in entering into an agreement for HVAC Heat Pump Installation and Light Weatherization for Multifamily Housing - Chaparral Senior Housing ReSolicitation (Plugged In For Good) as described herein. Responses to this solicitation must be received by Tuesday, November 24, 2026 / 4:00 pm via the OpenGov Procurement Portal subject to requirements and conditions of the enclosed General Conditions of Proposing. The conduct of this procurement is subject to the City Procurement Code, Chapter 24 of the Las Cruces Municipal Code (LCMC), 1998, incorporated herein by reference. City Contact: Except for: Communications during any pre-proposal conference conducted by the City for this solicitation, Any related interviews initiated by the City, Any related negotiations initiated by the City, and, to ensure information is consistent to all prospective respondents, any direct or indirect contact with City elected officials or City staff, other than the City Purchasing Section staff, relating to this solicitation is strictly prohibited during this solicitation process until contract award. Upon such finding, the violating party will be deemed non-compliant and a proposal from such party will not be considered for award. The agreement to be entered for the proposed services will be in a format acceptable to the City and awarded firm. The agreement will be from the date of award through July 3, 2027. The City intends to award to the highest-ranking firm to meet its need for services based upon the criteria herein. BACKGROUND The City supports the PIFG initiative, which connects low-income senior renters with energy upgrades that improve affordability and comfort while reducing emissions. Through PIFG, the City has partnered with Chaparral Senior Housing and Tierra Del Sol to stack and braid funding for a multifamily retrofit project at Chaparral Senior Housing, a 40-unit complex of one-bedroom, one-bath quadplexes located at 2350 Nevada Avenue, Las Cruces, New Mexico 88001. The City is soliciting proposals from qualified contractors to install heat pump HVAC equipment and complete light weatherization improvements across the property. Services will be delivered through the Energy Efficiency and Conservation Block Grant (EECBG) Program and the Community Energy Efficiency Development (CEED) Program, and future applicable programs. The CEED Program was established under the New Mexico Community Energy Efficiency Development Act (New Mexico Statutes Annotated NMSA 62-17A-1) to support energy-efficiency upgrades that reduce household energy burdens and strengthen public health and environmental resilience. Accordingly, all work performed under the program must comply with rule New Mexico Administrative Code (NMAC) 19.1.10. The City prioritizes equitable access, quality installations, and measurable benefits for participating households. Current Program Status PIFG funding along with Tierra Del Sol funding will cover heat pump HVAC installations. PIFG funding separately covers light weatherization measures including but not limited to air sealing following gas wall furnace removal, door sweeps and weather-stripping, and light-emitting diode (LED) lighting — across all 40 units as budget allows. This can also include health and safety measures like installing smoke detectors or fixing vent hoods and exhaust fans. Energy audits have been completed for four (4) units (see the attached documents to find those audits), and a preliminary scope of work has been developed to guide contractors in understanding anticipated upgrade requirements. Work onsite related to weatherization and HVAC will be overseen by Tierra Del Sol Housing Corporation to include inspections, progress, and completion. The City is seeking one entity capable of delivering high-quality, code-compliant, and program-eligible retrofits in coordination with City staff and program administrators. The selected entity will also act as the main point of contact for the City and oversee subcontractor work. INSURANCE REQUIREMENTS The awarded firm(s) shall obtain and maintain insurance at its own cost and expense during the life of the Agreement, and shall require Subcontractors, if any, to maintain during the life of his subcontract: Commercial General Liability Insurance $1,000,000 per occurrence / $2,000,000 aggregate Coverage must include premises and operations, products and completed operations, and personal and advertising injury. The City must be named as an additional insured for all coverages listed above on endorsements acceptable to the City. Coverage must be primary and non-contributory. Coverage must be per project or per location. Coverage must be on an occurrence form. Subrogation must be waived. Commercial Auto Liability $1,000,000 per occurrence Coverage must be for “owned, leased, hired, and non-owned autos” or “any autos.” Workers’ Compensation and Employers Liability Statutory limits Employer liability – $1,000,000 each accident, $1,000,000 each employee by disease, $1,000,000 policy limit Subrogation must be waived. Sexual Abuse and Molestation Liability Insurance The CONTRACTOR shall maintain Sexual Abuse and Molestation Liability Insurance covering damages arising out of actual, alleged, threatened, or perceived physical abuse, mental injury, sexual abuse, sexual molestation, or sexual misconduct, including claims for negligent hiring, employment, supervision, training, investigation, reporting to proper authorities, failure to report, an detention of any person for whom the CONTRACTOR is responsible, including CONTRACTOR’S employees, agents, volunteers, and subcontractors. A. $1,000,000 per claim / $2,000,000 aggregate Additional Insurance Information The CONTRACTOR must immediately notify the CITY if insurance is canceled or not renewed. The City must be named as additional insured – this coverage must be as broad as the coverage provided to the insured; coverage must be primary and non-contributory before any other insurance or self-insurance. A copy of the endorsement(s) for this coverage must be provided as a condition of the Agreement. Waiver of Subrogation will apply and shall be noted on the certificate. CONTRACTOR shall furnish the CITY with a certificate(s) of insurance showing CONTRACTOR and Subcontractors, if any, have complied with this Article. The CONTRACTOR shall provide insurance certificates before work is to start on the project and shall provide the CITY thirty (30) days written notification of cancellation of such policies. PROPOSAL CONTENT The proposal must include a confirmed RFP COMPLIANCE DECLARATION (located within the Vendor Questionnaire). Failure to confirm the RFP COMPLIANCE DECLARATION will subject the response to rejection. Technical Proposal Content The respondent’s Technical Proposal shall include the following items, and in the sequence presented: To address Evaluation Criteria No. 1 (Technical approach) below, Provide description of the proposed technical approach of all professional, technical and customary services provided, Major tasks to be accomplished with detailed descriptions, and A project time schedule for completing work across all 40 units with proposed sequencing by measure type (e.g., weatherization, HVAC upgrades), and anticipated duration per unit. Proposers may include a sample unit with an illustrative scope of work to demonstrate sequencing approach. To address Evaluation Criteria No. 2 (Qualifications/competence) below, Provide the names of key personnel who will be assigned to provide the services described herein. For each person listed, a description of experience, areas of competence and percent of time assigned to the project shall be provided, Name, address, telephone number, of the principal member/officer of the firm responsible for administration of the contract. If applicable, list of subcontractors, including addresses, qualifications and areas of responsibility. Name, address, and New Mexico registration (if applicable) of the professional responsible for and in direct charge of the work. Describe prior experience administering similar grant-funded projects or complying with Davis-Bacon and Related Acts wage requirements. This may include the funding source, scope of work, and role in managing compliance and reporting obligations, as described in Section 3.5. To address Evaluation Criteria No. 3 (Performance of the firm) below, provide the following: Description and name of a total of three past contracts similar to the scope herein that have been completed by the firm including the name and telephone number of the contact person for each project. Scoring will be based on three successfully completed reference checks, worth a maximum of five points each, for a maximum possible total of 15 points. Unsuccessful/non-responsive reference checks will be worth zero (0) points. To address Evaluation Criteria No. 4 (Cost) below, p Source: OpenGov https://procurement.opengov.com/portal/las-cruces/projects/324690 Canonical URL: https://govcontractfinder.com/contracts/hvac-heat-pump-installation-and-light-weatherization-for-mul-opengov-3099-project-324690