Installation of Ductile Iron Water Mains in Catalina Ave - WD-27-01 State and local opportunity open City of Pasadena 2026-IFB-LM-0568 Posted: 2026-11-05T00:17:12.973Z Response deadline: 2026-12-10T20:00:00.000Z The City of Pasadena Water & Power Department (Water) is seeking bids from qualified contractors to install new ductile iron water main and related appurtenances to replace existing water main in Catalina Avenue. The Work covered in this Specification is located in Catalina Avenue from Corson Street to California Boulevard in the City of Pasadena, California. This project is funded in part through Water Infrastructure Finance and Innovation Act (WIFIA) loan funds from the U.S. Environmental Protection Agency (EPA) that are subject to Build America, Buy America Act requirements. Additional terms related to WIFIA are given as an attachment that requires mandatory compliance, and more detail can be found at: https://www.epa.gov/wifia/wifia-federal-requirements. Vendors are responsible for upholding these requirements and meeting compliance. Bid Specifications LOCATION OF WORK The Work covered in this Specification is located in Catalina Avenue from Corson Street to California Boulevard in the City of Pasadena, California. SCOPE AND CHARACTERISTICS The Contractor shall furnish all labor, material, equipment, apparatus, transportation, and all other services necessary and incidental to the construction of underground water main line, water services, fire hydrants, abandonment, and other miscellaneous work complete in place, as shown on the contract drawings of the Water and Power Department and in these Specifications, including but not limited to: A. Providing approved traffic control plans and traffic control for the duration of the project. B. Providing potholing services for the identification of existing site conditions and utilities. C. Providing construction surveying. D. Removal of existing and replacement with new street pavement, temporary and permanent, including concrete sections. E. Excavation, backfill, and shoring of excavation where required. F. Removal, installation, and/or relocation of water mains with valves, tees, tapping sleeves, and other appurtenances complete in place as shown on the contract drawings and Specifications. G. Installation of new domestic and fire service laterals, and reconnection of existing domestic water services, fire services, and fire hydrants. H. Installation of new fire hydrants. I. Abandonment of existing water mains, water services, fire hydrants, and other miscellaneous items. J. Clean-up and miscellaneous housekeeping work as directed by the General Manager or his/her authorized representatives. K. Replacement of sidewalks, driveways, curbs, and gutters in accordance with the Standard Specifications, the Pasadena Supplements, and City of Pasadena Standard Plans. L. Reinstalling all traffic striping, markings, raised pavement markers, and traffic loop detectors. M. Compliance with the federal requirements in Section 9.43. STANDARD PLANS DRAWINGS AND CONTRACT DRAWINGS The following Standard Plan Drawings, provided as attachments, shall be referred to during installation: City of Pasadena Public Works Department Standard Drawings S-207 Concrete Base for Valve Cover S-299 (1&2) Supporting Water Pipes Encountered During Excavation Operations S-301 Saddle for House Laterals S-402 Driveway – Curb Return Type S-403 (1&2) Driveway - Dustpan Type S-406 Curb and Gutter S-407 (1&2) Trench Compaction Requirements S-414 (1,2&3) Wheelchair Ramp S-415 Asphalt Concrete Street Resurfacing, Removal, Reconstruction, and Cold Milling S-416 (1,2,&3) Restoration of Asphalt Street Excavations S-417 (1&2) Restoration of Concrete Street Excavations S-420 PCC Cross Gutter S-421 (1&2) PCC Sidewalk S-422 (1,2&3) PCC Pavement Jointing and Details S-425 Address Painting on Curb Face S-426 Minimum Public Safety Requirements for Open Excavations S-702 Turn Bay Transition – Single Double Centerline S-704 Parking Tee Installation S-705 Slow School Xing Pavement Markings S-706 Pedestrian Crossing Pavement Markings S-709 (1&2) Crosswalk Installation S-710 (1,2&3) Raised Pavement Marker Installation Detail S-711 Two-Way Left Turn Lane, Single Yellow Centerline, Solid White Lane Line S-712 Pavement Markings for Left and Right Turn Lanes S-713 Limit Line and Stop Pavement Markings S-714 Layout – 10' Wide Turn Bay Transition S-976 Circular Inductive Loop Installation Pasadena Water and Power Standard Drawings C-1327 Fire Hydrant Installation W-101 1-inch Water Service Installation W-102 2-inch Water Service Installation G-709 (1&2) Standard Blowoff Details G-910 (1&2) Gate & Blowoff Cans & Covers G-998 Gate Can Top Section for S-207 Gate Cans G-1225 (1&2) 9" Water Valve Box G-1226 Concrete Encasement for Water Mains G-1227 Vacuum & Air Release Valve Enclosure Detail G-1228 2-inch Combination Air Release & Vacuum Relief Valve G-1229 Thrust Block APWA 225-1 Blanket Protection for Pipes 2100-1 (1 of 2) Requirements for Sanitary Sewer in the Vicinity of Pressure Water Mains Los Angeles County Road (Public Works) Department Standard Drawings Standard Plan 1130-1 Typical Sidewalk Details Los Angeles County Waterworks Districts (Public Works) Department Standard Drawings Standard Plan W-50 Design Requirements for Water Mains in the Vicinity of Sanitary Sewers Standard Plan W-6 (1&2) Backflow Prevention Detector Assembly (For Reference Only) Standard Plans for Public Works Construction (SPPWC) SPPWC Standard Plan 110-1 Driveways SPPWC Standard Plan 120-1 Curb and Gutter SPPWC Standard Plan 132-2 (1 and 2) Concrete Pavement Details SPPWC Standard Plan 134-1 Concrete Pavement Joint Details California Department of Transportation (CALTRANS) Standard Plans A20A Pavement Markers and Traffic Lines A20B Pavement Markers and Traffic Lines A20D Pavement Markers and Traffic Lines A24A Pavement Markings – Arrows A24C Pavement Markings – Symbols and Numerals A24D Pavement Markings – Words A24E Pavement Markings – Words ES-5A Electrical Systems (Detectors) ES-5B Electrical Systems (Detectors) ES-5D Electrical Systems (Detectors) The details for the work are shown on City of Pasadena Water and Power Department contract drawings, and are provided as attachments: Work Order 54214 — Catalina Avenue from Corson Street to California Boulevard Drawing E-1851, Sheets 1 to 11 (Design Drawings) CONSTRUCTION SCHEDULE, CONTRACT TIME, AND LIQUIDATED DAMAGES Failure of the Contractor to complete the Work within the contract time stated in the Bid Specifications will result in damages being sustained by the City of Pasadena. Such damages are, and will continue to be, impracticable and extremely difficult to determine. For each working day in excess of the contract time the Contractor shall pay the City of Pasadena, or have withheld from monies due it, the sum of $1,000 per day. Execution of the Contract shall constitute agreement by the City of Pasadena and the Contractor that this represents the minimum value of the costs and actual damage caused by the failure of Contractor to complete the Work within the contract time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delays occur. HOLIDAY SEASON / ROSE PARADE Attention is directed to Chapter 12.24 of the Pasadena Municipal Code entitled "Excavations," and Board Policy Statement as set forth in Motion 25405 dated September 5, 1967, both incorporated by reference. In general, all streets shall be free and clear of excavations and other construction during the period of Thanksgiving week Monday through one week after New Year's Day for business and commercial districts, and mid-December through one week after New Year's Day for all other areas. Accordingly, the Contractor will be required to shut down construction operations which would impede traffic movement during this period unless otherwise directed by the Engineer. Any existing excavations shall be backfilled, compacted, and temporarily repaved before the shutdown date. No staging of equipment, vehicles, or other construction work shall occur in the public right-of-way during the moratorium period. Catalina Avenue from Corson Street to California Boulevard are subject to the mid-December through one week after New Year's Day moratorium. Bidders shall reflect any costs of such shutdown in the various items of the Bid Proposal, and no additional payment will be allowed therefor. The Holiday Moratorium Map, showing the applicable shutdown period for all locations in the City, is available on the City of Pasadena's website and at the public counter of the City's Public Works and Transportation Departments. CONSTRUCTION ORDER OF WORK The Contractor shall fully complete all work on Catalina Avenue from Corson Street to California Boulevard, including water main installation, backfill, permanent paving, striping, and all other contract work within those limits. Work shall be scheduled so as to lessen the impact upon residents and businesses within the area. All construction shall conform to Sections 6-1 to 6-3 of the Standard Specifications and shall proceed in a smooth, efficient, timely, and continuous manner. Once construction is started in a work area, the Contractor will be required to work continuously in that work area until construction has been completed and the work area is open and accessible to both vehicular and pedestrian traffic in a manner approved by the General Manager or his/her authorized representatives before the next stage of work will be allowed to begin. Once construction is started in a work area, the Contractor shall not withdraw manpower or equipment from that work area in order to start construction in another work area if doing so, in the opinion of the General Manager or his/her authorized representatives, delays the completion of the work presently under construction. The Contractor shall maintain continuous access to all residents and/or businesses within the project limits, unless prior approval has been obtained from the General Manager or his/her authorized representatives to close such access or drive approach. No stockpiling of material or construction equipment in or on public streets or sidewalks will be permitted on this project. Material and equipment placed in or on public streets, sidewalks, and construction areas shall be used the same day. If the Contractor leaves equipment or material in the public street at the end of a work day, the General Manager or his/her authorized representatives will direct the Contractor to cease this activity immediately. If the activity continues, the City reserves the right to stop work at the Contractor's expense until corrected. The Contractor shall obtain a storage yard for materials and construction equipment for the duration of this contract in order that work on this project proceeds in an efficient manner. Said storage yard shall conform to all City regulations, ordinances, and zoning requirements and shall be maintained in a neat and orderly manner. Additional requirements have been established to minimize impacts on businesses and residents: A. No more than 1,200 feet of continuous underground work may be under construction at a time on the same street. Construction will be deemed complete for the purpose of this condition when all final paving is complete as determined by the Water and Power Department inspector. B. To control dust and debris on City streets, the Contractor shall implement a plan to keep streets and sidewalks clean. The plan shall include, but is not limited to, hand sweeping of sidewalks and streets, use of a power street sweeper (not a power broom), placing all excavated material directly onto trucks, and limiting stockpiling of materials. C. No two contiguous bus stops shall be closed on the same side of the street at the same time. D. Jack pits and/or potholes must be backfilled and temporarily paved by the end of each work day. The Contractor is responsible for maintaining all temporary paving areas throughout the duration of the project until permanent paving is completed. The Contractor shall perform maintenance of temporary paving areas as directed by the General Manager or his/her authorized representatives immediately to keep the temporary paved areas in a safe and acceptable condition. E. When using steel plates to cover any type of trenching, the plates must be placed and secured in such a manner that noise does not become a nuisance to residents and/or businesses. If the plates become a nuisance, the Contractor shall, at no additional cost to the City, remove the steel plates within 24 hours of notification and install temporary paving in their place. See Traffic Control Requirements for steel plate specifications. F. No heavy or noisy equipment, including but not limited to cranes, backhoes, air compressors, concrete saws, and chain saws, shall be operated prior to 7:00 a.m. G. The City has made no test borings or potholing for the identification of existing utilities; therefore, the depiction shown in the design plans for the tie-ins may not be exact. Additional labor and materials not represented in the design plans may be necessary to complete the tie-in connection to the existing water main(s). H. Payment for the tie-in connection shall be included in the lump sum price for the applicable Tie-Ins items (items 1 to 12) in the Bidder's Proposal and shall include full compensation for all labor, equipment, materials, and incidentals necessary to complete the tie-in connection to the existing water main(s). CHANGES IN WORK OR QUANTITIES, EXTRA WORK The City shall have the right to make changes in the work in order to accomplish the purpose of the project. Such changes will not void the Contract or release the sureties on any bonds given to ensure performance. No change in the work shall be made without a prior change order approved by the General Manager or his/her authorized representatives. Unless such order is first obtained, the Contractor shall not be entitled to payment for extra work, material, or other expenses in connection with the change. However, if any such change reduces the cost of the work, the City shall be entitled to deductions from the contract price whether or not such change order is first obtained. In reference to Section 3 of the Standard Specifications for Public Works Construction (Green Book), latest edition, the value of any extra work or materials caused by such changes shall be determined in one or more of the following ways, to be selected by the General Manager or his/her authorized representatives. Upon receipt of written direction from the General Manager or his/her authorized representatives, the Contractor shall submit a detailed cost proposal within ten (10) calendar days. Failure to submit within this period may result in the City determining the value of the change unilaterally in accordance with the methods listed below. All cost proposals shall include the following: A. An itemized breakdown of all costs, segregated by material and labor. B. Subcontractor quotes and backup documentation for any portion of work to be performed by a subcontractor. C. A detailed narrative describing the scope of work, what is being performed, and the reason the change is necessary. The value of the change shall be determined in one or more of the following ways: A. By an acceptable lump sum proposal from the Contractor. B. By applicable unit prices specified in the Contractor's proposal. C. By actual necessary cost plus 15 percent for general superintendence, general expense, overhead, and profit. The actual necessary cost shall include all expenditures for material, labor, insurance, and supplies furnished by the Contractor. Except as specifically provided above, the Contractor shall not be entitled to recover anticipated profit, lost profits, losses, or damages of any nature in connection with any change in the work. The General Manager or his/her authorized representatives shall have authority to approve change orders. Each change order shall be in writing and shall state: A. The original contract price, the maximum adjustment amount, and the original time for completion; and B. The increase or decrease in the contract price and any change in the time for completion due to the change order. As a condition of entitlement to any additional compensation or time extension, the Contractor must submit a complete cost proposal within ten (10) calendar days of receiving written direction from the General Manager or his/her authorized representatives. Failure to submit a complete cost proposal within this period shall constitute a waiver of any claim for additional compensation or time extension arising from that change, and the City shall have the right to determine the value of the change unilaterally in accordance with the methods listed in this section. Incomplete submittals shall not toll the ten (10) calendar day period. For any work performed on a time and materials basis, the Contractor shall prepare and submit a daily T&M sheet to the City inspector for review and signature at the end of each work day on which T&M work is performed. Each T&M sheet shall identify the date, location, scope of work performed, all labor classifications and hours, and all equipment and materials used. T&M sheets not signed by the City inspector on the day the work is performed shall not be accepted as the basis for payment unless the Contractor can demonstrate to the satisfaction of the General Manager or his/her authorized representatives that the failure to obtain a signature was due to circumstances beyond the Contractor's control. The Contractor waives any claim for T&M compensation for work not documented on a City-approved daily T&M sheet submitted in accordance with this section. In the event the Contractor submits a change order request or claim that is disputed or rejected by the General Manager or his/her authorized representatives, the City reserves the right to withhold from subsequent progress payments an amount equal to the value of the disputed claim until the dispute is resolved. Withheld amounts shall be identified in writing to the Contractor with each affected progress payment. Resolution of a disputed claim shall occur through the change order process described in this section or, if necessary, through the dispute resolution procedures set forth in the contract. The withholding of amounts pursuant to this section shall not constitute a breach of contract by the City and shall not entitle the Contractor to stop work or claim additional compensation for any resulting delay. UNDERGROUND UTILITY MARKING SERVICE The Contractor shall utilize Underground Service Alert (USA) of Southern California (1-800-422-4133) to obtain marking of underground pipeline and utility locations. The Contractor shall notify USA at least two (2) working days in advance of beginning any excavation and/or jacking operations. Utilities that are not subscribers or members of USA shall be notified separately and independently. To avoid unnecessary marking of utilities in street and sidewalk areas, the Contractor shall specifically indicate those areas where underground utility information is needed using a temporary water-based marking chalk ("AERVOE" brand or approved equal) with a visible life not to exceed three (3) weeks. Such indications shall be limited to only those areas where the Contractor's operations could damage buried utilities. All USA markings requested by the Contractor shall be removed by the Contractor at his/her expense. If the Contractor fails to properly and completely remove all USA markings, the City will perform the removal and bill the Contractor for all direct and indirect costs. CONTRACTOR’S GUARANTEE The Contractor shall warrant and guarantee the entire Work and all parts thereof, including that performed and constructed by subcontractors and others employed directly or indirectly on and for the Work, against faulty or defective materials, equipment, or workmanship for a period of two Source: OpenGov https://procurement.opengov.com/portal/pasadena/projects/317344 Canonical URL: https://govcontractfinder.com/contracts/installation-of-ductile-iron-water-mains-in-catalina-ave-wd-opengov-530-project-317344